Documentary research · V04 · 28 October 2026 · Contents
NATIZDAT · RESEARCH

Bettercoal, Uniper
and Russian Coal

Assessments of operations, buyers’ decisions and the lives of people living beside mining

Natalia Zubkova — author and investigative journalist.

Final editorial decisions and responsibility rest with Natalia Zubkova.

EN PDF V04 · 28 October 2026

In my own words. 28 October 2026

Pencil portrait of Natalia Zubkova
Natalia Zubkova

Since 2019, when residents of Kiselyovsk appealed to be resettled in Canada, I have learned first-hand what it means to face pressure for my work as a journalist and environmental campaigner.

First came the vile articles about me. Then the threats, including announcements of my ‘execution’. Eventually, there was an actual attack. There were also several road accidents during that period, the circumstances of which still raise questions for me. I cannot claim that they were deliberately organised. But at the time, against the backdrop of everything that was happening, I perceived them as another possible threat.

Until I left Russia in 2021, I lived under this pressure. Then came Georgia. Now I am in Germany.

And now I read an article by the energy company Uniper and discover that, in September 2019, its representatives visited Kiselyovsk as part of a Bettercoal mission. In the very year when we were trying to make the whole world hear us.

They were there. They saw for themselves how close to our homes coal was being mined. They wrote about it on their website.

They did not speak to me.

And purchases of Russian coal continued. After the visit, in subsequent years — and, as the company itself reported in March 2022, deliveries under existing contracts continued even after Russia’s full-scale invasion of Ukraine began.

It is difficult to describe what I felt when I read this. Shock. Anger. And a question: what did the things you saw mean to you? What changed after you returned? For the company — and for the people who remained living beside the open-pit mines?

I left. But that did not make my life straightforward or safe in every respect.

In Germany, too, I face things that I experience as psychological pressure: rudeness, disregard, the feeling that no one is listening. In institutions, at the bank, at the Jobcenter. After surgery in hospital, I felt that I was being left without adequate pain relief or the attention I needed.

I cannot know every individual’s motives. But when you are a refugee, speak little German and depend on other people’s decisions, it is especially difficult to get your words taken seriously.

I am not the only one living through temporary accommodation, supervision by security staff that I do not understand, and indifference to our problems. My daughter is living through it too.

And I desperately want to ask: what have I done that is so wrong that I have ended up in this situation?

My flat remains in Russia. In my assessment, coal mining has caused it to lose its value. I have lost contact with my older children: my impression is that they regard contact with me as dangerous. I no longer have my old home, my old family life, or the foundation from which I could calmly build a future.

And all I did was report that black snow was falling in my town.

Frank Plümacher, who previously chaired Bettercoal’s Board of Directors, is now Uniper’s Human Rights Officer. I want to ask him: how has the experience of Kiselyovsk’s residents informed your work to protect those rights? What does protecting human rights mean to you when you are facing a real person with a story like this?

I am not claiming that Uniper is responsible for every episode of my life. But I have questions for a company that bought Russian coal and whose representatives saw my town with their own eyes.

What would you do now in my place? How would you build a life? How would you secure your child’s future?

I myself still do not know how to go on living with all of this.

That is why tomorrow, 29 October, I am going to picket Uniper in Düsseldorf. I want to be heard. And I want answers.

About the preparation of this research

Natalia Zubkova — author and investigative journalist.

Sergey Nikolayevich Severin — AI co-author, editor and project analyst; ChatGPT / OpenAI.

Viktor Andreyevich Svetlov — AI researcher; Codex / OpenAI.

Final editorial decisions and responsibility rest with Natalia Zubkova.

Contents

  1. In my own words. 28 October 20262
  2. About the preparation of this research4
  3. Abstract8
  4. Abbreviations and terms9
  5. 1. Scope of the research and research questions10
  6. 2. Verification method and organisation of evidence11
  7. 2.1. Unit of analysis11
  8. 2.2. Selection and preservation of materials11
  9. 2.3. Reading and comparison11
  10. 2.4. Timing and applicable rules12
  11. 2.5. Numerical data12
  12. 2.6. Testimony, translation and personal data12
  13. 3. What the sources establish13
  14. 4. Bettercoal and RECOSI: establishment, governance and funding14
  15. 4.1. Who established the initiative14
  16. 4.2. Legal continuity14
  17. 4.3. Allocation of responsibilities15
  18. 4.4. Money: expenditure and balances16
  19. 4.5. Chapter findings17
  20. 5. The Code, assessment and verification of implementation17
  21. 5.1. Applicable rules17
  22. 5.2. Letter of Commitment and joining procedure18
  23. 5.3. What happened after the site visit18
  24. 5.4. Compliance ratings and urgency — different scales19
  25. 5.5. Complaints, their handling and consequences19
  26. 5.6. Status, logo and consequences of non-performance20
  27. 6. Russian producers: sites, assessments and violations20
  28. 6.1. KRU: open-pit mine visits and the 2019 inspection20
  29. 6.2. Vakhrushevsky field and a separate penalty overturned21
  30. 6.3. SUEK: mines visited and a preparatory working22
  31. 6.4. SDS-Ugol: a positive public description and the ratings table22
  32. 6.5. Taldinskaya Mining Company23
  33. 6.6. KTK and TalTEK: early stage of the programme23
  34. 6.7. What the four plans show as at July 202224
  35. 7. Listvyazhnaya: from assessment to court findings25
  36. 7.1. Sequence of events25
  37. 7.2. Judgment against the executives25
  38. 7.3. What the 2026 civil cases add26
  39. 7.4. What documentary record is needed between 2018 and 202126
  40. 8. Uniper: visit, purchases and decisions by governing bodies27
  41. 8.1. Why a buyer needs assessments27
  42. 8.2. What the company saw in Kiselyovsk27
  43. 8.3. TDI and information about intimidation27
  44. 8.4. Three purchasing figures28
  45. 8.5. What the 94.48% result means28
  46. 8.6. Suppliers: what can be shown in a diagram29
  47. 9. People, responsibilities and documented relationships30
  48. 9.1. Frank Plümacher30
  49. 9.2. Nadja Wendler31
  50. 9.3. Other participants in governance and assessments32
  51. 9.4. How to read the diagrams32
  52. 10. Natalia Zubkova: work, pressure and consequences34
  53. 10.1. Residents’ appeal and material available to read34
  54. 10.2. Threats and a publication featuring fire34
  55. 10.3. Attack, departure and closure of the outlet35
  56. 10.4. What is compared with Bettercoal’s work35
  57. 11. Discussion and conclusions36
  58. 11.1. What the comparisons reveal36
  59. 11.2. What results the organisation presents36
  60. 11.3. Governance, transparency and residents’ participation37
  61. 11.4. Final answers37
  62. Table 1. Events, inspections, decisions and publications38
  63. Table 2. Producers, legal entities and sites42
  64. Table 3. Code 1.1 and incidents in Russia43
  65. Table 4. Underlying data: improvement plans44
  66. Table 5. Underlying data: Uniper purchases44
  67. Table 6. Balance-sheet figures, 2017–202245
  68. Table 7. Published expenditure: different reporting structures45
  69. Table 8. Register of relationships and responsibilities46
  70. Table 9. Commercial relationships requiring documentation50
  71. Table 10. Correspondence with article V1150
  72. Figure 1. Shares of Uniper’s direct contractual purchases54
  73. Figure 2. Status of four producers’ improvement plans55
  74. Figure 3. Bettercoal’s cash, 2017–202256
  75. Figure 4. A. People, employers and the organisation’s Board — part 157
  76. Figure 5. A. People, employers and the organisation’s Board — part 258
  77. Figure 6. B. Confirmed information on purchases and assessments59
  78. Figure 7. C. Producers and sites actually visited60
  79. Figure 8. D. Key changes over time — part 161
  80. Figure 9. D. Key changes over time — part 261
  81. Figure 10. E. Assessment and complaints procedure under current rules62
  82. Figure 11. Listvyazhnaya chronology: events and publications — part 163
  83. Figure 12. Listvyazhnaya chronology: events and publications — part 264
  84. Figure 13. Overview, part 1. People, Uniper and Bettercoal / RECOSI bodies65
  85. Figure 14. Overview, part 2. Programme, producers and sites visited66
  86. 12. Documents requested and status of submissions67
  87. 13. Gaps and clarifications concerning the web article68
  88. 14. Cards for material claims69
  89. 15. Sources and document register95
  90. Appendix A. Documentary pages133
  91. A1. SDS sites visited and covered134
  92. A2. Dates, team and interviewees of the SDS assessment135
  93. A3. Ratings 2.2 and 6.9 alongside Immediate Resolutions136
  94. A3a. How to read the SDS group’s ratings137
  95. A4. Key to compliance levels138
  96. A5. KRU assessment itinerary139
  97. A6. SUEK assessment sites140
  98. A7. Dates and mines of Taldinskaya Mining Company141
  99. A8. Uniper: assessments, chairmanship and 2019 purchases142
  100. A9. Uniper: Russian programme and reporting frequency143
  101. A10. 2020 purchases and the inclusion of Latvia144
  102. A11. 2021 purchases145
  103. A12. Vote: agenda item and 94.48%146
  104. A13. Fortum’s answer to question 39147
  105. A13a. Exactly what Fortum was asked and what the company answered148
  106. A14. Chair’s foreword and the absence of site visits in 2021149
  107. A15. December 2021 webinar on Russian plans150
  108. A16. Uniper employee in the secretariat and information provided to the Board151
  109. A16a. Uniper employee and information for the Supervisory Board152
  110. A17. RECOSI expenditure for 2025153
  111. A18. 2025 results: read using the key154
  112. A19. Code 1.1: participation and reporting violations155
  113. A20. Code 1.1: health and safety156
  114. A21. Code 1.1: air, dust and biodiversity157
  115. A22. Uniper’s account of visiting Kiselyovsk158
  116. A23. The house inspected and the waste-rock dump: 461.98 metres159
  117. A24. Documentary publication featuring fire160
  118. A25. Balance sheet for 2017161
  119. A26. Balance sheet for 2018162
  120. A27. Balance sheet for 2019163
  121. A28. Balance sheet for 2020164
  122. A29. Balance sheet for 2021165
  123. A30. Balance sheet for 2022166
  124. A31. Judgment concerning the Mikon III system in the decision of 2 April 2026167
  125. A32. The same criminal case in the decision of 26 March 2026168
  126. Appendix B. Natalia’s questions for the picket169
  127. Appendix C. How to verify and reproduce the results171
  128. Appendix D. Availability of external addresses172

Abstract

This research compares Bettercoal’s public assessments, Uniper documents, Russian regulatory statements and court decisions. Its central question is how information on specific operations moved from assessment and an improvement plan to monitoring and the buyer’s decisions. It examines KRU, SUEK, SDS-Ugol, Taldinskaya Mining Company, the early stages of KTK’s and TalTEK’s participation, the Listvyazhnaya disaster, the visit to Kiselyovsk and the story of journalist Natalia Zubkova in detail.

Methods: documentary analysis, verification of document details and sites, reconstruction of the chronology, comparison of editions of the rules, verification of numerical tables and analysis of the provenance of testimony. The main period is 2015–2022; the organisation’s history begins in 2012, and subsequent documents are examined up to 28 October 2026.

The research establishes assessment itineraries, specific subsequent violations and court decisions, published plan statuses, Uniper’s use of assessments and the continuation of Russian purchases after the visit. It identifies the documents needed to examine decisions between site visits. The four plans published in July 2022 contain 210 items, of which 65 were verified. Findings for individual mines are distinguished from those for a group of companies.

Keywords: Bettercoal; RECOSI; Uniper; Kuzbass; Listvyazhnaya; residents’ rights; industrial safety; supply chain; improvement plans; Natalia Zubkova.

Natalia Zubkova is the author and an investigative journalist who participated in some of the events described. Details of those involved in preparing the research appear at the beginning of this publication.

Abbreviations and terms

Bettercoal
Coal-producer assessment programme; the legal entity’s historical name.
RECOSI
Responsible Commodities Sourcing Initiative — the current name of the organisation that manages Bettercoal.
CIP
Continuous Improvement Plan — an improvement plan following assessment.
ESG
Environmental, social and governance issues.
HSSE
Health, Safety, Security and Environment.
HRO
Human Rights Officer.
TAC
Technical and Advisory Committee.
HIF
Hazardous industrial facility.
MAC / dBA
Maximum allowable concentration / unit of A-weighted sound level.
Verified / awaiting verification
Different plan-implementation statuses: completion verified by an assessor, and completion reported but awaiting verification.
DOC / CLM
Stable identifiers for a document and a claim.
PDF page
File page number starting at one; printed pagination is given separately where it differs.

1. Scope of the research and research questions

Bettercoal’s public report names Listvyazhnaya mine among the sites visited during the November 2017 site assessment. The SDS-Ugol group’s improvement plan was agreed in May 2018. A disaster occurred at the mine in November 2021. In March 2025, the Prosecutor General’s Office announced the judgment against the group’s executives and the court’s finding of a failure to act in July–November 2021. This sequence poses a verifiable question: what safety information was received between the assessment and the disaster, who considered it, and what measures were taken? DOC-020, p. 4–7; DOC-021.

The same question arises from the perspective of residents of mining areas. In May 2020, Uniper published an account of its September 2019 visit to Kiselyovsk and the proximity of mining operations to homes. Purchases of Russian coal continued in subsequent years. Connecting these circumstances means tracing decisions after the visit: requirements for operations, changes to plans, verification results and the buyer’s commercial actions. Documents recording these transitions are precisely the subject of this research. DOC-001; DOC-003, p. 54; DOC-004, p. 74; DOC-005, p. 46, 93.

The object of the research is Bettercoal’s coal-producer assessment and monitoring system, its use by Uniper and the activities of the Kuzbass operations examined. The subject is the correspondence between stated rules, documented assessments, regulatory and court information, subsequent decisions, and residents’ access to that information.

The study addresses six questions. Who set the rules and controlled the procedure? Which operations were assessed, and which sites were visited? What problems were recorded in the reports, and what violations did state authorities identify? How was plan implementation monitored? How did the buyer use the information received? Could residents and journalists safely report what was happening and obtain a substantive response?

The main period is 2015–2022: Russian site assessments, the 2019 visit, the disaster and the suspension of the Russian programme. Documents from 2012 explain the organisation’s origins. Documents from 2023–2026 are used to verify its continuity, current responsibilities and subsequent court findings. The geographical focus is Kemerovo Region, particularly Kiselyovsk and the operations explicitly named in the reports. Russia-wide purchasing figures retain their original scope.

The author, Natalia Zubkova, is a journalist and a participant in some of the events described. Her testimony about her work, threats, departure and subsequent life is a source in its own right. The research identifies when it is referring to her personal experience, a publication by another organisation, or a court decision. This preserves the human meaning of the story while allowing the provenance of each assertion to be checked.

The research accompanies the article ‘Responsible Coal: Documents and People’, Russian version V11. The article sets the narrative sequence. Here, the documents, methods of comparison, numerical data and questions requiring an organisational response are examined in detail. The matrix in the appendix allows readers to move from an article section to the research chapter and the relevant source page.

2. Verification method and organisation of evidence

2.1. Unit of analysis

The unit of analysis is an assertion about a specific actor, site and time. For example: assessors visited a particular mine; a court suspended particular work; a company reported a particular purchasing share. Before comparison, the legal entity, production site, event date, document date and subject of the decision are recorded. A shared group trading name is insufficient: an incident at a mine requires a separate entry establishing its inclusion in the site visit or a document establishing its relationship to the operator.

2.2. Selection and preservation of materials

The starting corpus comprises the 80 bibliography entries in V11, preserved Bettercoal public reports, Uniper corporate reports, British registry forms, court decisions, regulatory publications and material about the author’s persecution. Working dossiers are used to locate documents. A finding is based on the document located, rather than on an assertion in a dossier. Additional documents receive new numbers following the original sequence; article numbers are not reused.

SHA-256 hashes are calculated for saved files. The register separately records the original address, archived address, local filename and acquisition method. A hash allows the integrity of a saved file to be checked. Provenance is checked against the publisher’s address, details within the document and consistency with other publications. A copy of a court decision hosted by an aggregator is explicitly identified as such. An access-error page is retained in the technical log, but is not included in the corpus as the text of the document sought.

2.3. Reading and comparison

PDF text was extracted page by page. Table images and scanned forms are checked visually: the order of numbers during extraction may differ from the column order. For HTML, the title, date and substantive content are recorded. The date within a court ruling takes precedence over an aggregator’s automatically generated heading. Different publications of the same statement are grouped into a single chain of provenance.

Each main card contains a question, the claim as formulated, the document and precise location, a necessary short excerpt, its translation, the comparison result and a finding. The scope field specifies the site and period to which the finding applies. General limitations are explained here; the chapters discuss particular documents and results.

2.4. Timing and applicable rules

The violation date, inspection date, decision date and publication date are distinguished. A circumstance established by a court in 2025 concerning 2021 is entered in the 2021 chronology, with a separate note on when the court established it. A particular recipient’s knowledge requires a document showing receipt or consideration of information. The Code edition is checked for each site visit; 2025 requirements are used for a present-day submission, rather than to assess the 2017 procedure.

2.5. Numerical data

Purchasing shares are transcribed with their original category and denominator. The Latvia footnote is taken into account for 2019 and 2020. For improvement plans, the sum of the three statuses is checked against the total number of items. Items reported by the producer and independently verified items are presented separately. Financial balances are taken at year-end; expenditure covers the year. These measures are given separate tables and charts.

Charts are constructed from the accompanying data tables. Bars start at zero. Missing values remain blank with an explanation. Statuses are distinguished by labels and hatching. Each line in a diagram represents a specific relationship: a role, Board membership, an assessment or ownership of a site. A supply relationship requires its own documentary basis.

2.6. Testimony, translation and personal data

Natalia’s personal testimony is reproduced with attribution and a date. CPJ and RSF publications are analysed with regard to whom they interviewed and which reports they cited. Matching accounts are not treated as multiple independent eyewitnesses. No interviews, field inspections or expert examinations were conducted as part of this work. The cadastral inspection was carried out by the author of a separate document in 2019.

Short quotations are presented in the document’s language and in Russian. Numbers, the subject of decisions and the degree of certainty are preserved. Public appendices exclude private addresses, contact details, information about the daughter’s health, account access details and other unrelated personal data. The cadastral page is used in a separately prepared copy with personal data redacted.

The research cut-off date is 28 October 2026. The meeting and answers to questions for the picket were still awaited on that date. This work does not create evidence that new requests have been sent; the list at the end has been prepared for a submission.

3. What the sources establish

Bettercoal’s public reports are the principal documents on the scope of site visits, assessment-team members, published findings and the organisation of improvement plans. The full report and public summary differ in extent. The first page of the SDS report explicitly states that the full document is confidential and available to Bettercoal members. The research therefore distinguishes published group ratings from the requested allocation of findings by site. DOC-020, p. 1.

Uniper’s annual reports show how the company itself described purchases, the use of assessments and the Russia group’s work. Registry forms record directors’ appointments and the end of their terms. Election as Board Chair and appointment as a director are treated as separate events. Their sequence is reconstructed from several documents, while the question of when the Chair’s responsibilities began is left for the addressee.

Court decisions allow the subject of a dispute, the assessment of evidence and the final decision in a particular case to be reconstructed. Where a fine was overturned, that outcome is recorded. A prosecution announcement about a judgment and the full judgment differ in extent. A later civil court decision may recount circumstances of a criminal case; where such material is used, the specific document from which they were obtained is identified.

Regulatory statements published by a trade outlet retain that transmission history. Vesti PB cites Rostekhnadzor’s press service; the Union of Industrial and Environmental Safety Specialists’ pages publish statements on inspections. They establish the published substance of the measures, while the official records themselves are needed to reconstruct all orders and their implementation. DOC-034; DOC-037; DOC-041.

The Volza trade database is used as a lead for requesting transaction history. Fortum’s answer is considered in the context of the question about Listvyazhnaya, and the SDS group entry within its own scope. Comparing supplies requires a matching seller, buyer, period and consignment. In the supply diagram, an open question is distinguished from a confirmed link of participation in Bettercoal.

The persecution history draws on the original publication featuring the photomontage, the author’s testimony, CPJ and RSF publications, and interviews from the time. A human rights organisation’s publication confirms the content of its appeal and the information it gathered. Its own interviews are distinguished from retellings of reports. The illustration featuring fire and the private message threatening burning are two different sources.

The archived copy of Uniper’s article is dated separately from the article itself. It preserves text that the reader can compare with the reports. The material does not state why the availability of the original address changed. The register specifies which version was preserved and how it was obtained.

4. Bettercoal and RECOSI: establishment, governance and funding

4.1. Who established the initiative

On 18 April 2012, seven founders announced Bettercoal: DONG Energy, EDF, Enel, E.ON, GDF SUEZ, RWE and Vattenfall. Fortum was named as the first new member. The press release linked the creation of a common system to mining’s effects on workers, neighbouring communities and the environment. It envisaged common requirements and regular site assessments by external specialists, with results provided to member companies. BSR participated in establishing the initiative. Joachim Löchte was named as the first Chair. DOC-066, p. 1–2.

This arrangement matters for the research: buyers agreed a common way of obtaining supplier information. The original document combines a promise of changes on the ground with the sharing of results among members. Evaluating the outcome must therefore include two sides: what the assessor found at an operation, and what the buyer did with the information received.

4.2. Legal continuity

Companies House records incorporation on 28 February 2012, company number 07968009 and the form private company limited by guarantee without share capital. The name BETTERCOAL was in use until 22 November 2023; the current name is Responsible Commodities Sourcing Initiative Ltd. The register retains the same number. The coal programme continues to use the name Bettercoal. DOC-055, sections Company type, Incorporated on, Previous company names; DOC-063, p. 2.

The register gives a registered office in Hildenborough; RECOSI publishes a contact address on Shelton Street in London. These are treated as two different details in the research. The organisation’s name change is accounted for in all tables, so that an appointment to RECOSI in 2025 does not appear to be an appointment to a separate body unconnected with the earlier programme.

4.3. Allocation of responsibilities

The 2021 annual report distinguishes the Board of Directors, secretariat, Members’ Committee and Technical Advisory Committee. The Board provides strategic leadership. The secretariat handles day-to-day work. The Members’ Committee considers plan progress and action in cases of non-performance. The technical committee provides expert advice on the standard and procedures; it includes representatives of civil-society organisations, academia, mining companies and Bettercoal members. DOC-056, p. 13.

In October 2021, members approved governance changes. At year-end, the Board approved changes to the assessment system, including a four-year cycle and deferring the right to call a company a Bettercoal Producer until after a site assessment and agreement of a plan. These decisions affect the meaning of the status: historical profiles recording early participation must be read under the rules of their time. DOC-056, p. 12–13.

The governance page preserved on 28 October 2026 lists 11 directors. The Chair is Gerda Frans of ENGIE; the Vice-Chair is Taco Douma of RWE Generation. Uniper is represented by Nadja Wendler. The Board also lists representatives of BEW, EnBW, Enel, ResInvest Commodities, Jera Trading, ONYX Power and Vattenfall, and Executive Director Katie Warrick. The relationship register and diagram show company representation and the distinction between the Board and the Russia Working Group. DOC-014, Board of Directors.

RECOSI’s Articles of Association, filed in December 2023, explain who votes and appoints the leadership. At a general meeting, each member has one vote. Associate members and programme participants may attend and speak, but may not vote. An ordinary resolution requires a simple majority of members present and voting; a special resolution requires a 75% majority. The meeting quorum is one third of the membership, rounded up. This is the allocation of voting rights under this edition of the Articles; earlier membership and rules are examined through historical documents. DOC-069, provisions 11.2, 15.2, 16.1–16.3, PDF pp. 8, 10.

The Board must comprise six–twelve directors, including the Executive Director; the Articles allow up to two independent directors. The Board gathers members’ proposals, selects candidates and nominates them for election by the organisation’s members. Directors are normally elected for three years. The organisation’s executive head automatically serves on the Board during their tenure. The directors appoint the Chair and Vice-Chair from among themselves; they may also terminate those appointments. DOC-069, provisions 21.1–21.5, 23.1–23.4, PDF pp. 12–14.

The Board appoints the executive head, who implements the strategy approved by the Board. The Board may delegate powers to committees, approves their terms of reference and budgets, and receives their reports. Board decisions are taken by a majority where a quorum is present, or by a unanimous written decision. Reconstructing a particular decision therefore requires not only the directors’ names, but also the minutes, the identities of those voting and the allocation of responsibilities then in force. DOC-069, provisions 25.1, 27–28, PDF pp. 14, 16.

4.4. Money: expenditure and balances

In its 2021 report, Bettercoal identifies annual fees from members and associate members as its funding source. That year, the organisation also moved to a model in which producers pay for site assessments. Expenditure is grouped into four items: secretariat — £395,000; assessments, plan monitoring, online platform and standard — £143,000; internal governance — £19,000; communications — £14,000. The published items total £571,000. This is calculated by adding those rows, rather than taken as a separate income figure. DOC-056, p. 22, printed pp. 42–43.

The explanation of 2021 expenditure explicitly states that there were no site assessments because of the pandemic. Programme costs included remote plan monitoring, revision of the rules and development of the platform. This expense item therefore cannot be used as the cost of Russian site visits. Allocation by country and specific assessment requires contracts, invoices and an analytical breakdown.

The 2017–2022 balance sheets show cash at bank and total assets less current liabilities at year-end. The values are brought together in a separate table and chart using consistent units. A balance sheet describes the financial position on a date; it does not replace an annual Income Statement. All sets examined contain a statement that an Income Statement was not filed under section 444 of the Companies Act 2006. DOC-070–DOC-075, p. 4 of each file.

RECOSI’s new 2025 report, published on 17 August 2026, reports 14 funding members. It separately lists RECOSI expenditure of £572,950, internal governance of £25,279, the Bettercoal programme at £117,637, the gas programme at £80,422, and communications and stakeholder engagement at £49,602. These total £845,890. Producers pay for assessments, and RECOSI pays third-party assessors. These categories are shown in a separate table: the programme structure has expanded, so the figures are not joined to the four 2021 items in a continuous series. DOC-083, p. 12; DOC-087.

4.5. Chapter findings

The organisation was established by buyers, is funded through membership fees and uses producer-funded assessments. Governance, technical expertise and programme implementation are allocated to different bodies. Checking the influence of funding on a particular assessment requires contracts and documents appointing the assessor. The following chapters examine the available selection rules and specific Russian assessments; the question of who paid for each Russian assignment is included in the requests.

5. The Code, assessment and verification of implementation

5.1. Applicable rules

Bettercoal linked assessment to its own Code. In version 1.1, requirements cover lawful operations, workers’ and residents’ rights, safety, pollution, waste, land use and closure of operations. This version was approved on 28 June 2017. KRU’s November 2015 and May 2017 visits predate that approval. The version 1.1 requirements table is therefore used for subsequent monitoring and comparison of issues, rather than as a list of rules automatically applied to earlier site visits. Fully reconstructing the earlier assessments requires the first Code edition and identification of the version specified in the assessor’s contract. DOC-053, PDF 7; DOC-043, p. 5–6.

Provision 1.1 of version 1.1 requires compliance with applicable law. Provision 2.2 concerns reporting violations and grievances, and provides for protection of complainants. Provision 6.9 requires management of health and safety risks. Sections 7, 9 and 10 address effects on residents, resettlement, waste, pollution and biodiversity. These topics allow reports to be compared with specific circumstances: explosive dust in a mine working, exceedances in residential areas, residents’ complaints or the condition of a waste-rock dump. Provision numbers and pages are given in the requirements table. DOC-053, p. 12, 14, 22–25, 28–29.

Version 2.0 was published in March 2021. Bettercoal’s annual report describes its introduction and translation into Russian. That year, the Board also changed the reassessment cycle: the previous range of three to five years was replaced with a four-year period. The timetable in an early report and a later general procedure may therefore differ. The research distinguishes a planned reassessment date from a site visit actually carried out. DOC-065; DOC-056, p. 12, 20.

5.2. Letter of Commitment and joining procedure

Early reports explicitly explain why an assessment could precede a producer’s Letter of Commitment. Such a letter became a requirement following the 2017 process revision. For example, Taldinskaya Mining Company’s desktop assessment is dated October 2016, its letter August 2017 and its site visit November 2018. KRU’s report records a November 2017 letter, although the first visits took place in 2015. DOC-043, p. 5; DOC-045, p. 5.

Later producer profiles sometimes give different engagement start dates. KRU’s timeline begins in April 2015 and SUEK’s in August 2017, while the public reports date their letters to November and September 2017 respectively. An answer requires the letters themselves and an explanation of the event each profile denotes. Site-visit and plan-agreement dates in the table are taken from the assessment descriptions; the differing early registration dates are retained among the requests. DOC-010; DOC-050.

5.3. What happened after the site visit

Assessors reviewed documents, visited selected sites and spoke with stakeholders. Findings formed the basis of a Continuous Improvement Plan, or CIP. The producer was to report implementation of items, and the assessor to verify the evidence submitted. The full report and monitoring materials were available through the members’ information-sharing system. The public report provided a condensed description. This distinction is stated on the first page of the SDS report. DOC-020, p. 1, 5, 7.

In its 2019 report, Uniper stated that Russian producers were reporting on implementation of their improvement plans at least twice a year. What reports arrived between visits, what did they contain, and what decisions followed? A public summary of closed-item counts shows the resulting status, but reconstructing action at a specific mine requires the communications themselves, supporting material and the assessor’s decisions. DOC-003, PDF p. 63 / printed p. 61.

The current January 2024 guidance describes the questionnaire, assessor selection, site visit, report, plan and follow-up monitoring. The October 2025 rules allocate the weighting of an assessor’s proposal between the technical component — 70% — and the financial component — 30%. A producer may object to an assessor for a substantiated reason, such as a conflict of interest. These documents describe the current procedure; the corresponding historical guidance is needed for the Russian visits. DOC-061, p. 11, 19–21, 30; DOC-064, p. 7–9.

5.4. Compliance ratings and urgency — different scales

The SDS report’s key contains four levels: Meets — full compliance with convincing evidence of implementation; Substantially Meets — largely compliant, but with some gaps; Partially Meets — work has begun, but implementation is incomplete; Misses — work has not begun or there is a systemic failure. For the SDS group, section 2.2, ‘Reporting violations / grievances’, was rated Misses, while section 6.9, ‘Health and safety’, was rated Partially Meets. DOC-020, p. 6, 10.

The same page states that there were no findings in the Immediate Resolutions category, requiring immediate action. This characterises the urgency of a particular category. An adverse compliance rating for a section nevertheless appears in the table. Both results must be read together. Allocating findings to mines requires the full report identifying sites and the action plan. The complete table page and its key are included in the appendices.

5.5. Complaints, their handling and consequences

The procedure dated 19 June 2025 provides for complaints about the organisation, its representatives, producers and assessors. Events more than five years old are among the grounds for refusing admissibility. On the research date, 28 October 2026, events in November 2021 still fall within that period. Questions concerning ongoing consequences and earlier events must be put to the organisation with precise dates. DOC-063, p. 2–4.

The procedure permits submissions in a local language, although English is preferred. Confidentiality may be requested; the circumstances can sometimes identify a complainant. The stated acknowledgement period is ten working days, followed by an admissibility decision. The indicative period for proposing a resolution is 60 calendar days. An appeal must be lodged within twenty working days. Review takes place within the programme’s structure, involving the technical committee and Board. This describes the current mechanism; it is not evidence that a particular submission by Natalia has been considered. DOC-063, p. 3–6.

A documented example of participation ending is the announcement concerning JSC Shubarkol Komir dated 24 June 2019: following the November 2017 assessment, the parties decided to disengage because the plan could not be implemented under the strategic and economic circumstances then prevailing. The 2025 report again describes a site visit to Shubarkol in the fourth quarter, and an assessment of Black Royalty Minerals. The report states that completion of both processes was planned for 2026. This history shows why disengagement and subsequent return must be recorded as separate events. DOC-059; DOC-083, p. 17.

Chapter findings. The system provides for more than a single site visit: it includes subsequent reporting, verification of implementation and status changes. For Russian operations, this intervening documentary record is precisely what is needed to answer the research’s central question. In the requirements table, each incident is paired with a specific request concerning verification and results.

5.6. Status, logo and consequences of non-performance

The claims and logo guidance dated 23 January 2023 prohibits producers and buyers from describing participation as certification, accreditation or endorsement. The right to use the status is tied to a completed site assessment and an agreed plan, with no open Immediate Resolutions issues. Where claims are misleading, the secretariat requires correction and may restrict logo use. DOC-054, pp. 3, 5, 8–11.

The policy dated 23 April 2025 provides for disengagement in cases of missed commitments and deadlines, failure to report against the plan, false information or an insufficient response to enquiries after a risk event. The secretariat may agree deadline extensions where circumstances are explained; reminders and an appeal procedure are specified. DOC-062, pp. 3–6. To examine decisions in the Russian period, the edition then in force and decisions for each producer are requested.

6. Russian producers: sites, assessments and violations

6.1. KRU: open-pit mine visits and the 2019 inspection

Bettercoal’s public report covers six Kuzbassrazrezugol open-pit mines: Kedrovsky, Mokhovsky, Bachatsky, Krasnobrodsky, Taldinsky and Kaltansky. The list of actual visits names Krasnobrodsky in November 2015, and Bachatsky and Taldinsky in May 2017. James McNally and Yelena Borovikova of SLR Consulting conducted the assessment. The overall scope and the visit itinerary are distinguished here. DOC-043, p. 5.

The report’s findings noted weaknesses in stakeholder engagement: the list of organisations and people lacked contact details and engagement analysis. At the same time, assessors described water- and energy-management practices and environmental measures. There were no findings in the Immediate Resolutions category. These results concern the KRU assessment within its stated scope. DOC-043, p. 8–9.

On 14 May 2019, Rostekhnadzor’s press-service statement was published concerning an inspection of 70 hazardous industrial facilities at six KRU branches and the separate Salair Mining Production structural unit. More than 200 violations were identified. At Bachatsky, operation of a loading and unloading facility — transfer point No. 2 of open-pit mine No. 5 — was suspended for one month. At Krasnobrodsky, mining and drilling along the roof of the Moshchny seam of open-pit mine No. 7 were suspended for three months. The statement reports liability of the company and 142 officials. This was an inspection of several sites, while the suspensions concerned specific work. DOC-034.

Bachatsky and Krasnobrodsky therefore appear both in Bettercoal’s visit list and in the subsequent regulatory statement. The period between these dates was a period of plan implementation. What inspection information did assessors receive, which items did they change, and what evidence of remediation did they require? Answering requires the monitoring log, KRU’s communications after the inspection and the assessor’s corresponding decisions.

6.2. Vakhrushevsky field and a separate penalty overturned

Case А27-110/2019 concerns JSC Coal Company Kuzbassrazrezugol, taxpayer number (INN) 4205049090, state registration number (OGRN) 1034205040935. It examined requirements relating to coal-beneficiation waste from OUKNS-4 at the Krasnobrodsky branch’s Vakhrushevsky field and payments for 2013–2015. The company linked use of the material to land rehabilitation. The court considered the legal status of the waste’s actual placement and the payer’s duties. The first-instance decision of 16 May 2019 and the appeal of 31 July survived cassation; the cassation ruling was issued on 20 November 2019. DOC-035.

This dispute concerns waste management. It cannot be added to industrial violations from another inspection as a single numerical measure. For Bettercoal, the substantive question is how assessors checked the purpose of the material being placed, permits and subsequent court findings.

In a different case, No. 12-71/2019, Belovo District Court on 27 June 2019 overturned a 10,000-rouble fine concerning rules for operating gas-cleaning installations at the Bachatsky branch. The court terminated proceedings because the circumstances underlying the penalty had not been proved. The research records this incident as an overturned decision, rather than an established fine that remained in force. DOC-036, concluding part of the decision.

6.3. SUEK: mines visited and a preparatory working

In May 2018, assessors visited the Taldinskaya-Zapadnaya-1 and Taldinskaya-Zapadnaya-2 mines, the mines named after V. D. Yalevsky and A. D. Ruban, and the Zarechny open-pit mine. The team named comprises Paul Mitchell, Julija Menise and Tatiana Vasenko. The plan was agreed in March 2019. The report describes meetings with trade unions, city representatives and workers’ associations, as well as findings concerning closure planning, engagement with business partners and biodiversity conservation. DOC-044, p. 5–6, 9.

An inspection on 13 February 2020 at JSC SUEK-Kuzbass’ Ruban mine identified deposits of explosive coal dust, deficiencies in support systems and breaches of equipment explosion-protection requirements. Rostekhnadzor prohibited development of assembly roadway No. 816 — a preparatory mine working — and cargo transport along haulage roadway No. 818. The materials were referred to court. The statement was published on 25 February by the Union of Industrial and Environmental Safety Specialists, citing the regulator. DOC-037.

In the separate sanitary case No. 12-328/2019, Kemerovo Regional Court on 17 June 2019 upheld a 10,000-rouble fine against JSC SUEK-Kuzbass. The court found an exceedance of the average daily maximum permissible concentration of nitrogen dioxide in a residential area by a factor of 2.7, and of the permissible maximum night-time noise level in a bedroom by 1.3 dBA. It considered arguments about sampling points and sources of impact. One measurement beside the haul road was not used, while measurements in the residential area were found admissible. DOC-038.

In the first incident, the site matches the mine visited. In the second, the document establishes the same legal entity’s liability and an impact on a residential environment; a connection to the Ruban mine cannot be inferred from the paragraphs’ proximity. The request to Bettercoal must separately address industrial safety in the named working and consideration of the sanitary decision in the company’s plan.

6.4. SDS-Ugol: a positive public description and the ratings table

The group report lists actual visits to the head office, the Salek and Vostochny sites in Kiselyovsk, Chernigovets and Listvyazhnaya. The wider scope list also includes other group operations. The visit took place in November 2017; the plan was agreed in May 2018. Interviewees included regulators, trade unions, civil-society organisations and residents of several settlements. Establishing who selected interviewees and how their safety was ensured requires the interview programme and confidentiality rules for that visit. DOC-020, p. 4–5.

The March 2018 corporate announcement describes the result positively. Bettercoal’s public table, published in January 2019, also contains Misses for reporting violations and grievances, and Partially Meets for health and safety. These are group ratings. They must be compared with the corporate account as two parts of the published picture, preserving both the good practices noted by assessors and the outstanding work. DOC-048; DOC-020, p. 6–8.

At JSC Chernigovets’ Yuzhnaya mine, Kemerovo District Court on 12 February 2018 suspended development of a transport working in the Vladimirovsky-II seam for ten days. Circumstances listed in the ruling include insufficient stone-dusting, support-system breaches and inadequate dust protection. The suspension period is linked to the prohibition of 8 February. Yuzhnaya is within the group report’s overall scope, but is not named among mines actually visited. DOC-039; DOC-020, p. 4–5.

What specific problems lay behind the ratings for sections 2.2 and 6.9? When were they resolved, who verified this, and what documents confirm implementation? I request the full report and improvement plan identifying which findings relate to each mine.

6.5. Taldinskaya Mining Company

The report covers and lists as visited the Taldinskaya-Yuzhnaya and Kyrgayskaya mines. The November 2018 visit was conducted by The Dragonfly Initiative: Julija Menise, Tatiana Vasenko, Vladimir Simov and Peter Whitbread-Abrutat. The plan was agreed in September 2019. Strengths included anti-corruption measures and record-keeping; findings concerned personal protective equipment, sanitary conditions, handling oils and chemicals, and public reporting. DOC-045, p. 5, 8.

On 2 November 2020, Prokopyevsk District Court heard case No. 5-142/2020 concerning JSC Shakhtoupravleniye Taldinskoye-Yuzhnoye. Following the 27 October inspection, development of a conveyor roadway was suspended for seven days. The decision names hazardous dust, deficiencies in water sprays and supports, and fire-prevention measures. The company’s representative reported that the violations had been remedied; the court ordered suspension. A document confirming subsequent verification of implementation should be requested separately. DOC-040.

6.6. KTK and TalTEK: early stage of the programme

Bettercoal profiles record KTK’s participation as beginning in January 2020 and TalTEK’s in February 2021. The profiles examined place them at an early stage, before a completed site assessment. Their violations are considered as information relevant to selection and initial assessment. DOC-046; DOC-047.

The inspection of PJSC Kuzbasskaya Toplivnaya Company’s Karakansky-Yuzhny site ran from 28 January to 17 February 2021. The regulatory statement names 44 violations, including a danger zone that had not been properly documented and marked, and departures from project designs. A temporary prohibition was imposed from 10 February; the court suspended work in the danger zone for 60 days. The 24 February publication gives total fines of 439,000 roubles. DOC-041.

According to Rostekhnadzor’s press-service statement, reproduced by PravoTEK on 12 January 2022, an inspection of LLC Razrez TalTEK on 23–28 December 2021 identified breaches of bench and safety-berm parameters. On 30 December, Novokuznetsk District Court suspended mining in the danger zone for 90 days. The full court decision is needed for the documentary appendix; the register preserves the source of the regulator’s statement. DOC-042.

6.7. What the four plans show as at July 2022

KRU has 58 published items: 20 verified, 23 reported completed and awaiting verification, and 15 open. SUEK has 40: 17, 8 and 15 respectively. SDS has 49: 16, 11 and 22. Taldinskaya Mining Company has 63: 12, 12 and 39. The four profiles total 210 items: 65 verified, 54 awaiting verification and 91 open. The underlying values table and chart appear below. DOC-010; DOC-050; DOC-011; DOC-051.

The counting unit is a plan item, rather than a legal violation. Items differ in nature and severity between groups. ‘Awaiting verification’ is distinguished from verified implementation. Following suspension of engagement in April 2022, the profile date ‘July’ describes the published summary; the actual verification dates of individual items require monitoring logs.

Chapter findings. The comparisons establish specific matches of sites and legal entities, but distinct events over time. Assessors visited the named KRU open-pit mines, Ruban mine, Listvyazhnaya and Taldinskaya-Yuzhnaya. Yuzhnaya is within the group scope. KTK and TalTEK were at an early stage. This approach allows questions about oversight to be addressed to the precise procedure that existed at the time of an event.

7. Listvyazhnaya: from assessment to court findings

The mine’s legal entity is LLC Shakhta Listvyazhnaya. The Prosecutor General’s Office announcement of 25 March 2025 identifies it as a subsidiary of the SDS-Ugol holding company. Bettercoal’s public report shows a visit to this mine in November 2017 and agreement of a group plan in May 2018. The relationship therefore runs through a specific site, rather than merely through the holding company’s name. DOC-021; DOC-020, p. 4–5.

7.1. Sequence of events

Bettercoal’s report scheduled the next assessment for November 2022. Plan monitoring was envisaged between visits. The 2021 annual report states that the pandemic prevented site assessments that year; engagement and review of materials continued remotely. These details describe how the organisation worked. The mine requires its own record of checks, communications and decisions. DOC-020, p. 5, 7; DOC-056, p. 3–4.

An explosion occurred on 25 November 2021. The Emergencies Ministry recorded 51 deaths, including five mine rescuers. DOC-089, PDF 34. The following day, Bettercoal reported contact with SDS, expressed condolences and stated its intention to establish the causes and necessary preventive measures. In December, the organisation held a webinar with leading independent assessors on Russian producers’ plan statuses, to help buyers understand specific risks and improvement work. DOC-021; DOC-024; DOC-056, p. 20.

On 28 April 2022, Bettercoal announced the suspension of its Russian programme against the backdrop of Russia’s invasion of Ukraine and associated risks. Programme-organised plan verification and the ability to use the status on the previous basis ended. The website publication is dated 3 May and contains the 28 April statement. These dates are distinguished in the chronology. DOC-079.

7.2. Judgment against the executives

According to the Prosecutor General’s Office, Kemerovo’s Central District Court found deliberate inaction by executives in July–November 2021: they failed to take the measures needed to bring the mine into compliance with industrial safety requirements. Mikhail Fedyaev is identified as the group’s Board Chair and a shareholder, Gennady Alekseev as Chief Executive Officer and a Board member, and Anton Yakutov as Technical Director. Alekseev received five years and three months’ imprisonment, Yakutov five years, and Fedyaev a suspended sentence of three years and six months. DOC-021.

On 21 April 2025, Interfax, citing the courts’ press centre, reported that the judgment became final on 17 April and that no appeals had been lodged. Later civil decisions also refer to the final judgment against the executives. Kommersant’s article records the defence’s position, disputing causation and the extent of managerial duties. The register distinguishes the official announcement, court document and journalistic account of the proceedings. DOC-022; DOC-023; DOC-084; DOC-085.

7.3. What the 2026 civil cases add

Kemerovo Regional Court decisions dated 26 March and 2 April 2026 address compensation claims arising from deaths. The court recounts material from the technical investigation and criminal cases. In particular, it mentions a final judgment concerning breaches of the rules for operating the Mikon III atmospheric and gas monitoring system. This is a separate documentary route to the issue of gas monitoring, alongside the general judgment against the executives. DOC-085, case No. 33-2951/2026; DOC-084, case No. 33-2762/2026.

Dates are taken from the decisions’ text: the aggregator’s headings show 25 March and 1 April respectively. The appendices do not reproduce families’ personal circumstances, individual claim amounts or medical information. Verifying the causes of the accident requires the full technical investigation report and court decisions concerning the monitoring system. The civil decision preserves their account within the scope of the case considered.

7.4. What documentary record is needed between 2018 and 2021

Required: the mine-specific section of the improvement plan; all implementation reports with dates; assessors’ observations on the information submitted; information about official inspections received by Bettercoal; decisions on deadline changes and extraordinary checks; December webinar materials; and results of the review promised after the accident. For each document, its recipient and receipt date matter. Publication of a court finding in 2025 concerns events in 2021, but does not replace evidence of what information assessors held earlier.

Chapter findings. The documents connect one mine with the 2017 visit, the 2018 plan, the accident and the court-established failure of executives to act in 2021. Bettercoal’s public response and the December webinar are known. A substantive organisational answer must disclose checks and decisions between these points, and the results of the subsequent review.

8. Uniper: visit, purchases and decisions by governing bodies

8.1. Why a buyer needs assessments

In its 2019 report, Uniper explicitly explains its use of Bettercoal information: assessments form part of environmental, social and governance risk assessment and supply-chain monitoring. Printed page 52 / PDF page 54 contains both this statement and purchasing data. Printed page 61 / PDF page 63 refers to Russian producers’ reporting on plans at least twice a year. This is a documented connection between the procedure and the buyer’s work. DOC-003.

8.2. What the company saw in Kiselyovsk

Uniper’s article ‘The dilemma of investing in social and environmental remediation activities’ describes a visit to Kiselyovsk in September 2019 as part of a Bettercoal mission. The company describes the proximity of mining to housing and the short time spent in the town. A longer conversation in Chuvashka was a separate part of the itinerary. The archived copy preserves discussion of resettlement, rehabilitation of disturbed land and the difficulties of choosing measures. DOC-001, May 2020 publication; archived snapshot dated 18 June 2020.

Uniper also wrote that the most severe impacts involved operations with which neither it nor Bettercoal engaged directly. This position should be read alongside its own description of the town. Which sites were meant, which suppliers were checked after the visit, and what changes were required? Answering requires the itinerary, site list, final memorandum and subsequent decisions.

The cadastral report dated 3 July 2019 provides a separate measurement. On 26 April, the engineer inspected a residential house and the nearest waste-rock dump; the distance from the nearest foot of the dump to the footprint of the house inspected was 461.98 metres. This measures a specific inspected house. The complete page, with personal data redacted, is appended to the research. DOC-080.

8.3. TDI and information about intimidation

TDI Sustainability’s study was prepared for Bettercoal’s Russia Working Group, established in December 2018. The document lists ENEL, ENGIE, ESB, Fortum, RWE, Uniper and Vattenfall. The work included a review of Russian- and English-language material and a visit in September 2019. The authors described their task as gathering and explaining the context of reports by civil-society organisations and researchers. DOC-002, p. 2–3.

Page 4 states: Finally, according to the rights group, FERN, intimidation of local environmental campaigners by coal companies is reportedly prevalent in Kuzbass. The information is attributed to FERN; TDI relays it. The sentence concerns a regional problem. The recommendations include grievance mechanisms and the ability to express concerns safely. DOC-002, p. 4, 6–7.

The question for those commissioning the work is how this information was translated into action: who was responsible for interviewees’ safety, how complaints were checked, and what measures could be taken. The report’s publication date — February 2020 — is distinguished from the 2019 visit and the threats against Natalia reported later.

8.4. Three purchasing figures

Shares of Uniper’s direct contractual purchases were 35.1% for 2019, 29.9% for 2020 and 22.6% for 2021. The first two categories include Latvia; the third is labelled Russia. The chart uses separate bars with full category labels. The percentages describe purchases under direct contracts, rather than company profits. DOC-003, p. 54; DOC-004, p. 74; DOC-005, p. 46, 93.

The 2022 annual report states that Russian purchases ended in August. This means that purchases continued after the visit and into part of 2022. Assessing a specific consignment requires a contract, legal entities and origin information. Country-level reporting does not allocate purchases among mines. DOC-006, PDF p. 41 / printed p. 37.

8.5. What the 94.48% result means

On 19 May 2021, under agenda item 4 at Uniper’s meeting, shareholders approved the Supervisory Board’s actions in 2020. Votes in favour totalled 305,116,131 out of 322,950,342 valid votes — 94.48%; votes against totalled 17,834,211. The percentage’s denominator is valid votes on this item. The document states the subject of the vote alongside the result. DOC-081, p. 1.

The critical shareholders’ counterproposal opposed approval, including for reasons relating to coal-chain responsibility and human rights. It shows the substance of the public criticism, while the official record shows the subject and outcome of the meeting’s decision. Both documents, read separately, matter when relating this to purchases. DOC-019, p. 2–3.

8.6. Suppliers: what can be shown in a diagram

Question 39 from Fortum shareholders in 2022 concerns Listvyazhnaya. The answer states that Fortum and Uniper had not bought coal from this supplier in recent years; years and a legal entity are not separately specified. Volza lists the SDS group among suppliers to Uniper Global Commodities SE, but the public profile does not disclose comparable dates or mines of origin. These records are therefore placed in the table of commercial relationships to be checked. DOC-052, p. 16; DOC-077.

I ask Uniper to disclose its purchasing history with SDS-Ugol: years, sellers’ legal entities, volumes and mines of origin. The same details are needed for KRU and other names in the trade directory. Material concerning other global suppliers must undergo the same checks before being added to the diagram.

Chapter findings. Uniper’s own documents connect the visit, public observations, use of assessments and continued purchases by country. The vote concerns approval of the Supervisory Board’s actions. The next level of verification is supplier-specific decisions and the origins of consignments.

9. People, responsibilities and documented relationships

In this chapter, a line between two names always represents a defined relationship: employment, Board membership, conducting an assessment or ownership of a production site. The period is stated beside the source. Commercial information still requiring consignment-specific documents is placed in a separate requests table.

9.1. Frank Plümacher

The imprint of Uniper’s 2017 report identifies Plümacher as Executive Vice President HSSE & Sustainability. The report was published in May 2018. HSSE encompasses health, occupational safety, security and environmental protection; Sustainability refers to sustainable development. The document confirms this professional role before the Kiselyovsk visit. The precise start date must be established from the appointment, rather than the reporting year. DOC-078, final PDF page, p. 17.

Uniper’s 2019 report dates his election as Bettercoal Board Chair to April and describes a three-year appointment. Registry form AP01 records his appointment as a director on 18 June 2019. Election as Chair and appointment as a director are different events. I request clarification of the sequence of these decisions and the date on which he began exercising the Chair’s responsibilities. DOC-003, p. 54; DOC-076, p. 1.

Plümacher’s governance involvement is reflected in signed accounts. The 2019 balance sheet was approved on behalf of the Board on 30 June 2020, and the 2020 balance sheet on 20 May 2021. The pages bear the name F. Pluemacher. The signature confirms approval of the accounts; specific decisions about Russian mines must be sought in Board minutes and supporting materials. DOC-072, p. 4; DOC-073, p. 4.

In the foreword to Bettercoal’s 2021 annual report, he speaks as Chair. A short statement defines his public position: Site assessments are central to the work of Bettercoal . The same foreword states that the pandemic prevented teams from returning to sites in 2021. The Board updated the Code and rules, while the organisation continued remote work on plans. This provides a specific question for the Chair: how was the adequacy of that monitoring assessed, and when was the need for an extraordinary site visit discussed? DOC-056, p. 3–4, 12.

Another document reveals Uniper’s practical involvement in the secretariat’s work. The Dutch Coal Covenant report for September 2017–October 2018 describes seconding a Uniper employee for two years to support improvement-plan monitoring. It also states that Uniper’s Supervisory Board regularly received information on responsible coal sourcing. The document publishes Plümacher’s comment on a visit to Colombia. This was a separate visit; its information is not transferred to the Russian delegation. DOC-088, p. 24.

Form TM01 records the end of his directorship on 27 November 2025. On 3 December, RECOSI announced Gerda Frans as the new Chair and thanked Plümacher for six years of leadership. At the research date, Uniper presents him as Head of HSSE & Sustainability and Human Rights Officer. In his published statement, he links this work to early identification, assessment and mitigation of human rights and environmental risks in the company’s value chains. DOC-068; DOC-013; DOC-015.

Why he is an addressee. Plümacher connects historical leadership of Bettercoal during the visit and disaster with Uniper’s current human rights function. The documents provide grounds to ask him about Board work, materials received, risk assessment and arrangements for considering a submission today.

  1. What Russian-plan reports reached the Board in 2019–2021, and which matters were discussed with your involvement? Please provide the minutes and appendices for those items.
  2. How did the Board assess remote monitoring in 2021? What information could trigger an extraordinary visit, and was such a need considered for SDS?
  3. What decisions were taken after the disaster and the December webinar? Where are the results of the promised review?
  4. Since what date have you been Human Rights Officer? Who will consider Natalia’s submission, within what time frame and with what written outcome?

9.2. Nadja Wendler

The EGYPES 2024 conference report identifies Wendler as Vice President, Sustainability at Wintershall Dea AG. PDF page 15 contains her statement: Governments, industry leaders, innovators, and communities must unite in a shared mission for a sustainable future, leaving no one behind. DOC-058, PDF p. 15 / printed pp. 26–27.

By 3 December 2025, RECOSI described Wendler as Uniper’s Senior Vice President Sustainability and a new Board member. The registry form gives her appointment as a director as 27 November. Her start at Uniper is a separate date; establishing it precisely requires the appointment document. Her 2025 role is not projected back onto Russian events in 2017–2022. DOC-067, p. 1; DOC-013.

In the current structure, the Board is responsible for strategic governance, while the secretariat handles day-to-day work. Wendler represents Uniper on the Board and heads the company’s sustainability function. This offers two routes for a submission: consideration of historical risks within Uniper, and discussion of document disclosure and procedures at RECOSI. DOC-014.

Why she is an addressee. The questions for Wendler concern present-day work on the consequences of past purchases and residents’ participation in considering a submission. Her published call to take communities into account is compared with the specific request to hear Natalia and provide a documented answer.

  1. When did you take charge of sustainability at Uniper, and what responsibilities did you receive for historical supply-chain risks and residents’ submissions?
  2. Are you prepared to raise disclosure of Russian plans and monitoring with RECOSI’s Board, assign a responsible person and give a deadline?
  3. How will residents who remained with the consequences of mining after purchases ended participate in the process?
  4. What safe methods of submitting testimony and receiving feedback are available to Natalia today?

9.3. Other participants in governance and assessments

Joachim Löchte is named as Chair in the initiative’s 2012 founding announcement. Gerda Frans, Head of ESG at ENGIE Global Energy Management & Sales, was announced as RECOSI Chair in December 2025. Taco Douma of RWE Generation remained Vice-Chair. Katie Warrick heads the organisation’s executive work. These roles differ: the Board governs and oversees, while executive management runs activities. DOC-066; DOC-013; DOC-014.

Russian assessment-team membership is taken from the reports themselves: James McNally and Yelena Borovikova — KRU; Paul Mitchell, Julija Menise and Tatiana Vasenko — SUEK and SDS; Julija Menise, Tatiana Vasenko, Vladimir Simov and Peter Whitbread-Abrutat — Taldinskaya Mining Company. Assessment participation means carrying out the stated work. Establishing who later verified a particular plan item requires a task-allocation log. DOC-043, p. 5; DOC-044, p. 6; DOC-020, p. 5; DOC-045, p. 5.

Uniper’s published account of Kiselyovsk confirms the participation of company representatives. The delegation’s individual members, allocation of roles and list of recipients of the final report remain the subject of a specific request. The visit diagram does not substitute named executives for unidentified participants.

9.4. How to read the diagrams

Diagram A shows professional appointments and governing bodies by date. Diagram B shows the buyer’s confirmed use of assessments and purchases by geographical category; potential seller–buyer pairs are listed separately for verification. Diagram C connects producers with sites visited. Diagram D places changes in time. Arrows represent their labelled relationship or a procedural sequence; the disaster’s causal links are determined by court and technical documents, rather than arrow direction.

Chapter findings. Governance and professional relationships, assessment-team membership, sites visited and Uniper’s use of the system are confirmed. A commercial connection to a particular Russian mine requires supply documents. An executive’s personal involvement in a decision requires minutes, a signature, an instruction or a dated communication.

10. Natalia Zubkova: work, pressure and consequences

Pencil portrait of Natalia Zubkova
Natalia Zubkova

Natalia is the author of the appeal and a direct participant in this part of the story. Her words of 28 October 2026 are reproduced in the appendix in full, following the agreed article version. Below, events are compared with publications from the relevant time. Personal testimony describes lived experience; external publications show when information became public and who sought its verification.

10.1. Residents’ appeal and material available to read

Kiselyovsk residents’ appeal to the Prime Minister of Canada was published by Novosti Kiselyovska on 8 June 2019. Ecodefense’s 2020 report cites this video in notes 17 and 75. In the preserved Russian version, these are PDF pages 5 and 15. This traces the subsequent report’s use of material from Natalia’s outlet. Establishing precisely what the delegation received before September 2019 requires correspondence about the transfer of material. DOC-008, p. 5, 15.

On 26 August 2019, Sibir.Realii reported that the mayor had contacted prosecutors over the journalist’s interviews with residents. The article concerns pressure surrounding information gathering and journalistic work. A letter to prosecutors must be distinguished from the opening of proceedings and a court decision. DOC-025.

10.2. Threats and a publication featuring fire

In its publication of 3 March 2021, CPJ — the Committee to Protect Journalists — relays Natalia’s account of anonymous threats to burn her alive in August 2020 and her submission to the Investigative Committee. On 21 August 2020, the Bez Tsenzury blog published ‘An “attempt on Zubkova’s life” is being prepared’. The page contains a montage featuring fire, and the text ridicules reports of threats. The account name and platform are established from the page; identifying the person behind the account requires a separate document. DOC-026; DOC-032.

The blog publication and the original threatening message are two different documents. The image included in the appendix shows the nature of the public harassment. Information on the correspondence and its dates relies on specific preserved excerpts and Natalia’s publication ‘Two Realities’. This work does not claim to have verified the entire set of 27 screenshots. DOC-033.

10.3. Attack, departure and closure of the outlet

CPJ reported that an unidentified person attacked Natalia while she was walking her dog on 25 February 2021 and threatened her and her children. The organisation spoke to Natalia by telephone. This publication is a dated record of her account and of a professional organisation’s appeal for the journalist’s protection. It also describes its own requests for comment. Those requests were made by CPJ, not by the author of this research. DOC-026.

On 10 March 2021, Reporters Without Borders called on the federal authorities to protect Natalia and conduct an independent investigation. The article mentions her 6 March video appeal concerning complaints to the police, FSB and Investigative Committee. The organisation offered its own assessment of persecution by local authorities. CPJ’s and RSF’s accounts of the same attack are not treated as two independent eyewitness testimonies. DOC-027.

On 26 April 2021, Sibir.Realii reported that Natalia had left Russia roughly a week earlier. The outlet included both her explanation of her fear for her safety and the Investigative Committee’s position that it had visited her as a victim in a case concerning obstruction of journalistic work. On 23 May, Novosti Kiselyovska’s closure was reported, for the editor’s family’s safety and to enable other projects. DOC-028; DOC-029.

10.4. What is compared with Bettercoal’s work

The timeline first places public appeals and the 2019 visit, followed by the February 2020 TDI report, August 2020 threats, and reports of an attack and departure in 2021. This sequence determines the questions about knowledge. What material was received before the visit? Who tracked subsequent publications? Were retaliation risks considered during conversations with residents and grievance handling? Each answer requires a document with a receipt date and a specific action.

The Black Snow press kit is used as a description of the film and the director’s project. This work does not claim to have viewed the entire film or checked scenes against timestamps. DOC-030.

Chapter findings. The story includes specific dated reports of pressure, threats, an attack, forced departure and closure of an outlet. External publications record Natalia’s account and organisations’ responses. Establishing perpetrators and instructions requires investigation materials. Assessing buyers’ and Bettercoal’s responses requires documents showing receipt of information and subsequent measures.

11. Discussion and conclusions

11.1. What the comparisons reveal

The research establishes several different relationships. The legal register links Bettercoal and RECOSI through one registration number. Annual reports and appointment forms connect executives with governing bodies. Public assessment reports identify Russian operations and mines actually visited. Court decisions and regulatory statements record specific circumstances at those operations. Uniper’s reporting shows use of assessments and purchases by country. Each link has its own source.

The principal analytical result is the ability to examine not only the site-visit itinerary but also the work between visits. Bettercoal provided for plans and implementation monitoring; Uniper reported regular updates. Requesting half-yearly reports, assessors’ decisions and Board materials therefore tests the stated procedure against specific examples. For Listvyazhnaya, this record is particularly important between May 2018 and November 2021.

11.2. What results the organisation presents

The July 2022 summaries give 65 verified items out of 210 in four Russian plans. They allow the published status to be checked, but do not openly allocate every item to a mine or provide evidence of its implementation. As at 31 December 2025, RECOSI’s report lists 279 items: 66 closed, 30 awaiting verification and 183 open. They concern six producers. The report was published on 17 August 2026 (DOC-087). DOC-083, p. 18.

The 2022 and 2025 figures are not combined into a single ‘progress’ series: they concern different producers and periods. Similarly, RECOSI’s 2025 expenditure includes the gas programme and expanded organisational activities; it cannot be presented directly as growth in spending solely on Russian coal assessment. The financial table retains the category names.

11.3. Governance, transparency and residents’ participation

Buyers participate in the organisation’s governance and funding, receive assessment results and use them for their own supply checks. Producers implement plans and pay for assessments under current rules. Public summaries give residents part of the results. To verify a change in conditions beside a particular house or the safety of a particular mine working, a resident needs a more detailed operation-specific report and action plan. This is a practical question of information access.

Natalia’s story poses a second question: how to obtain this information and report a problem safely. The Code includes grievance handling, the TDI report relays information about intimidation, and CPJ and RSF publish reports about a particular journalist. Completing the comparison requires records of incoming reports, procedures for protecting interviewees and decisions concerning them.

11.4. Final answers

Who governed and paid? Corporate members established and funded the organisation; leadership and membership changes are confirmed by the register and reports. A payer-by-payer breakdown of contributions requires disclosure.

What was assessed? Public reports provide overall scope and visit lists. They show findings and a number of good practices. The site table preserves the distinction between the entire group and a mine visited.

How were subsequent violations taken into account? Official inspections and court decisions, periodic plan reporting and certain Bettercoal public responses are known. Reconstructing specific action on each violation requires monitoring logs and dated decisions.

What changed in purchasing? Direct contractual purchases of Russian coal continued after the visit; Uniper reported that they ended in August 2022. The origins of individual consignments require contracts and shipping documents.

What happened to the journalist? Her testimony, publications about threats, the attack and departure, and professional organisations’ appeals have been preserved. The question for companies is when they received this information, who considered it, and how they ensured the safety of residents’ reports.

Table 1. Events, inspections, decisions and publications

The date on which an organisation received information requires separate evidence; publication does not replace an incoming document.

Event: datePublishedParticipantWhat happenedDocumentSignificance
28.02.2012Registry entryBettercoal LtdIncorporation, No. 07968009DOC-055Legal starting point
18.04.201218.04.2012Seven companies; BettercoalAnnouncement establishing the initiativeDOC-066Founders and stated aims
November 2015; May 2017Public assessment reportKRU; SLRVisits to three open-pit minesDOC-043, p. 5Before Code 1.1 approval
28.06.2017Code 1.1BettercoalVersion 1.1 approvedDOC-053Approval date; applies from publication
November 201709.01.2019SDS; BettercoalSite visit, including Listvyazhnaya and VostochnyDOC-020, p. 4–5Visit to specific sites
12.02.2018Ruling textKemerovo District Court; YuzhnayaDevelopment suspended for 10 daysDOC-039Incident within the group’s overall scope
May 201809.01.2019SDS; BettercoalImprovement plan agreedDOC-020, p. 5Start of the plan-monitoring period
May 2018Public assessment reportSUEK; assessorsVisit to five sitesDOC-044, p. 5–6Itinerary including Ruban mine
November 2018Public assessment reportTaldinskaya Mining CompanyVisit to two minesDOC-045, p. 5Assessment itinerary
April / 18.06.20192019 report / AP01Frank PlümacherElection as Chair / appointment as directorDOC-003, p. 54; DOC-076Different roles and registration events
26.04.201903.07.2019Cadastral engineerInspection of a house and waste-rock dump; 461.98 mDOC-080A specific house, not the author’s flat
2019 inspection14.05.2019Rostekhnadzor; KRUMore than 200 violations; specific work suspendedDOC-034After the 2015–2017 visits
08.06.201908.06.2019; cited in 2020Residents; Novosti KiselyovskaAppeal to the Prime Minister of CanadaDOC-008, p. 5, 15Residents’ public material
17.06.2019Decision textKemerovo Regional Court; SUEKFine for air pollution and noise upheldDOC-038Separate legal entity and measurements
27.06.2019Decision textBelovo District Court; KRUGas-cleaning fine overturnedDOC-036Overturning retained in the findings
September 2019May 2020Uniper representatives; BettercoalVisit to KiselyovskDOC-001Subsequent public account of the visit
13.02.202025.02.2020Rostekhnadzor; Ruban mineDevelopment and cargo transport prohibitedDOC-037Specific preparatory work
September 2019 and source reviewFebruary 2020TDI; working groupReport on social and environmental problemsDOC-002Reports of intimidation included
August 202021.08.2020; 03.03.2021Natalia; blog; CPJThreats in testimony; publication featuring fireDOC-032; DOC-026Threat distinguished from publication
02.11.2020Ruling textProkopyevsk District CourtDevelopment suspended at Taldinskaya-YuzhnayaDOC-040Seven days
28.01–17.02.202124.02.2021Rostekhnadzor; KTK44 violations, danger-zone work suspendedDOC-041Early stage of the programme
25.02.202103.03 and 10.03.2021Natalia; CPJ; RSFReports of an attack and threatsDOC-026; DOC-027Dated external publications
Roughly one week before 26.04.202126.04.2021NataliaReported leaving RussiaDOC-028Date interval retained
19.05.2021Official meeting resultUniper shareholders94.48% in favour of approving the Supervisory Board’s actionsDOC-081, p. 1Subject: actions in 2020
July–November 202125.03.2025SDS executives; courtPeriod of inaction established by the courtDOC-021Circumstance date distinguished from publication
25.11.2021State report for 2021ListvyazhnayaDisaster, 51 deathsDOC-089, PDF 34Event and subsequent judicial assessment
26.11.202126.11.2021BettercoalContact with SDS, statement about reviewing the causesDOC-024Public response
December 2021Report for 2021Bettercoal; lead assessorsWebinar on Russian plansDOC-056, p. 20Materials and decisions requested
30.12.202112.01.2022Court; Razrez TalTEKDanger-zone work suspended for 90 daysDOC-042Regulator’s statement; full decision requested
28.04.202203.05.2022BettercoalRussian programme suspendedDOC-079Overall programme status
July 2022 summaryJuly 2022Four producersPlan status publishedDOC-010, 011, 050, 051Individual verification dates require a log
August 20222022 annual reportUniperEnd of Russian coal purchasesDOC-006, p. 41Company’s commercial action
22.11.2023Registry entryBettercoal / RECOSIChange of legal nameDOC-055Registration number retained
25.03.202525.03.2025Central District Court; Prosecutor General’s OfficeJudgment against three executivesDOC-021Circumstances of July–November 2021
19.06.2025Procedure documentRECOSINew complaints procedureDOC-063Five-year criterion and deadlines
27.11.2025December 2025Plümacher; Wendler; RECOSIEnd / start of a director’s termDOC-067; DOC-068Historical and current roles distinguished
31.12.202517.08.2026RECOSIResults as at 2025DOC-083, p. 18; DOC-087279 items, a different sample
26.03; 02.04.2026Court decision textsKemerovo Regional CourtCivil appeals concerning consequences of the disasterDOC-085; DOC-084References to technical and criminal-case materials
28.10.202628.10.2026NataliaPreparing a submission for the 29 October picketPersonal testimonyAnswers and meeting still awaited

Table 2. Producers, legal entities and sites

Site names are taken from the reports; the precise legal entity in a regulatory case is given separately.

ProducerLegal entityScopeActual itineraryAssessorsEditionSources
KRUJSC Coal Company Kuzbassrazrezugol; INN 4205049090Six group open-pit minesKrasnobrodsky — November 2015; Bachatsky and Taldinsky — May 2017SLR Consulting: James McNally, Yelena BorovikovaEarly version before 1.1; precise edition requestedDOC-043, p. 5; DOC-035
SUEKJSC SUEK-Kuzbass — entity in regulatory cases; SUEK group assessmentSeveral regions and group sitesTaldinskaya-Zapadnaya-1 and -2, Yalevsky, Ruban, Zarechny; May 2018Paul Mitchell, Julija Menise, Tatiana Vasenko1.1 published by the visit date; contractually specified edition requestedDOC-044, p. 5–6; DOC-037, 038
SDS-UgolSDS-Ugol holding company; LLC Shakhta Listvyazhnaya; JSC ChernigovetsGroup, including Yuzhnaya and other sitesHead office, Salek / Vostochny, Chernigovets, Listvyazhnaya; November 2017Paul Mitchell, Julija Menise, Tatiana Vasenko1.1 published by the visit date; allocation of findings to individual mines requestedDOC-020, p. 4–5; DOC-021; DOC-039
Taldinskaya Mining CompanyJSC Shakhtoupravleniye Taldinskoye-Yuzhnoye — entity in the court decisionTaldinskaya-Yuzhnaya and KyrgayskayaBoth mines; November 2018The Dragonfly Initiative: Julija Menise, Tatiana Vasenko, Vladimir Simov, Peter Whitbread-Abrutat1.1 published by the visit date; contract requestedDOC-045, p. 5; DOC-040
KTKPJSC Kuzbasskaya Toplivnaya CompanyEarly-stage participation from January 2020No completed visit stated in the profile; regulatory inspection — Karakansky-YuzhnyNot statedLetter and applicable early-stage requirements requestedDOC-046; DOC-041
TalTEKLLC Razrez TalTEK — entity in the regulatory statementEarly-stage group participation from February 2021No completed visit stated in the profileNot statedLetter and applicable early-stage requirements requestedDOC-047; DOC-042

Table 3. Code 1.1 and incidents in Russia

DOC-053: version 1.1 approved on 28.06.2017. This table does not apply it retrospectively to KRU’s 2015 and May 2017 visits.

Provision / pageIncidentDocumentKnown responseWhat needs to be established
1.1: legal compliance; p. 12KRU: 2019 inspection, work suspensionsRegulatory statement DOC-034Bettercoal’s decision on the statement requestedWhich orders were included in monitoring, and when was implementation verified?
2.2: reporting violations and grievances; p. 14SDS: Misses for 2.2Ratings table DOC-020, p. 6Group plan; mine-specific measures requestedWhat grievance-mechanism deficiencies were remedied, and who verified this?
6.9: health and safety; p. 22SDS: Partially Meets; Listvyazhnaya — 2017 visit and 2021 disasterDOC-020; DOC-021; DOC-024Post-disaster statement; December 2021 webinarWhich items concerned the mine, and what checks preceded the accident?
6.9: safety; pp. 22–24Ruban mine: coal-dust explosion protection, 2020DOC-037Specific work prohibited, materials referred to courtWhat evidence of remediation did the assessor consider?
6.9: safety; pp. 22–24Taldinskaya-Yuzhnaya: development, 2020DOC-040Seven-day court-ordered suspensionWhen was remediation confirmed and the plan changed?
7.1.6: resettlement and participation; p. 25Kiselyovsk: mining close to homesDOC-001; DOC-080Observations and proposed measures publishedWhat specific projects were agreed with residents and implemented?
9.2: waste; p. 28Vakhrushevsky field and beneficiation wasteDOC-0352019 court decisionsHow is the court finding reflected in KRU’s plan?
9.3: air and dust; p. 29SUEK: NO₂ exceedance in a residential areaDOC-038Fine upheldWhat measures and follow-up measurements demonstrate improvement?
10: biodiversity; p. 29 onwardsSUEK: findings on environmental protectionDOC-044, p. 9Group planWhich sites and indicators were used for verification?

Table 4. Underlying data: improvement plans

Corporate groups’ plan items; statuses published in July 2022. Totals: 210 / 65 / 54 / 91.

ProducerTotalVerifiedAwaiting verificationOpenDate / document
KRU58202315July 2022; DOC-010
SUEK4017815July 2022; DOC-050
SDS-Ugol49161122July 2022; DOC-011
Taldinskaya Mining Company63121239July 2022; DOC-051

Table 5. Underlying data: Uniper purchases

Values transcribed without recalculation. Tonnage and profits were not calculated.

YearCategoryShareUnit / scopeSource
2019Russia, including Latvia35.1%% of direct contractual purchasesDOC-003, PDF 54 / printed 52
2020Russia, including Latvia29.9%% of direct contractual purchasesDOC-004, PDF 74
2021Russia22.6%% of direct contractual purchasesDOC-005, PDF 46, 93

Table 6. Balance-sheet figures, 2017–2022

Values read from the original balance-sheet pages. These are balances at a date, not annual income.

At 31 DecemberCash at bank and in hand, GBPTotal assets less current liabilities, GBPSource / page
2017334 450231 696DOC-070, PDF 4
2018489 895228 144DOC-071, PDF 4
2019338 480310 078DOC-072, PDF 4
2020247 423241 092DOC-073, PDF 4
2021223 482172 103DOC-074, PDF 4
2022295 022236 094DOC-075, PDF 4

Table 7. Published expenditure: different reporting structures

Sum of rows for 2021: GBP 571,000; 2025: GBP 845,890. Categories changed between years; 2025 includes the gas programme.

YearOriginal indicator nameExplanationGBPSource / PDF
2021SecretariatSecretariat395 000DOC-056, 22
2021Assessments, CIP Monitoring, Online Platform, Bettercoal StandardAssessments, plan monitoring, online platform and standard143 000DOC-056, 22
2021Internal GovernanceInternal governance19 000DOC-056, 22
2021CommunicationsCommunications14 000DOC-056, 22
2025RECOSI CostsRECOSI expenditure: secretariat, office management and programme development572 950DOC-083, 12
2025Internal GovernanceInternal governance25 279DOC-083, 12
2025Bettercoal ProgrammeBettercoal programme117 637DOC-083, 12
2025RECOSI Gas ProgrammeRECOSI gas programme80 422DOC-083, 12
2025Communications and Stakeholder EngagementCommunications and stakeholder engagement49 602DOC-083, 12

Table 8. Register of relationships and responsibilities

Each row establishes only the named relationship type. Appointments, membership, assessment payment and supply are recorded separately.

Person / organisationOther partyRelationship typePeriodDocumentPageEstablished facts
Frank PlümacherUniperServed as EVP HSSE & Sustainability2017 report, published May 2018; also 2019 reportDOC-078; DOC-00317; 54Professional job title; start date requires an appointment record
Frank PlümacherBettercoal Board of DirectorsElected ChairApril 2019; stated three-year termDOC-00354Election described by Uniper
Frank PlümacherBettercoal / RECOSI legal entityAppointed director18.06.2019; term ended 27.11.2025DOC-076; DOC-0681; 1Dates in registry forms AP01 and TM01
Frank PlümacherBettercoalApproved financial statements on behalf of the Board30.06.2020; 20.05.2021DOC-072; DOC-0734; 4F. Pluemacher signature on 2019 and 2020 balance sheets
Frank PlümacherUniperHuman Rights OfficerConfirmed at the research dateDOC-015Human Rights Officer sectionPublic role description; appointment date requested
Nadja WendlerWintershall Dea AGVice President SustainabilityEGYPES 2024DOC-05815Position and published statement
Nadja WendlerUniperSenior Vice President SustainabilityConfirmed by 03.12.2025 announcement and current pageDOC-013; DOC-014HTMLPrecise start date requested
Nadja WendlerRECOSI Board of DirectorsAppointed director; represents Uniper27.11.2025DOC-067; DOC-0131; HTMLRegistry date and organisational announcement
Gerda FransENGIE; RECOSIHead of ESG; RECOSI Board ChairAnnouncement of 03.12.2025DOC-013HTMLTwo distinct functions
Taco DoumaRWE Generation; RECOSIRWE representative; Vice-Chair03.12.2025 announcement: remains in officeDOC-013HTMLOriginal appointment date not established by this announcement
Katie WarrickBettercoal / RECOSIExecutive head2021 report; 2025 announcement; current structureDOC-056; DOC-013; DOC-0144; HTMLExecutive work, separate from chairmanship
Joachim LöchteBettercoalChairFounding announcement, 18.04.2012DOC-0661–2Role at the announcement date
DONG Energy, EDF, Enel, E.ON, GDF SUEZ, RWE, VattenfallBettercoalInitiative founders18.04.2012DOC-0661–2Original list; historical names retained
FortumBettercoalFirst new member18.04.2012DOC-0661–2Separate from the seven founders
UniperBettercoalUses assessments for supply verification and monitoring2019DOC-00354Company’s stated use of results
UniperUniper Supervisory BoardRegular information on responsible coal sourcingDescribed in the September 2017–October 2018 reportDOC-08824Frequency stated; communication list and decisions require minutes
UniperBettercoal secretariatSeconded an employee for two years to monitor plansDescribed in the September 2017–October 2018 reportDOC-08824Staff support; name and precise dates not stated
ENEL, ENGIE, ESB, Fortum, RWE, Uniper, VattenfallBettercoal Russia Working GroupMembersEstablished December 2018; described February 2020DOC-0022Working-group membership
Russia Working GroupTDI SustainabilityCommissioned the studyFebruary 2020 report; September 2019 visitDOC-0022–3Study and sources; payer of the individual invoice not disclosed
SLR Consulting / James McNally, Yelena BorovikovaKRUConducted the assessmentNovember 2015; May 2017DOC-0435Team membership and site visits
Paul Mitchell, Julija Menise, Tatiana VasenkoSDS-UgolConducted the assessmentNovember 2017DOC-0205Site-visit team
Paul Mitchell, Julija Menise, Tatiana VasenkoSUEKConducted the assessmentMay 2018DOC-0446Site-visit team
The Dragonfly Initiative / Julija Menise, Tatiana Vasenko, Vladimir Simov, Peter Whitbread-AbrutatTaldinskaya Mining CompanyConducted the assessmentNovember 2018DOC-0455Site-visit team
KRUKrasnobrodsky, Bachatsky, TaldinskyProducer’s sites; visited by assessors2015 and 2017DOC-0435Assessment itinerary, not a supply contract
SUEKTaldinskaya-Zapadnaya-1 and -2, Yalevsky, Ruban, ZarechnyProducer’s sites; visited by assessorsMay 2018DOC-0445–6Assessment itinerary
SDS-UgolSalek / Vostochny, Chernigovets, ListvyazhnayaGroup sites; visited by assessorsNovember 2017DOC-0204–5Assessment itinerary
SDS-UgolLLC Shakhta ListvyazhnayaSubsidiary2021 circumstances; statement of 25.03.2025DOC-021HTMLCorporate affiliation stated by the prosecution
JSC ChernigovetsYuzhnaya mineOperation / branchRuling of 12.02.2018DOC-039Ruling textLegal entity in the case about a specific working
Taldinskaya Mining CompanyTaldinskaya-Yuzhnaya and KyrgayskayaAssessment sitesNovember 2018DOC-0455Both mines visited
BettercoalKRU, SUEK, SDS-Ugol, Taldinskaya Mining CompanyPublished improvement-plan statusesJuly 2022DOC-010; DOC-050; DOC-011; DOC-051CIP profilesStatuses of group items
BettercoalKTK; TalTEKEarly-stage participationJanuary 2020; February 2021DOC-046; DOC-047Producer profilesNot a completed site assessment
BettercoalRussian producersSuspended engagementStatement of 28.04.2022; publication of 03.05.2022DOC-079HTMLProgramme and plan verification
RECOSI membersRECOSIAnnual membership fees2025: 14 membersDOC-08312General funding source; member-specific amounts not disclosed
Bettercoal producersRECOSI → third-party assessorsPay for assessments; RECOSI pays assessorsRule disclosed in the 2025 reportDOC-08312Current-period payment arrangements
Uniper‘Russia’ origin categoryPurchases under direct contracts2019–2021; Latvia included in 2019–2020DOC-003; DOC-004; DOC-00554; 74; 46, 93Aggregate by origin; specific seller not named

Table 9. Commercial relationships requiring documentation

These rows are not included as established supplies in the main diagram.

BuyerPotential seller / subjectAvailable informationPeriod, volume, siteSourceDocuments requested
Uniper Global Commodities SEKRUVolza entry, commodity code 2701Dates, volume and mine absent from the public entryDOC-077Contract, invoice, bill of lading, mine of origin and matching legal entity
Uniper Global Commodities SESDS-UgolVolza entry, commodity code 2701Dates, volume and mine absent from the public entryDOC-077Purchasing history by legal entity and consignment
Fortum / Uniper‘This supplier’ in the answer about ListvyazhnayaAnswer to question 39: no purchases in recent yearsYears and legal entity not separately namedDOC-052, p. 16Clarify the answer’s period and subject; do not substitute a specific mine for the group
Additional buyers and suppliersRequire an inventoryMaterials not included in the verified set——Provide primary documents; match seller, buyer, dates and origin

Table 10. Correspondence with article V11

Baseline version: web-v11/article-ru.json. The checksum is preserved in article-baseline.json. Exact wording of each claim appears in the CLM cards and a separate CSV.

Article sectionChapter / cardsSources and locationsVerification result
What the documents show (opening)ch. 8; ch. 5; ch. 6; ch. 7; CLM-007; CLM-008; CLM-018; CLM-021; CLM-029; CLM-030DOC-003: PDF 54, 63; DOC-020: PDF 4, 5; DOC-021: specified paragraphs / rows; DOC-089: PDF 34The November 2017 itinerary and May 2018 plan are linked to the same mine; the judicial announcement describes inaction in July–November 2021. Uniper reported use of assessments and regular reporting.
Kiselyovsk: what Uniper saw (visit)ch. 8; CLM-034; CLM-035DOC-001: specified paragraphs / rows; DOC-080: specified paragraphs / rowsUniper described a short visit to Kiselyovsk in September 2019 and mining close to homes. The engineer’s report establishes 461.98 m to the house inspected; this is not the author’s flat.
Bettercoal: buyers created their own assessment system (organization)ch. 4; ch. 9; CLM-001; CLM-002; CLM-053; CLM-051; CLM-055DOC-055: specified paragraphs / rows; DOC-066: PDF 1; DOC-069: PDF 10; DOC-088: PDF 24Incorporation, seven original founders and voting rules in the 2023 edition are confirmed. The 2017/18 report discloses secretariat staff support and regular information for Uniper’s Board.
Who pays for assessments, and what the accounts reveal (money)ch. 4; CLM-045; CLM-046; CLM-047DOC-070: PDF 4; DOC-071: PDF 4; DOC-072: PDF 4; DOC-073: PDF 4; DOC-074: PDF 4; DOC-075: PDF 4; DOC-056: PDF 22; DOC-083: PDF 12Balance sheets contain balances at a date. The 2021 expenses total GBP 571,000, and the 2025 expenses GBP 845,890; categories differ. Individual payers’ contributions require a breakdown.
What the Code promised — and how assessments were conducted (rules)ch. 5; ch. 7; CLM-008; CLM-009; CLM-010; CLM-019; CLM-020; CLM-021DOC-003: PDF 63; DOC-053: PDF 7; DOC-043: PDF 5; DOC-045: PDF 5; DOC-020: PDF 6, 10, 5Code 1.1 was approved on 28.06.2017; KRU’s early visits predate this. The letter became mandatory after the 2017 process revision. Compliance ratings and the immediate-action category are recorded separately.
KRU: the open-pit mines visited, more than 200 violations and a waste dispute (kru)ch. 6; CLM-011; CLM-012; CLM-013; CLM-014DOC-043: PDF 5; DOC-034: specified paragraphs / rows; DOC-035: specified paragraphs / rows; DOC-036: specified paragraphs / rowsThe itinerary includes three named open-pit mines. The 2019 inspection identified more than 200 violations and suspended specific work. Waste dispute А27-110/2019 and the penalty overturned on 27.06.2019 are separate cases.
SUEK: hazardous coal dust, air pollution and noise (suek)ch. 6; CLM-015; CLM-016; CLM-017DOC-044: PDF 5, 6; DOC-037: specified paragraphs / rows; DOC-038: specified paragraphs / rowsFive sites visited in May 2018. Specific preparatory work and cargo transport prohibited at Ruban mine. Separate court incident concerning JSC SUEK-Kuzbass: NO₂ ×2.7, noise +1.3 dBA; fine upheld.
SDS: a ‘positive conclusion’ and improvements still outstanding (sds-assessment)ch. 6; ch. 5; ch. 7; CLM-018; CLM-019; CLM-020; CLM-021; CLM-022; CLM-054DOC-020: PDF 4, 5, 6, 10; DOC-039: specified paragraphs / rows; DOC-048: specified paragraphs / rowsThe corporate ‘positive conclusion’ (DOC-048) is compared with Misses for 2.2 and Partially Meets for 6.9 (DOC-020). The ratings concern the group; Yuzhnaya is within the overall scope, while Listvyazhnaya and Vostochny are named in the itinerary.
Listvyazhnaya: what the Bettercoal report said (assessment)ch. 6; ch. 5; ch. 7; CLM-018; CLM-019; CLM-020; CLM-021; CLM-054DOC-020: PDF 4, 5, 6, 10; DOC-048: specified paragraphs / rowsListvyazhnaya is named as visited. The plan was agreed in May 2018. The two ratings concern the SDS group; the absence of Immediate Resolutions does not change their substance.
One mine, different documents (mine)ch. 7; CLM-029; CLM-030; CLM-052DOC-021: specified paragraphs / rows; DOC-089: PDF 34; DOC-084: specified paragraphs / rows; DOC-085: specified paragraphs / rowsThe Emergencies Ministry records the disaster on 25.11.2021 and 51 deaths, including five rescuers. The prosecution reports the judgment against executives; the 2026 decisions cite a separate criminal case concerning Mikon III.
What Bettercoal did after the disaster (response)ch. 7; CLM-031; CLM-032; CLM-033DOC-024: specified paragraphs / rows; DOC-056: PDF 20; DOC-079: specified paragraphs / rowsA statement was published after the disaster on 26.11.2021; the December webinar is described in the annual report. Overall engagement was suspended on 28.04.2022. Results of the promised review are requested.
Listvyazhnaya and Bettercoal: events and dates (chronology)ch. 6; ch. 7; CLM-018; CLM-021; CLM-029; CLM-030; CLM-031; CLM-032; CLM-033; CLM-052DOC-020: PDF 4, 5; DOC-021: specified paragraphs / rows; DOC-089: PDF 34; DOC-024: specified paragraphs / rows; DOC-056: PDF 20; DOC-079: specified paragraphs / rows; DOC-084: specified paragraphs / rows; DOC-085: specified paragraphs / rowsDates of the visit, plan, 2021 circumstances, disaster, response and subsequent judicial publications are distinguished.
Taldinskaya Mining Company: two mines and a development-work suspension (tmc)ch. 6; CLM-023; CLM-024DOC-045: PDF 5; DOC-040: specified paragraphs / rowsTwo mines visited in November 2018; plan agreed in September 2019. Court suspension on 02.11.2020 concerns conveyor-roadway development for seven days.
KTK and TalTEK: early-stage participation and work suspensions (candidates)ch. 6; CLM-025; CLM-026; CLM-027DOC-046: specified paragraphs / rows; DOC-047: specified paragraphs / rows; DOC-041: specified paragraphs / rows; DOC-042: specified paragraphs / rowsKTK and TalTEK profiles describe an early stage. According to regulatory statements, work in danger zones was suspended for 60 and 90 days respectively.
What remained outstanding in four producers’ plans (plans)ch. 6; ch. 7; CLM-028; CLM-033DOC-010: specified paragraphs / rows; DOC-050: specified paragraphs / rows; DOC-011: specified paragraphs / rows; DOC-051: specified paragraphs / rows; DOC-079: specified paragraphs / rowsFour July 2022 profiles: 210 items, 65 verified, 54 awaiting verification, 91 open. Statuses published after engagement was suspended; profile dates do not imply new site visits.
Code requirements and incidents in Russia (code-comparison)ch. 5; ch. 6; CLM-009; CLM-012; CLM-013; CLM-016; CLM-017; CLM-019; CLM-020; CLM-022; CLM-024DOC-053: PDF 7; DOC-034: specified paragraphs / rows; DOC-035: specified paragraphs / rows; DOC-037: specified paragraphs / rows; DOC-038: specified paragraphs / rows; DOC-020: PDF 6, 10; DOC-039: specified paragraphs / rows; DOC-040: specified paragraphs / rowsTable 3 compares specific Code 1.1 topics with incidents at operations. The version is not applied retrospectively to KRU visits. Allocation of group findings to mines is requested.
Suspension of participation and residents’ complaints (limits-and-complaints)ch. 7; ch. 5; CLM-033; CLM-049; CLM-050DOC-079: specified paragraphs / rows; DOC-063: PDF 3; DOC-059: specified paragraphs / rows; DOC-083: PDF 17The Russian programme’s suspension is dated April 2022. As at 28.10.2026, November 2021 events fall within five years. The 2025 report schedules completion of two processes, including Shubarkol, for 2026.
After the visit: purchases and the shareholder vote (trade)ch. 8; CLM-037; CLM-038; CLM-039DOC-003: PDF 54; DOC-004: PDF 74; DOC-005: PDF 46; DOC-006: PDF 41; DOC-081: PDF 1Direct purchasing shares — 35.1%, 29.9%, 22.6%; the first two include Latvia. 94.48% concerns approval of the Supervisory Board’s actions in 2020. Uniper reports the end of Russian purchases from August 2022.
Who supplied Uniper: Fortum’s answer and the limits of a trade database (suppliers)ch. 8; CLM-040DOC-052: PDF 16Fortum question No. 39 concerns Listvyazhnaya; the answer uses ‘this supplier’ and ‘past years’. Comparison with the trade database requires dates, legal entities and consignment origins.
The warning about intimidation was in the report (warnings)ch. 8; ch. 10; CLM-036; CLM-044DOC-002: PDF 4, 7; DOC-008: PDF 5, 15TDI relays FERN’s report of intimidation; Ecodefense’s report cites videos from Natalia’s outlet. This establishes information provenance, while its receipt date by the delegation requires correspondence and appendices.
My story in reports published at the time (natalia-record)ch. 10; CLM-041; CLM-042; CLM-043; CLM-044DOC-026: specified paragraphs / rows; DOC-032: specified paragraphs / rows; DOC-028: specified paragraphs / rows; DOC-008: PDF 5, 15CPJ describes the attack, citing publications and an interview with Natalia. Sibir.Realii relays her account of departure. Each testimony’s provenance is identified.
A threat to burn me alive — and a publication featuring fire (threat-image)ch. 10; CLM-042DOC-032: specified paragraphs / rowsA publication of 21.08.2020 featuring a fire montage is established. The origin of the private message announcing an ‘execution’ requires a separate original.
Frank Plümacher: Bettercoal Chair and Uniper Human Rights Officer (plumacher)ch. 9; CLM-003; CLM-004; CLM-051; CLM-055; CLM-056DOC-003: PDF 54; DOC-076: PDF 1; DOC-068: PDF 1; DOC-088: PDF 24; DOC-015: specified paragraphs / rowsUniper dates election as Chair to April 2019; forms record appointment as director on 18.06.2019 and the end of the term on 27.11.2025. These are different events. His current Human Rights Officer role is confirmed by Uniper’s page. Staff support and information for the Board are company actions.
Nadja Wendler: sustainability at Uniper and a seat on RECOSI’s Board (wendler)ch. 9; CLM-005; CLM-006; CLM-057DOC-067: PDF 1; DOC-058: PDF 15; DOC-013: specified paragraphs / rowsThe form records appointment as RECOSI director on 27.11.2025. The 03.12.2025 announcement names the SVP Sustainability role at Uniper. The EGYPES 2024 programme identifies Wintershall Dea. Current responsibilities are not projected back onto Russian events in 2017–2022.
The questions I am taking to Uniper (questions)Appendices B and C; personal testimony and prepared questionsThe agreed questions and personal testimony are retained. At the article date, the meeting is only being requested; requests sent and answers received are added on the basis of supporting documents.

Figure 1. Shares of Uniper’s direct contractual purchases

Shares of Uniper’s direct contractual purchases0%10%20%30%40%35.1%2019Russia, including LatviaDOC-00329.9%2020Russia, including LatviaDOC-00422.6%2021RussiaDOC-005
DOC-003, PDF 54; DOC-004, PDF 74; DOC-005, PDF 46, 93. Reported values without recalculation. 2019–2020 include Latvia; 2021 — Russia. Percentages, not tonnage or profits.

Figure 2. Status of four producers’ improvement plans

Four producers’ plans — July 2022KRUDOC-010202315Total 58SUEKDOC-05017815Total 40SDS-UgolDOC-011161122Total 49Taldinskaya MiningCompanyDOC-051121239Total 63010203040506070Number of plan itemsVerifiedAwaiting verificationOpen
DOC-010, DOC-050, DOC-011, DOC-051, CIP progress profiles, July 2022. Counts of group items are shown. Engagement suspended in April 2022. Items do not equal the number of legal violations.

Figure 3. Bettercoal’s cash, 2017–2022

Cash balance at 31 December0100200300400500334 4502017DOC-070489 8952018DOC-071338 4802019DOC-072247 4232020DOC-073223 4822021DOC-074295 0222022DOC-075GBP thousandsValues above bars are in GBP. Cash balance, not annual income.
DOC-070–DOC-075, PDF 4 of each balance sheet. Cash at bank and in hand. Axis in GBP thousands; value labels in GBP. The same date each year — 31 December.

Figure 4. A. People, employers and the organisation’s Board — part 1

A. People, employers and the organisation’s Board — part 1Frank PlümacherUniperserved as EVP HSSE & Sustainability2017/2018 and 2019 · DOC-078 p. 17; DOC-003 p. 54Frank PlümacherBettercoal / RECOSI Boardchaired; director registration recordedseparately2019–2025 · DOC-003, 056, 068, 076Frank PlümacherUniperHuman Rights OfficerCurrent page · DOC-015Nadja WendlerWintershall Dea AGserved as VP Sustainability2024 · DOC-058 p. 15
Lines denote positions and representation; start dates of individual employment roles are requested.

Figure 5. A. People, employers and the organisation’s Board — part 2

A. People, employers and the organisation’s Board — part 2Nadja WendlerUniperserves as SVP SustainabilityConfirmed 03.12.2025 · DOC-013Nadja WendlerRECOSI Boardrepresents Uniper; appointed director27.11.2025 · DOC-067 p. 1; DOC-013Gerda Frans / ENGIERECOSI BoardchairsAnnouncement of 03.12.2025 · DOC-013
Lines denote positions and representation; start dates of individual employment roles are requested.

Figure 6. B. Confirmed information on purchases and assessments

B. Confirmed information on purchases and assessmentsUniperBettercoal resultsuses assessments for risk checks andmonitoring2019 · DOC-003 p. 54UniperRussia, including Latviapurchased under direct contracts: 35.1% / 29.9%2019 / 2020 · DOC-003 p. 54; DOC-004 p. 74UniperRussiapurchased under direct contracts: 22.6%2021 · DOC-005 pp. 46, 93BettercoalKRU, SUEK, SDS, TaldinskayaMining Companyassessed and published plan statuses2015–2022 · DOC-020, 043–045, 010–011, 050–051
Trade-database seller–buyer pairs are placed in the requests table. Mine-level origins require documents.

Figure 7. C. Producers and sites actually visited

C. Producers and sites actually visitedKRUKrasnobrodsky; Bachatsky;Taldinskyproducer’s sites; visited by assessorsNovember 2015 / May 2017 · DOC-043 p. 5SUEKTaldinskaya-Zapadnaya-1 and -2;Yalevsky; Ruban; Zarechnyproducer’s sites; visited by assessorsMay 2018 · DOC-044 pp. 5–6SDS-UgolSalek / Vostochny; Chernigovets;Listvyazhnayagroup sites; visited by assessorsNovember 2017 · DOC-020 pp. 4–5Taldinskaya MiningCompanyTaldinskaya-Yuzhnaya;Kyrgayskayaassessment sites; both mines visitedNovember 2018 · DOC-045 p. 5
Yuzhnaya mine — SDS overall scope, not the visit list. KTK and TalTEK — early-stage participation.

Figure 8. D. Key changes over time — part 1

D. Key changes over time — part 12012Bettercoal Ltd; seven foundersincorporation and initiative establishedDOC-055; DOC-0662015–2018KRU; SDS; SUEK; TaldinskayaMining Companysite assessmentsDOC-043; DOC-020; DOC-044; DOC-0452019Bettercoal Board; KiselyovskPlümacher’s chairmanship; separately — visit UniperDOC-003 p. 54; DOC-0012021Bettercoal; Russian plansremote monitoring; after the disaster — responseDOC-056 pp. 3, 20; DOC-024
This is a chronological sequence. Personal involvement in specific decisions is checked against minutes.

Figure 9. D. Key changes over time — part 2

D. Key changes over time — part 22022Bettercoal / Uniper — separatedecisionsApril: programme suspended; August: purchases endedDOC-079; DOC-006 p. 412023 / 2025RECOSI; Wendler’s appointmentname change; later — Board membership changeDOC-055; DOC-067; DOC-068
This is a chronological sequence. Personal involvement in specific decisions is checked against minutes.

Figure 10. E. Assessment and complaints procedure under current rules

E. Assessment and complaints procedure under current rulesProducerSecretariatsubmits information; undergoes initial screening2024 guidance · DOC-061Independent assessorReport and improvement planchecks documents, visits sites, conductsinterviews2024 guidance · DOC-061ProducerAssessor verifies; secretariatmonitors deadlinessubmits evidence of implementationDOC-061; Policy of Association 2025 · DOC-062ComplainantConsideration; decision;possibility of appealsubmits complaint; may request confidentialityProcedure of 19.06.2025 · DOC-063
The diagram describes the 2024–2025 versions. Historical assessments are examined under the rules then in force.

Figure 11. Listvyazhnaya chronology: events and publications — part 1

Listvyazhnaya: events and publicationsNovember 2017Site visit to ListvyazhnayaReport published 09.01.2019DOC-020 p. 4–5May 2018Group plan agreedReport published 09.01.2019DOC-020 p. 5July–November 2021Executives’ period of inactionCourt outcome published 25.03.2025DOC-02125 November 2021DisasterEvent; subsequent judicial examinationDOC-089 p. 34; DOC-084–085
Rows show the sequence of events. Publication dates are distinguished from event dates; each row identifies its sources. Full chronology — table 1.

Figure 12. Listvyazhnaya chronology: events and publications — part 2

Listvyazhnaya: events and publications26 November / December 2021Statement / assessors’ webinarImmediate statement; webinar described in the 2021 reportDOC-024; DOC-056 p. 2028 April 2022Russian programme suspendedPublication 03.05.2022DOC-07925 March 2025Judgment against executivesProsecution statement the same dayDOC-021
Rows show the sequence of events. Publication dates are distinguished from event dates; each row identifies its sources. Full chronology — table 1.

Figure 13. Overview, part 1. People, Uniper and Bettercoal / RECOSI bodies

Frank PlümacherUniper: EVP HSSE &Sustainability · 2019Elected Chair: April 2019DOC-003, PDF 54; director: DOC-076Bettercoal Boardgoverns the organisationDOC-056, 2021 reportUniper2017/18 reportDOC-088, PDF 24Seconded an employee for two yearsto support plan monitoringBettercoal secretariatname and geographical scopenot stated in this documentResponsible sourcinginformation on Uniper’s workDOC-088, PDF 24Regular information providedin the 2017/18 reporting periodSupervisory BoardUniperreceives informationNadja WendlerUniper: SVP SustainabilityDOC-013, 03.12.2025Appointed director 27.11.2025DOC-067, PDF 1RECOSI Boardcurrent addressee of questionsrole from 2025
Each line represents the named relationship in the stated period. The Board governs the organisation; the secretariat supports plan monitoring. Continued in the next figure: the Bettercoal programme, producers and sites. Commercial purchases are not shown here.

Figure 14. Overview, part 2. Programme, producers and sites visited

Bettercoalsite assessment2015 / May 2017DOC-043, PDF 5KRUproducer’s sitesin the assessment reportvisitedKrasnobrodsky,Bachatsky, TaldinskyBettercoalsite assessmentMay 2018DOC-044, PDF 5–6SUEKproducer’s sitesin the assessment reportvisitedTaldinskaya-Zapadnaya:1 and 2; Yalevsky; RubanBettercoalsite assessmentNovember 2017DOC-020, PDF 4–5SDS-Ugolproducer’s sitesin the assessment reportvisitedVostochny, Chernigovets,ListvyazhnayaBettercoalsite assessmentNovember 2018DOC-045, PDF 5Taldinskaya MiningCompanyin the assessment reportvisitedTaldinskaya-Yuzhnaya,Kyrgayskaya
Lines: Bettercoal assessed the producer; assessors visited the specified sites. SUEK’s itinerary also included Zarechny open-pit mine (DOC-044, PDF 5–6). Dates and documents relate to each row. Membership and assessment are separate from purchases.

12. Documents requested and status of submissions

AddresseeDocumentsPurpose
RECOSI / BettercoalFull reports and site-specific plans for the four producers; historical Code editions and assessor contractsTo allocate findings to mines and establish precisely which rules applied
RECOSI / BettercoalHalf-yearly reports, implementation evidence and assessors’ decisions for 2017–2022; deadline-change logTo examine monitoring between site visits
RECOSI / BettercoalDecember 2021 webinar materials and results of the disaster reviewTo reconstruct the response after 25 November
UniperItinerary, delegation list, organisers and accompanying persons; rules for conversations with residents; final visit memorandumTo reconstruct the Kiselyovsk visit and identify recipients of its findings
Uniper / RECOSIIncoming Ecodefense materials, information on CPJ/RSF, complaint records and measures takenTo distinguish public availability from actual receipt
UniperContracts and consignments for 2019–2022: seller, buyer, commodity, volume, date, mine of originTo check the supply chain and Fortum’s answer
Uniper / Frank PlümacherChair-election minutes, HRO appointment, Board materials on Russian risksTo establish precise responsibilities and personal involvement in decisions
Uniper / Nadja WendlerAppointment date, responsibilities for historical risks, submission-handling procedureFor current consideration by a specific addressee
RECOSIHistorical Articles, appointment and voting rules; breakdown of fees, invoices and payment for Russian assessmentsFor a full picture of governance and funding
Regulators / courts / producersFull inspection records, court-ordered work suspensions, implementation documents and Listvyazhnaya technical investigationTo check subsequent measures and causes against primary records
RECOSIList of complaints concerning Russian events, anonymised decisions, application of the five-year limitTo examine the mechanism in practice and ongoing consequences

As at 28.10.2026, these are prepared requests. The research contains no evidence of dispatch or answers. These are to be added in a separate dated update.

13. Gaps and clarifications concerning the web article

The research is limited to preserved documents and verified passages. Some regulatory statements are available as press-service republications, while the full inspection record or court ruling is requested. For TDI, certain Uniper pages and the trade database, records of web reading have been preserved; the original PDF or complete export was not obtained in every case. The register separately identifies the storage method. Missing details are not filled with assumptions.

  1. New information: RECOSI’s 2025 report was published on 17 August 2026. Its results can be added to the article separately from the 2024 section. As at 31 December 2025, RECOSI’s report lists 279 items: 66 closed, 30 awaiting verification and 183 open.
  2. Reference clarification: in the preserved Russian Ecodefense report, video references appear on PDF pages 5 and 15, notes 17 and 75. Printed pagination and English-version pages differ.
  3. Clarification of the period in office: Uniper’s 2017 report was published in May 2018. It confirms Plümacher’s stated position, but the precise appointment date must come from a personnel document.
  4. Profile discrepancies: KRU’s and SUEK’s participation start dates in timelines differ from letter dates in assessment reports. The letters and an explanation of profile fields are needed.
  5. Additional court documents: the decisions of 26 March and 2 April 2026 refer to the technical investigation and criminal cases. Dates are taken from within the documents, rather than aggregator headings.
  6. Uniper page: the archived snapshot of 18 June 2020 is preserved. On 28 October 2026, the original cr.uniper.energy address was unavailable, while the archived copy opened. Verification details and translation appear in appendix A22.
  7. Additional supplier information: included after checking primary documents and matching legal entities.

Article V11 and earlier PDFs are preserved. The list above records documentary additions and clarifications to the article.

14. Cards for material claims

CLM-001. The legal entity was incorporated on 28 February 2012 under No. 07968009; its name changed in November 2023.

Source and location: DOC-055, Company overview; Previous company names.

Document fields or entries: RESPONSIBLE COMMODITIES SOURCING INITIATIVE LTD. Company number 07968009. Incorporated on 28 February 2012. Previous company names: BETTERCOAL — 28 Feb 2012 – 22 Nov 2023.

Basis for the finding: The name, number and two dates are read from the corresponding fields of a single registry entry.

Verification outcome: Continuity of the organisation in the register.

Scope and further verification: The registered office does not establish the actual office location.

Comparison: Founding press release DOC-066.

CLM-002. The initiative’s seven founders: DONG Energy, EDF, Enel, E.ON, GDF SUEZ, RWE, Vattenfall.

Source and location: DOC-066, PDF 1, paragraph after the opening statement.

Original excerpt: The initiative has been set up by founding members DONG Energy, EDF, Enel, E.ON, GDF SUEZ, RWE and Vattenfall, and aims to support on-the-ground changes to the benefit of workers, communities, businesses and the environment.

Basis for the finding: The sentence explicitly names seven founders; the next sentence identifies Fortum as the first new member.

Verification outcome: List at the announcement date, 18 April 2012.

Scope and further verification: Current names and membership do not replace the original list.

Comparison: DOC-055 and the current structure DOC-014.

CLM-003. Frank Plümacher was elected Bettercoal Chair in April 2019.

Source and location: DOC-003, PDF 54 / printed 52.

Original excerpt: In April 2019, Frank Plümacher, our Executive Vice President for HSSE & Sustainability, was elected to serve as Chairman of Bettercoal’s Board of Directors for the next three years.

Basis for the finding: The sentence establishes the name, Uniper position, election as Chair, month and stated term. The registry appointment as director is examined separately in CLM-004.

Verification outcome: Uniper’s announcement of the election and three-year term.

Scope and further verification: Registry appointment as director is a separate event.

Comparison: DOC-076, AP01, 18 June 2019.

CLM-004. Plümacher’s appointment as director is dated 18 June 2019; his term ended on 27 November 2025.

Source and location: DOC-076, PDF 1, form AP01; visual reading of the scan.

Document fields or entries: Appointment of Director. Company Name: BETTERCOAL. Company Number: 07968009. Date of Appointment: 18/06/2019. Name: MR FRANK PLUMACHER.

Basis for the finding: The heading and form fields identifying the appointment, person and date are transcribed.

Source and location: DOC-068, PDF 1, form TM01.

Document fields or entries: Termination of a Director Appointment. Company Name: RESPONSIBLE COMMODITIES SOURCING INITIATIVE LTD. Date of termination: 27/11/2025. Name: MR FRANK PLUMACHER.

Basis for the finding: The form records the end of the directorship of the same legal entity.

Verification outcome: Registry events.

Scope and further verification: The start date of the Chair’s actual responsibilities requires minutes.

Comparison: DOC-003 and DOC-013.

CLM-005. Nadja Wendler was appointed a RECOSI director on 27 November 2025.

Source and location: DOC-067, PDF 1, form AP01.

Document fields or entries: Appointment of Director. Company Name: Responsible Commodities Sourcing Initiative Ltd. Date of Appointment: 27/11/2025. Name: MS NADJA WENDLER.

Basis for the finding: The fields concern appointment as director, rather than the start of employment at Uniper. Personal details from the form are not included in the public copy.

Verification outcome: Appointment date.

Scope and further verification: The role is not projected back onto 2017–2022.

Comparison: Announcement of 3 December DOC-013.

CLM-006. EGYPES 2024 identifies Wendler as Vice President Sustainability at Wintershall Dea.

Source and location: DOC-058, PDF 15 / printed 26–27, attribution beneath the statement.

Document fields or entries: Nadja Wendler / Vice President, Sustainability / Wintershall Dea AG

Basis for the finding: The attribution directly connects name, role and employer in the EGYPES 2024 material.

Verification outcome: Position on the conference page.

Scope and further verification: The precise date of her move to Uniper requires a document.

Comparison: DOC-013 confirms Uniper by December 2025.

CLM-007. Uniper described using Bettercoal assessments for risk checks and supply monitoring.

Source and location: DOC-003, PDF 54 / printed 52.

Original excerpt: Bettercoal independently assesses the performance of coal mining operations against the ten principles of the Bettercoal Code. We use this information in our ESG due diligence process and in monitoring our supply chain.

Basis for the finding: ‘This information’ refers to the operation-assessment results in the preceding sentence. Both sentences are therefore included.

Verification outcome: Company’s stated use of the information.

Scope and further verification: A consignment-specific decision requires a separate document.

Comparison: Reporting frequency on PDF 63.

CLM-008. In its 2019 report, Uniper stated that Russian producers were reporting implementation of their improvement plans at least twice a year.

Source and location: DOC-003, PDF 63 / printed 61, continuation of the section on the Russia Working Group.

Original excerpt: These companies are currently reporting at least bi-annually on their continuous improvement plans. The RWG adopts a coordinated approach to monitoring suppliers’ improvement plans, enhancing its members’ country-context expertise, addressing risks arising from the country context, increasing the number of participating suppliers, and improving communications with key stakeholders.

Basis for the finding: This describes practice at the report date, rather than a universal rule for every year. Reference to the RWG establishes the Russian context.

Verification outcome: This describes Russian producers’ reporting at the time in Uniper’s report.

Scope and further verification: The actual sequence of communications requires a log and the reports themselves.

Comparison: SDS public report DOC-020, p. 7.

CLM-009. Code 1.1 was approved on 28 June 2017.

Source and location: DOC-053, PDF 7 / printed 6, section IV. Status and Effective date.

Original excerpt: This is Version 1.1 (2017) of the Bettercoal Code, which was approved by the Board of Directors on 28 June 2017 and is applicable from the date of publication.

Basis for the finding: The approval date and effective-date rule are stated separately. The reference has been corrected from PDF 3–5 to PDF 7.

Verification outcome: Temporal boundary of the edition.

Scope and further verification: KRU’s 2015 and May 2017 visits are not assessed retrospectively against 1.1.

Comparison: DOC-043, p. 5.

CLM-010. The mandatory producer letter was introduced after the 2017 process revision.

Source and location: DOC-043, PDF 5, footnote to Step 1.

Original excerpt: Letter of Commitment only required after process review in 2017

Basis for the finding: The footnote explains why KRU’s 2015 and May 2017 visits preceded the November 2017 letter.

Source and location: DOC-045, PDF 5, footnote to Step 1.

Original excerpt: Letter of Commitment only required after process review in 2017

Basis for the finding: The same footnote accompanies Taldinskaya Mining Company’s historical sequence.

Verification outcome: The notes explain the sequence of early assessments.

Scope and further verification: A later letter date does not invalidate an earlier visit.

Comparison: Timeline discrepancies DOC-010 and DOC-050 are included in the request.

CLM-011. KRU: Krasnobrodsky was actually visited in 2015, and Bachatsky and Taldinsky in May 2017.

Source and location: DOC-043, PDF 5, Site-Assessment Scope.

Document fields or entries: Site-Assessment Scope: (November 2015) — Krasnobrodskiy Mine Site; (May 2017) — Batchatsky Mine; (May 2017) — Taldinsky Mine.

Basis for the finding: Specifically the site-visit entry is transcribed. The overall scope list of six open-pit mines appears above under a different heading.

Verification outcome: Assessment itinerary.

Scope and further verification: Six open-pit mines in the overall scope do not mean six visited.

Comparison: DOC-034 — subsequent 2019 inspection.

CLM-012. KRU’s 2019 inspection identified more than 200 violations; specific work was suspended.

Source and location: DOC-034, statement of 14.05.2019, paragraphs on findings and suspensions.

English translation of the original excerpt: Following the inspection activities, regulatory officers drew up a report and issued an order to remedy more than 200 breaches of industrial safety requirements.

Original in Russian.

Basis for the finding: The count concerns the overall inspection of the operation.

Source and location: DOC-034, same statement, following paragraph.

English translation of the original excerpt: […] operation and loading and unloading work at transfer point No. 2 of open-pit mine No. 5 of the Bachatsky Coal Mine branch were suspended for one month. Mining and drilling along the roof of the Moshchny seam at open-pit mine No. 7 of the Krasnobrodsky Coal Mine branch were suspended for three months.

Original in Russian.

Basis for the finding: The excerpt identifies the duration and limited subject of each suspension; it does not shut down every open-pit mine in its entirety.

Verification outcome: Regulator’s press-service statement on the inspection of 70 sites.

Scope and further verification: The precise violation list and implementation require inspection records.

Comparison: Sites visited DOC-043; separate overturned penalty DOC-036.

CLM-013. Case А27-110/2019 concerns waste at the Vakhrushevsky field and payments for 2013–2015.

Source and location: DOC-035, ruling of 20.11.2019, account of the order.

English translation of the original excerpt: […] submit to the Directorate an adjusted calculation of environmental impact charges for 2013–2015 concerning the placement of coal-beneficiation waste from OU KNS 4 of the Krasnobrodsky Coal Mine branch (Vakhrushevsky field).

Original in Russian.

Basis for the finding: The quotation identifies the calculation period, waste type, branch and field together.

Source and location: DOC-035, reasoning section.

English translation of the original excerpt: In dismissing the claims, the arbitrazh courts proceeded on the basis that the challenged orders complied with current legislation and that the rights and legitimate interests of JSC Coal Company Kuzbassrazrezugol had not been infringed.

Original in Russian.

Basis for the finding: Establishes the legal entity and the court’s assessment of the challenged orders.

Verification outcome: Subject of the dispute, legal entity and outcomes at each judicial level.

Scope and further verification: This is a separate waste dispute, not a list of industrial violations.

Comparison: Code 1.1, section 9.2; DOC-053.

CLM-014. On 27 June 2019, KRU’s fine concerning rules for operating gas-cleaning installations was overturned.

Source and location: DOC-036, operative part of the decision of 27.06.2019.

English translation of the original excerpt: The decision of the Russian Federation state inspector for environmental protection and natural resource use in Kemerovo Region, No. [redacted], dated 13 May 2019, issued against Joint Stock Company Coal Company Kuzbassrazrezugol in administrative-offence proceedings under part 3 of article 8.21 of the Russian Federation Code of Administrative Offences, shall be overturned. These proceedings shall be terminated under point 3 of part 1 of article 30.7 of the Russian Federation Code of Administrative Offences.

Original in Russian.

Basis for the finding: The date of the overturned decision, company concerned, article and both outcomes — overturning and termination — are given. The decision number is redacted in the published judgment.

Verification outcome: Penalty overturned, proceedings terminated.

Scope and further verification: Do not treat as a fine in force.

Comparison: Separate from the inspection DOC-034.

CLM-015. SUEK: assessors visited five sites in May 2018, including Ruban mine.

Source and location: DOC-044, PDF 5, Site-Assessment Scope.

Document fields or entries: Site-Assessment Scope (sites selected by the assessor following the methodology described in the Assessment Manual): Taldinskaya–Zapadnaya 1 underground mine; Taldinskaya–Zapadnaya 2 underground mine; Yalevskogo underground mine; Zarechny open pit; Rubana underground mine.

Basis for the finding: The list confirms five specific sites. The visit date is read from the next part of the report’s table.

Source and location: DOC-044, PDF 6, Step 3.

Document fields or entries: Step 3: Site-Assessment — Completed in May 2018.

Basis for the finding: This entry supplements the site list on PDF 5 with the visit date.

Verification outcome: Assessment itinerary and team.

Scope and further verification: Group findings are not allocated to mines without the full report.

Comparison: DOC-037 — specific mine, 2020.

CLM-016. Development of assembly roadway 816 and cargo transport along roadway 818 were prohibited at Ruban mine.

Source and location: DOC-037, publication of 25.02.2020, paragraph on the official record.

English translation of the original excerpt: Inspectors of Rostekhnadzor’s Siberian Directorate drew up a record temporarily prohibiting the development of assembly roadway No. 816 and cargo transport along haulage roadway No. 818.

Original in Russian.

Basis for the finding: The quotation identifies both prohibited activities. An assembly roadway is a preparatory mine working.

Verification outcome: Type of work and grounds for prohibition.

Scope and further verification: A statement that materials were referred to court is not the text of a court decision.

Comparison: DOC-044 — earlier site visit.

CLM-017. SUEK: the court upheld a fine for NO₂ exceeding the limit by a factor of 2.7 and maximum night-time noise by 1.3 dBA.

Source and location: DOC-038, decision of 17.06.2019, assessment of measurement results.

English translation of the original excerpt: […] exceedance of the average daily maximum permissible concentration of nitrogen dioxide in ambient air in a residential area […] by a factor of 2.7; exceedance of the permissible maximum night-time sound level in a residential house (bedroom) […] by 1.3 dBA.

Original in Russian; address details omitted.

Basis for the finding: The substance, averaging period, noise-measurement location, time of day, figure and unit are preserved.

Source and location: DOC-038, operative part.

English translation of the original excerpt: The Leninsk-Kuznetsky City Court judge’s decision of 15 April 2019 shall remain unchanged, and the appeal by counsel for JSC SUEK-Kuzbass shall be dismissed.

Original in Russian.

Basis for the finding: The appeal outcome concerns the city court’s decision; the regional court ruled on the appeal.

Verification outcome: Residential-environment measurements and a 10,000-rouble fine.

Scope and further verification: Do not attribute the measurements specifically to Ruban mine.

Comparison: JSC SUEK-Kuzbass is named; DOC-044 covers the group.

CLM-018. SDS: Vostochny and Listvyazhnaya are named among sites visited.

Source and location: DOC-020, PDF 4, Site-Assessment Scope.

Document fields or entries: Site-Assessment Scope: SDS-Ugol corporate headquarters; Salek and Vostochnui Mines […]; Chernigovets Mine […]; Listvyazhnaya Mine […].

Basis for the finding: Site addresses omitted. The list is taken from the visit entry, rather than the wider overall scope list.

Source and location: DOC-020, PDF 5, Step 3.

Document fields or entries: Step 3: Site-Assessment — Completed in November 2017.

Basis for the finding: Together, the two entries establish the sites and visit month.

Verification outcome: Connection of specific sites to the November 2017 visit.

Scope and further verification: Other sites in the overall scope were not automatically visited.

Comparison: Yuzhnaya within overall scope; DOC-039.

CLM-019. The SDS group was rated Misses for 2.2 and Partially Meets for 6.9.

Source and location: DOC-020, PDF 6, Overall performance; PDF 10, Annex 2.

Document fields or entries: Overall performance: Below are SDS Ugol’s ratings against the Bettercoal Code. / Principle 2: 2.2 — Misses. / Principle 6: 6.9 — Partially Meets.

Basis for the finding: Columns were checked against the table image, rather than extracted-text order. Ratings concern the group; provision names are reporting violations/grievances and health/safety.

Verification outcome: Two group compliance ratings.

Scope and further verification: Do not allocate to an individual mine without a report identifying findings for each mine.

Comparison: Positive corporate description DOC-048.

CLM-020. The absence of Immediate Resolutions is recorded alongside adverse compliance ratings.

Source and location: DOC-020, PDF 6, Immediate Resolutions.

Original excerpt: There were no immediate resolutions found during the Assessment of Siberian Business Union Coal.

Basis for the finding: This is a separate results entry. The table on the same page contains Misses and Partially Meets; absence of the urgent category does not cancel them.

Verification outcome: Result for a separate urgency category.

Scope and further verification: Does not replace section 2.2 and 6.9 ratings.

Comparison: Ratings key on p. 10.

CLM-021. The SDS plan was agreed in May 2018.

Source and location: DOC-020, PDF 5, Step 4.

Document fields or entries: Step 4: Continuous Improvement Plan — Agreed in May 2018.

Basis for the finding: The row heading shows that the date concerns plan agreement, rather than the site visit.

Verification outcome: Date of group-plan agreement.

Scope and further verification: A Listvyazhnaya-specific item requires the full plan.

Comparison: Monitoring p. 7; profile DOC-011.

CLM-022. On 12 February 2018, Kemerovo District Court suspended development at Yuzhnaya for ten days.

Source and location: DOC-039, ruling of 12.02.2018, operative part.

English translation of the original excerpt: Find the legal entity JSC Chernigovets guilty […] and impose a penalty suspending development of the Transport Working in the Vladimirovsky-II seam at the JSC Chernigovets branch — Yuzhnaya mine, at the address <...>, for 10 (ten) days.

Original in Russian.

Basis for the finding: ‘Transportnaya pech’ is the mine working’s name in the decision. The operation, seam, type of suspended work and duration are retained; the article uses the accessible explanation ‘development of a transport working’.

Verification outcome: Transport working in the Vladimirovsky-II seam; JSC Chernigovets.

Scope and further verification: Not the entire mine or an inclined shaft.

Comparison: SDS overall scope DOC-020.

CLM-023. Taldinskaya Mining Company: both mines visited in November 2018, plan agreed in September 2019.

Source and location: DOC-045, PDF 5, Site-Assessment Scope and Steps 3–4 entries.

Document fields or entries: Site-Assessment Scope: Taldinskaya–Yuzhnaya underground mine; Taldinskaya–Kyrgayskaya underground mine. Step 3: Site-Assessment — Completed in November 2018. Step 4: Continuous Improvement Plan — Agreed in September 2019.

Basis for the finding: Sites, visit and plan are read from different labelled entries in a single table.

Verification outcome: Assessment and plan dates.

Scope and further verification: Group findings do not replace a subsequent inspection of the working.

Comparison: DOC-040.

CLM-024. On 2 November 2020, conveyor-roadway development at Taldinskaya-Yuzhnaya was suspended for seven days.

Source and location: DOC-040, ruling of 02.11.2020, operative part.

English translation of the original excerpt: […] impose an administrative suspension of conveyor roadway No. [redacted] development (from the flank), section No. [redacted], at: Russian Federation, <address>, JSC Shakhtoupravleniye Taldinskoye-Yuzhnoye, for 7 (seven) days.

Original in Russian.

Basis for the finding: Development of a specific working was suspended. Working and section numbers are redacted in the published decision; they are not reconstructed by guesswork.

Verification outcome: Specific work, duration and entity.

Scope and further verification: The company’s statement of remediation is distinguished from implementation verification.

Comparison: DOC-045 — earlier assessment itinerary.

CLM-025. KTK and TalTEK were at an early stage of participation according to the published profiles.

Source and location: DOC-046, Timeline: Jan 2020.

Document fields or entries: Jan 2020. LETTER OF COMMITMENT & ASSESSMENT PLANNING. Signed letter of commitment to work towards meeting the expectations of the Bettercoal Code. Completed questionnaire to allow independent assessors to plan for on-site assessment.

Basis for the finding: The text describes preparation for KTK’s visit, not its completion.

Source and location: DOC-047, Timeline: Feb 2021.

Document fields or entries: Feb 2021. LETTER OF COMMITMENT & ASSESSMENT PLANNING.

Basis for the finding: The same preparatory stage is recorded for Taltek Open Pit Mine Ltd.

Verification outcome: Participation start dates.

Scope and further verification: Do not describe as having completed a site assessment.

Comparison: Inspections DOC-041 and DOC-042.

CLM-026. KTK: the January–February 2021 inspection identified 44 violations and resulted in suspension of danger-zone work.

Source and location: DOC-041, statement of 24.02.2021, inspection findings.

English translation of the original excerpt: Inspection activities identified 44 breaches of mandatory industrial safety requirements.

Original in Russian.

Basis for the finding: The figure concerns the inspection of PJSC Kuzbasskaya Toplivnaya Company’s Karakansky-Yuzhny open-pit mine.

Source and location: DOC-041, same statement, outcome of the referral to court.

English translation of the original excerpt: The court upheld Rostekhnadzor’s Siberian Directorate’s decision and ordered suspension of work in the danger zone at the mining section of the Karakansky-Yuzhny open-pit mine for 60 days.

Original in Russian.

Basis for the finding: The specific danger zone and suspension duration are stated.

Verification outcome: 60-day suspension, specific work.

Scope and further verification: Publication date does not replace the court ruling’s date.

Comparison: DOC-046 — programme stage.

CLM-027. TalTEK: on 30 December 2021, the court suspended work in a danger zone for 90 days.

Source and location: DOC-042, Rostekhnadzor press-service statement on PravoTEK, 12.01.2022; final paragraph.

English translation of the original excerpt: Novokuznetsk District Court […] on 30 December 2021 […] suspended mining work in the danger zone at LLC Razrez TalTEK’s hazardous industrial facility for 90 days.

Original in Russian.

Basis for the finding: The court, date, operation, work type and duration are preserved. The quotation was checked against the saved web-reading record; the full court decision remains requested.

Verification outcome: 23–28 December inspection and danger zone.

Scope and further verification: The full court decision remains requested.

Comparison: DOC-047 — early-stage participation.

CLM-028. The four July 2022 profiles contain 210 items: 65 verified, 54 awaiting verification, 91 open.

Source and location: DOC-010, CIP progress, July 2022.

Document fields or entries: Figures accurate as of: July 2022. Total assessment findings / changes to be implemented: 58. Changes implemented and independently verified: 20. Changes implemented and awaiting on-site verification: 23. Findings Open / changes still to be implemented: 15.

Basis for the finding: KRU: 20 + 23 + 15 = 58. Combined totals of four profiles: 210 / 65 / 54 / 91.

Source and location: DOC-050, CIP progress, July 2022.

Document fields or entries: Figures accurate as of: July 2022. Total assessment findings / changes to be implemented: 40. Changes implemented and independently verified: 17. Changes implemented and awaiting on-site verification: 8. Findings Open / changes still to be implemented: 15.

Basis for the finding: SUEK: 17 + 8 + 15 = 40. Combined totals of four profiles: 210 / 65 / 54 / 91.

Source and location: DOC-011, CIP progress, July 2022.

Document fields or entries: Figures accurate as of: July 2022. Total assessment findings / changes to be implemented: 49. Changes implemented and independently verified: 16. Changes implemented and awaiting on-site verification: 11. Findings Open / changes still to be implemented: 22.

Basis for the finding: SDS-Ugol: 16 + 11 + 22 = 49. Combined totals of four profiles: 210 / 65 / 54 / 91.

Source and location: DOC-051, CIP progress, July 2022.

Document fields or entries: Figures accurate as of: July 2022. Total assessment findings / changes to be implemented: 63. Changes implemented and independently verified: 12. Changes implemented and awaiting on-site verification: 12. Findings Open / changes still to be implemented: 39.

Basis for the finding: Taldinskaya Mining Company: 12 + 12 + 39 = 63. Combined totals of four profiles: 210 / 65 / 54 / 91.

Verification outcome: Sum of manually checked values; formula in the CSV.

Scope and further verification: Items do not equal violations; severity differs between companies.

Comparison: Summation of each status in data.mjs.

CLM-029. The judgment against SDS executives concerns inaction in July–November 2021.

Source and location: DOC-021, prosecution announcement of 25.03.2025, paragraph beginning ‘The court established’.

English translation of the original excerpt: The court established that from July to November 2021, Fedyaev, Alekseev and Yakutov, seeking benefits and advantages for themselves and other shareholders of JSC HC SDS-Ugol, deliberately failed to act and did not take the necessary steps to bring the mine operated by the subsidiary LLC Shakhta Listvyazhnaya into compliance with industrial safety requirements.

Original in Russian.

Basis for the finding: The sentence connects individuals, period, conduct and the mine’s legal entity. The source is the prosecution’s announcement of the court outcome.

Verification outcome: Period described by the prosecution with reference to the court.

Scope and further verification: Do not project these circumstances onto the 2017 assessment.

Comparison: DOC-020; DOC-084 and DOC-085 — subsequent judicial references.

CLM-030. The disaster occurred on 25 November 2021; 51 people died.

Source and location: DOC-089, Emergencies Ministry state report for 2021, PDF 34 / printed 34.

English translation of the original excerpt: On 25.11.2021, a methane explosion occurred in Belovo at LLC Shakhta Listvyazhnaya (JSC HC SDS-Ugol, coal mining). There were 157 casualties (including 51 mine rescuers), of whom 51 died (including 5 mine rescuers) and 106 were injured (including 46 mine rescuers).

Original in Russian.

Basis for the finding: The final state report separately identifies all casualties and deaths. The figure of 51 deaths, including five mine rescuers, is taken from this entry; the judgment announcement DOC-021 says only ‘several dozen’.

Verification outcome: Date and death toll.

Scope and further verification: Causes are analysed using separate technical and judicial materials.

Comparison: DOC-084; DOC-085.

CLM-031. Bettercoal issued a statement on 26 November 2021 and reported contact with SDS.

Source and location: DOC-024, publication of 26.11.2021.

Original excerpt: We are in communication with SDS-Ugol and have shared our sincerest condolences for the families, friends and colleagues of those who have lost their lives. […] We will continue to engage with SDS-Ugol to understand the exact causes of the accident and the actions necessary to prevent such an accident in the future.

Basis for the finding: The first sentence reports contact already made; the second states an intention to continue work. It does not report the outcome of a future review.

Verification outcome: Public response and stated further engagement.

Scope and further verification: The review’s results require its materials.

Comparison: December webinar DOC-056, p. 20.

CLM-032. A webinar of lead assessors on Russian plans took place in December 2021.

Source and location: DOC-056, PDF 20 / printed 38, Helping Bettercoal Members Monitor and Mitigate Risk.

Original excerpt: In December 2021, Bettercoal held a webinar with the independent Lead Assessors, to go through the status updates on the Continuous Improvement Plans for all Bettercoal Russian Producers.

Basis for the finding: The quotation identifies the webinar’s month, participants, subject and Russian scope.

Verification outcome: Event and stated purpose of informing buyers.

Scope and further verification: Minutes and allocation of decisions to mines are requested.

Comparison: Response DOC-024; profile DOC-011.

CLM-033. Engagement with Russian producers was suspended from 28 April 2022.

Source and location: DOC-079, statement dated 28.04.2022; page published 03.05.2022.

Original excerpt: […] we have therefore taken the decision to suspend Bettercoal’s activities in Russia with immediate effect. […] Bettercoal’s third-party assessors will stop reviewing progress of Russian producers and Bettercoal will pause its engagement.

Basis for the finding: The statement date establishes the decision point; the text separately explains the consequences for plan verification.

Verification outcome: Overall programme measure.

Scope and further verification: The July profile date does not prove new verification after suspension.

Comparison: DOC-010, 011, 050, 051.

CLM-034. Uniper visited Kiselyovsk in September 2019 and described mining close to homes.

Source and location: DOC-001, archive of 18.06.2020, paragraph beginning ‘For example’.

Original excerpt: For example, while in Kuzbass in September 2019, as part of a Bettercoal mission, we managed to see the town of Kiselovsk, mentioned by the NGO Ecodefense as one of the most impacted by mining. Even if we stayed there for a very short time, it was sufficient to recognize how close to houses the mining operations are.

Basis for the finding: Two adjacent sentences confirm the timing, visit format, town and Uniper’s own observation.

Verification outcome: Company’s public account of the visit.

Scope and further verification: Delegation members and report recipients are requested.

Comparison: TDI DOC-002; measurement DOC-080.

CLM-035. The distance of 461.98 metres was measured from the nearest foot of the waste-rock dump to the house inspected.

Source and location: DOC-080, complete anonymised report page, 03.07.2019.

English translation of the original excerpt: Inspection on 26.04.2019 of the individual residential house […] and the nearest waste-rock dump established: […] Minimum distance to the footprint of the house inspected: 461.98 m.

Original in Russian; address and coordinates omitted.

Basis for the finding: The linked phrases establish the inspection objects and measurement unit. This is the house inspected, not the author’s flat. Complete public page — appendix A23.

Verification outcome: Subject of measurement and dates: inspection 26.04, report 03.07.2019.

Scope and further verification: This is not the distance to Natalia’s flat.

Comparison: Corporate description of the town DOC-001.

CLM-036. TDI relayed FERN’s reports of intimidation of environmental activists.

Source and location: DOC-002, PDF 4, Emissions controls; reference ix leads to FERN on PDF 7.

Original excerpt: Finally, according to the rights group, FERN, intimidation of local environmental campaigners by coal companies is reportedly prevalent in Kuzbass.

Basis for the finding: The alleged actors, affected group, geography and attribution to FERN are retained. TDI relays a source’s report; it does not acknowledge its own involvement in persecution.

Verification outcome: Provenance of the assertion and its regional scope.

Scope and further verification: Do not turn it into an admission of guilt by the commissioning party.

Comparison: Subsequent individual reports by CPJ and RSF.

CLM-037. Purchasing shares were 35.1%, 29.9%, 22.6%; the first two categories include Latvia.

Source and location: DOC-003, PDF 54 / printed 52, table and footnote 1.

Document fields or entries: Overall coal purchased via direct contract in 2019 by country of origin. Country of origin | % coal purchased. Russia¹ | 35.1. ¹ Includes coal from Latvia.

Basis for the finding: The heading defines the denominator; the footnote changes the geographical scope.

Source and location: DOC-004, PDF 74 / printed 73, table and footnote 1.

Document fields or entries: Coal purchased under direct contracts in 2020 by country of origin. Country of origin | % coal purchased. Russia¹ | 29.9. ¹ Includes coal from Latvia.

Basis for the finding: Only PDF 74 relates to this report.

Source and location: DOC-005, PDF 46 and 93 / printed 46 and 93.

Document fields or entries: Overall coal purchased via direct contract in 2021 by country of origin. Country of origin | % coal purchased. Russia | 22.6%.

Basis for the finding: The PDF 93 table repeats the indicator in the PDF 46 chart. Latvia is not named in this category’s label.

Verification outcome: Values, denominator and change of scope.

Scope and further verification: Not tonnage, profits or a particular mine’s share.

Comparison: Underlying data in purchases.csv.

CLM-038. Uniper reported that Russian purchases ended in August 2022.

Source and location: DOC-006, PDF 41 / printed 37.

Original excerpt: In this context, Uniper has not procured any more coal supplies from Russia since August 2022, which is also in line with Uniper’s voluntary commitment in this regard from the first quarter of 2022.

Basis for the finding: This is the company’s report that purchases actually ended, distinct from earlier statements of intent.

Verification outcome: Month of cessation according to the company’s report.

Scope and further verification: Individual contracts require implementation documents.

Comparison: Earlier years’ shares DOC-003–005.

CLM-039. 94.48% concerns approval of the Supervisory Board’s actions in 2020.

Source and location: DOC-081, PDF 1, TOP 4; headings and results row.

Document fields or entries: Discharge of the members of the Supervisory Board for financial year 2020. TOP 4. Shares for which valid votes were cast: 322,950,342. Yes: 305,116,131; Quota: 94.48%. No: 17,834,211; Quota: 5.52%. Required majority reached.

Basis for the finding: The share is calculated from valid votes on item 4. The resolution concerned the Supervisory Board’s actions, rather than a separate purchasing proposal.

Verification outcome: Subject, meeting date and result.

Scope and further verification: Not a vote specifically to continue Russian purchases.

Comparison: Counterproposal DOC-019.

CLM-040. Fortum’s answer concerns the question about Listvyazhnaya and does not specify years.

Source and location: DOC-052, PDF 16, question 39 and first answer point.

Original excerpt: Did Fortum or Uniper get coal deliveries from this mine? […] Neither Fortum or Uniper has been purchasing coal from this supplier in the past years.

Basis for the finding: ‘This mine’ in the question means Listvyazhnaya. The translation retains the indefinite period ‘in recent years’. ‘This supplier’ cannot automatically be extended to all SDS group transactions.

Source and location: DOC-052, PDF 16, question 39, second answer point.

Original excerpt: Since the supplier in question is also a Bettercoal supplier, the Bettercoal secretariat is engaging with the company to understand the exact causes of the accident and the actions necessary to prevent such an accident in the future.

Basis for the finding: The substantive answer about the secretariat’s stated engagement is retained.

Verification outcome: Answer wording and its temporal uncertainty.

Scope and further verification: Does not establish all purchases from the entire SDS group.

Comparison: Volza DOC-077 has a different scope and requires consignment documents.

CLM-041. On 3 March 2021, CPJ recorded Natalia’s account of the 25 February attack.

Source and location: DOC-026, CPJ, 03.03.2021, paragraph about the evening of 25 February.

Original excerpt: In the evening of February 25, an unidentified hooded man in dark clothes attacked and threatened Zubkova, the chief editor and founder of the independent news website Novosti Kiselyovska, outside her home in southwestern Siberian city of Kiselyovsk, according to news reports and Zubkova, who spoke with CPJ in a phone interview.

Basis for the finding: The source explicitly identifies the information’s provenance: publications and a telephone interview with Natalia. The quotation contains no precise private address.

Verification outcome: Dated interview and the organisation’s public appeal.

Scope and further verification: Other retellings do not become new eyewitnesses.

Comparison: RSF DOC-027, publication of 10 March.

CLM-042. The image featuring fire was published by the Bez Tsenzury blog on 21 August 2020.

Source and location: DOC-032, heading, date and account byline; image within the publication.

English translation of document fields or entries: An ‘attempt on Zubkova’s life’ is being prepared / 21.08.2020 / bezcenxury.

Original in Russian.

Basis for the finding: The date and account are read from the page heading. The fire montage is checked against the image itself in appendix A24; the text excerpt confirms publication details. The account holder’s identity is not established.

Verification outcome: Provenance of the documentary illustration.

Scope and further verification: An account is not an identified individual; the publication is separate from the private threat.

Comparison: DOC-033 and DOC-026.

CLM-043. Natalia’s departure from Russia was reported on 26 April 2021, roughly a week after she left.

Source and location: DOC-028, Sibir.Realii, 26.04.2021, article opening.

English translation of the original excerpt: […] left Russia. Zubkova herself told Sibir.Realii’s editorial team. The journalist declined to say which country she had moved to, but noted that she had done so a week earlier and was not yet planning to seek political asylum.

Original in Russian.

Basis for the finding: The departure information is explicitly attributed to Natalia. ‘A week earlier’ is counted from the 26 April publication; no precise calendar date is added.

Verification outcome: Testimony about the time of departure.

Scope and further verification: Do not infer a precise date; do not publish the current private address.

Comparison: DOC-029 — subsequent closure of the outlet.

CLM-044. Ecodefense’s 2020 report cites Novosti Kiselyovska’s video dated 8 June 2019.

Source and location: DOC-008, PDF 5, note 17; PDF 15, note 75.

English translation of the original excerpt: Kiselyovsk residents seek asylum from the Prime Minister of Canada. YouTube channel Novosti Kiselyovska, 8 June 2019, https://www.youtube.com/watch?v=1Hru0InEvD4.

Basis for the finding: The complete bibliographical entry confirms the outlet, video date and its use in the report. The same link appears in two notes.

Verification outcome: Use of the outlet’s material in the report.

Scope and further verification: The report date does not prove that this precise text was provided before the visit.

Comparison: DOC-001 and request for pre-visit correspondence.

CLM-045. The 2017–2022 balance sheets contain cash balances and total assets less current liabilities.

Source and location: DOC-070, PDF 4, Balance sheet.

Document fields or entries: Balance sheet, 31 December 2017, £. Cash at bank and in hand: 334,450. Total assets less current liabilities: 231,696.

Basis for the finding: The heading, unit and two balance-sheet rows are transcribed; these are balances at a date, not annual revenue.

Source and location: DOC-071, PDF 4, Balance sheet.

Document fields or entries: Balance sheet, 31 December 2018, £. Cash at bank and in hand: 489,895. Total assets less current liabilities: 228,144.

Basis for the finding: The heading, unit and two balance-sheet rows are transcribed; these are balances at a date, not annual revenue.

Source and location: DOC-072, PDF 4, Balance sheet.

Document fields or entries: Balance sheet, 31 December 2019, £. Cash at bank and in hand: 338,480. Total assets less current liabilities: 310,078.

Basis for the finding: The heading, unit and two balance-sheet rows are transcribed; these are balances at a date, not annual revenue.

Source and location: DOC-073, PDF 4, Balance sheet.

Document fields or entries: Balance sheet, 31 December 2020, £. Cash at bank and in hand: 247,423. Total assets less current liabilities: 241,092.

Basis for the finding: The heading, unit and two balance-sheet rows are transcribed; these are balances at a date, not annual revenue.

Source and location: DOC-074, PDF 4, Balance sheet.

Document fields or entries: Balance sheet, 31 December 2021, £. Cash at bank and in hand: 223,482. Total assets less current liabilities: 172,103.

Basis for the finding: The heading, unit and two balance-sheet rows are transcribed; these are balances at a date, not annual revenue.

Source and location: DOC-075, PDF 4, Balance sheet.

Document fields or entries: Balance sheet, 31 December 2022, £. Cash at bank and in hand: 295,022. Total assets less current liabilities: 236,094.

Basis for the finding: The heading, unit and two balance-sheet rows are transcribed; these are balances at a date, not annual revenue.

Verification outcome: Comparable figure at 31 December each year, GBP.

Scope and further verification: A cash balance is not annual income.

Comparison: finance.csv; six original pages.

CLM-046. Expenditure under the 2021 report’s four categories totals GBP 571,000.

Source and location: DOC-056, PDF 22 / printed 42–43, financial table.

Document fields or entries: Secretariat — £395,000; Assessments, CIP Monitoring, Online Platform, Bettercoal Standard — £143,000; Internal Governance — £19,000; Communications — £14,000.

Basis for the finding: Sum of four rows: 395,000 + 143,000 + 19,000 + 14,000 = GBP 571,000. This is calculated from the published expenditure categories.

Verification outcome: 395000 + 143000 + 19000 + 14000.

Scope and further verification: Categories differ from the 2025 structure.

Comparison: expenses.csv.

CLM-047. Expenditure under the five 2025 categories totals GBP 845,890.

Source and location: DOC-083, PDF 12, Finance.

Document fields or entries: RECOSI Costs — £572,950; Internal Governance — £25,279; Bettercoal Programme — £117,637; RECOSI Gas Programme — £80,422; Communications and Stakeholder Engagement — £49,602.

Basis for the finding: The five rows total GBP 845,890. Category names are retained; the gas programme is explicitly included.

Verification outcome: 572950 + 25279 + 117637 + 80422 + 49602.

Scope and further verification: Includes the gas programme; this is not spending solely on Russian coal.

Comparison: expenses.csv; DOC-056 for the different 2021 structure.

CLM-048. As at 31 December 2025, RECOSI’s report lists 279 items: 66 closed, 30 awaiting verification and 183 open.

Source and location: DOC-083, PDF 18, Continuous Improvement Plan progress, key and footnote *.

Document fields or entries: Bettercoal Producers in 2025: Six. Total findings 279. Findings closed — 66. Findings closed pending verification — 30. Findings open — 183. Data reflects information updated by December 31, 2025.

Basis for the finding: Categories were matched to figures using the original chart’s colour key. Total: 66 + 30 + 183 = 279.

Verification outcome: Statuses for six producers; visually checked key.

Scope and further verification: The sample differs from the four Russian profiles of 2022.

Comparison: Full-page image in the appendix. Report published on 17 August 2026 (DOC-087).

CLM-049. The 2025 complaints procedure contains a five-year criterion; November 2021 falls within it on 28 October 2026.

Source and location: DOC-063, PDF 3, Inadmissible Grievances.

Original excerpt: The following grievances will not be accepted as they are not within the scope of the Bettercoal Grievance Mechanism: […] Events on which it is based occurred more than 5 years prior to the complaint.

Basis for the finding: A calendar calculation on 28 October 2026 gives a cut-off of 28 October 2021. November 2021 events still fall within that period.

Verification outcome: Criterion and calendar calculation of the 28.10.2021 cut-off.

Scope and further verification: The organisation decides whether a particular complaint is admissible.

Comparison: Request concerning ongoing consequences and historical events.

CLM-050. Shubarkol Komir’s participation ended in 2019; the 2025 report again describes a site visit.

Source and location: DOC-059, publication of 24.06.2019, first paragraph.

Original excerpt: JSC Shubarkol Komir is no longer a Bettercoal Supplier as of today.

Basis for the finding: ‘Today’ refers to the publication date — 24 June 2019.

Source and location: DOC-083, PDF 17, Welcoming producers.

Original excerpt: Two site assessments took place in 2025: Shubarkol komir in Kazakhstan in Q4 of 2025; and Black Royalty Minerals Koornfontein in South Africa, also in Q4. Both processes are due for completion in 2026.

Basis for the finding: The report describes site visits already conducted and, separately, future completion of the processes. It does not claim completion had occurred.

Verification outcome: Two successive events concerning the named producer.

Scope and further verification: Do not confuse with the different legal entity Shubarkol Premium.

Comparison: The full path to restored status requires decisions.

CLM-051. Uniper seconded an employee to Bettercoal’s secretariat for two years to monitor plans.

Source and location: DOC-088, PDF 24 / printed 24, right column, first paragraph.

Original excerpt: To support Bettercoal’s Secretariat in the assessment program and processes, a Uniper employee has been seconded for a period of two years, supporting the monitoring of the Suppliers’ Continuous Improvement Plans implementation.

Basis for the finding: The sentence establishes the employer, recipient of staff support, duration and task. It does not identify the plans’ geographical scope.

Verification outcome: Staff support according to the 2017/18 report.

Scope and further verification: The document does not identify the employee or specific Russian tasks.

Comparison: DOC-003 — subsequent description of assessment use.

CLM-052. The 2026 court decisions cite the criminal case concerning the Mikon III system.

Source and location: DOC-084, decision of 02.04.2026, paragraphs about the final judgment of 28.05.2024.

English translation of the original excerpt: By a final judgment of Belovo City Court of Kemerovo Region dated 28.05.2024 in criminal case No. [redacted], the chief engineer of LLC Shakhta Listvyazhnaya, ФИО20, was found guilty of an offence under part 5 of article 274.1 of the Russian Criminal Code. During the trial in criminal case No. [redacted], the court established that ФИО20 had breached operating rules for the automated ASU AGK Mikon III control system, part of the Russian Federation’s critical information infrastructure, causing harm to that infrastructure and grave consequences in the form of an accident at a hazardous industrial facility and major property damage to LLC Shakhta Listvyazhnaya, acting as part of an organised group and using his official position.

Original in Russian; the designation ФИО20 is retained as in the published decision.

Basis for the finding: The appellate decision cites a final criminal judgment and recounts the conduct and consequences established in that case. This is more than a mention of the system’s name.

Source and location: DOC-085, decision of 26.03.2026, paragraph beginning ‘During consideration of the criminal case’.

English translation of the original excerpt: During consideration of criminal case No. [redacted], the court established that ФИО22 had breached operating rules for the automated ASU AGK Mikon III control system, part of the Russian Federation’s critical information infrastructure, causing harm to that infrastructure and grave consequences in the form of an accident at a hazardous industrial facility and major property damage to LLC Shakhta Listvyazhnaya, acting as part of an organised group and using his official position.

Original in Russian.

Basis for the finding: The second civil decision recounts the same criminal episode. This is another account of the court outcome, rather than a second independent technical study.

Verification outcome: Judicial account of a separate criminal episode.

Scope and further verification: The full judgment and technical report are needed to analyse all causes.

Comparison: Judgment against executives DOC-021 — a different subject.

CLM-053. Under RECOSI’s 2023 Articles, members have one vote each; associate members and programme participants do not vote.

Source and location: DOC-069, PDF 10, provision 16.1; visual reading of the scan.

Original excerpt: Every Member shall have one vote on each resolution put to the vote at a general meeting, […] Associates and Participants shall have no right to vote at any general meeting.

Basis for the finding: The excerpt confirms specifically the allocation of voting rights. Nomination of directors and appointment of the Chair are analysed separately in chapter 4 under provisions 21 and 23.

Verification outcome: The Articles distinguish voting members, associate members and programme participants.

Scope and further verification: Do not project this edition onto 2017–2022 decisions.

Comparison: DOC-056 — description of governance in 2021; DOC-014 — published Board membership.

CLM-054. SDS’s corporate statement about a positive conclusion is compared with two adverse ratings in Bettercoal’s public report.

Source and location: DOC-048, publication of 20.03.2018, first paragraph.

English translation of the original excerpt: As part of Bettercoal’s assessment process, several JSC HC SDS-Ugol operations […] namely JSC Salek (Vostochny open-pit mine), JSC Chernigovets and LLC Shakhta Listvyazhnaya, underwent audit procedures and received a positive conclusion of compliance with the Bettercoal Code.

Original in Russian.

Basis for the finding: The corporate announcement characterises the outcome as a positive conclusion of compliance.

Source and location: DOC-020, PDF 6, Overall performance; PDF 10, key.

Document fields or entries: SDS Ugol’s ratings against the Bettercoal Code: 2.2 — Misses; 6.9 — Partially Meets.

Basis for the finding: The public report, published after the corporate announcement, discloses incomplete compliance with specific provisions. These are group ratings, not allocated to mines here.

Verification outcome: DOC-048 conveys the company’s public wording; DOC-020 shows Misses for 2.2 and Partially Meets for 6.9. These results must be considered together.

Scope and further verification: Ratings concern the group. Identifying which findings relate to each mine requires the full report and plan.

Comparison: CLM-019 and CLM-020; appendix A3.

CLM-055. Uniper’s Supervisory Board regularly received information on responsible coal sourcing, according to the Dutch Coal Covenant 2017/18 report.

Source and location: DOC-088, PDF 24 / printed 24, External Reporting.

Original excerpt: The company’s Supervisory Board receives updates on Uniper’s responsible coal procurement on a regular basis.

Basis for the finding: The recipient, topic and regularity of information are explicitly named. The contents of individual reports and information on specific violations must be established from those reports themselves.

Verification outcome: The document identifies the recipient and reporting regularity.

Scope and further verification: The materials provided and specific Board decisions require minutes and appendices.

Comparison: CLM-051: seconding an employee to the secretariat is a separate form of participation.

CLM-056. At the verification date, Uniper presents Plümacher as Executive Vice President and Human Rights Officer.

Source and location: DOC-015, Social responsibility page, name-and-role block; checked 28.10.2026.

Document fields or entries: Frank Plümacher / EVP Health, Safety, Security, Environment and Sustainability as well as Human Rights Officer (HRO) at Uniper

Basis for the finding: Name and role appear below the statement on the officer’s duties. The block does not give the appointment start date.

Verification outcome: The company’s official page names both positions beside his name.

Scope and further verification: The Human Rights Officer role’s start date requires an appointment document.

Comparison: CLM-003 and CLM-004: historical Bettercoal appointments.

CLM-057. In December 2025, RECOSI described Wendler as Uniper’s Senior Vice President Sustainability.

Source and location: DOC-013, RECOSI announcement of 03.12.2025, New Board Directors list.

Original excerpt: Nadja Wendler, Senior Vice President Sustainability, Uniper

Basis for the finding: The position appears in the announcement of new directors. The registry date of appointment to the Board is in CLM-005.

Verification outcome: Position and employer named in the new-director list.

Scope and further verification: The precise employment start date at Uniper requires a personnel document.

Comparison: CLM-005 — appointment as director on 27.11.2025; CLM-006 — position in 2024.

15. Sources and document register

A DOC number is retained on updating. Document date and acquisition date differ. SHA-256 verifies the integrity of a saved file, not its authenticity. The files below are in a separate sources archive; acquisition procedures are set out in appendix C. public-sources is a folder inside that archive. SHA-256 refers specifically to the supplied file; extracts and complete originals are identified separately. External links lead to sources; the cadastral link leads to appendix A23. DOC-086 is an alternative address for DOC-021’s announcement, not separate corroboration. Gaps in numbering preserve the original article’s numbering after duplicates were removed.

DOC-001. Uniper. The dilemma of investing in social and environmental remediation activities

Date: May 2020. Used: Archive of 18.06.2020, paragraph beginning ‘For example’; HTML; archived snapshot dated 18 June 2020, 23:01:43 UTC.

https://web.archive.org/web/20200618230143id_/https://cr.uniper.energy/the-dilemma-of-investing-in-social-and-environmental-remediation-activities/

Acquisition: Saved web page. Recorded preservation: 2026-10-28T08:20:34.891Z.

Reviewed: Passages identified in claim card CLM-034.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-001-original.html. Saved source HTML of the public page; bytes unchanged; external resources not included

SHA-256 of supplied file public-sources/DOC-001-original.html: c6dff9ba29ebe4115d0f039b7ded8f93f421183df94369413a0c3d2b1f1ad54c

CLM-034

DOC-002. TDI Sustainability. Environmental and Social Issues and the Coal Industry in Kuzbass, Russian Federation, and Focal Areas for Future Action

Date: February 2020. Used: PDF 4, Emissions controls; reference ix leads to FERN on PDF 7; PDF 2–3: visit; PDF 6–7: recommendations and sources.

https://www.uniper.energy/sites/default/files/2022-03/Bettercoal-in-Kuzbass_Public-Report.pdf

Acquisition: Textual web extraction. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim card CLM-036.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-002-extract.html. Editorial text extract: not the complete original or a page image

SHA-256 of supplied file public-sources/DOC-002-extract.html: a415f970fca7a7f29215a26462d4226edbb36ae0648f248455797c94b2e50abd

CLM-036

DOC-003. Uniper. Sustainability Report 2019

Date: Report for 2019; published in 2020. Used: PDF 54 / printed 52; PDF 63 / printed 61, continuation of the Russia Working Group section; PDF 54 / printed 52, table and footnote 1; printed p. 52 / PDF 54: purchases and Plümacher; printed pp. 60–61 / PDF 62–63: Russia; printed p. 76 / PDF 78: cr.uniper.energy.

https://www.uniper.energy/sites/default/files/2022-03/uniper_sustainability_report_2019_en.pdf

Acquisition: Saved PDF. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-003, CLM-007, CLM-008, CLM-037.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-003.pdf. Original public PDF, bytes preserved unchanged

SHA-256 of supplied file public-sources/DOC-003.pdf: d86923110278966f08438e93710bc2b4041ea971cb0ea4d1be054c554e348519

CLM-003 · CLM-007 · CLM-008 · CLM-037

DOC-004. Uniper. Sustainability Report 2020

Date: Report for 2020. Used: PDF 74 / printed 73, table and footnote 1; printed p. 73 / PDF 74: 29.9%; printed p. 83 / PDF 84: conferences.

https://www.responsibilityreports.com/HostedData/ResponsibilityReportArchive/u/uniper-se_2020.pdf

Acquisition: Saved PDF. Recorded preservation: 2026-10-28T08:27:16.827Z.

Reviewed: Passages identified in claim card CLM-037.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-004.pdf. Original public PDF, bytes preserved unchanged

SHA-256 of supplied file public-sources/DOC-004.pdf: 5449dbae25505b3cd999bf2fd70368ba01e0feec88ecd8e100763e8c2263b1aa

CLM-037

DOC-005. Uniper. Sustainability Report 2021

Date: Report for 2021; published in 2022. Used: PDF 46 and 93 / printed 46 and 93; printed and PDF page numbers: 46, 77, 93.

https://www.responsibilityreports.com/HostedData/ResponsibilityReportArchive/u/uniper-se_2021.pdf

Acquisition: Saved PDF. Recorded preservation: 2026-10-28T08:27:20.880Z.

Reviewed: Passages identified in claim card CLM-037.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-005.pdf. Original public PDF, bytes preserved unchanged

SHA-256 of supplied file public-sources/DOC-005.pdf: 59c06c5e7b30f3b448ba465bebcdffaa9bccc570cb193a32d2a8182a4f368130

CLM-037

DOC-006. Uniper. Annual Report 2022

Date: Report for 2022; published in 2023. Used: PDF 41 / printed 37; printed p. 37 / PDF 41: August 2022; printed p. 118 / PDF 122: purchases within Bettercoal.

https://www.annualreports.com/HostedData/AnnualReportArchive/u/uniper-se_2022.pdf

Acquisition: Saved PDF. Recorded preservation: 2026-10-28T08:28:09.011Z.

Reviewed: Passages identified in claim cards CLM-038.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-006.pdf. Original public PDF, bytes preserved unchanged

SHA-256 of supplied file public-sources/DOC-006.pdf: 57fc5c9a8f7fcaf75ecf554eaf7d3626e7d0d703670861b5f566591bb00f5338

CLM-038

DOC-007. Council of the EU. EU adopts fifth round of sanctions against Russia over its military aggression against Ukraine

Date: 2022-04-08. Used: Ban on coal imports.

https://www.consilium.europa.eu/en/press/press-releases/2022/04/08/eu-adopts-fifth-round-of-sanctions-against-russia-over-its-military-aggression-against-ukraine/

Acquisition: Web reading / link from the baseline article. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Linked material; passages used are identified in the entry.

Preservation of the original: The complete source file is not preserved in the working archive.

Supplied file: File not included. No file is included in the public package; the source is available via the stated link when the website is accessible

DOC-008. Ecodefense! E. Solovyova, V. Slivyak. Race to the Bottom

Date: 2020. Used: PDF 5, note 17; PDF 15, note 75; PDF 5, 15; notes 17, 75.

https://ecodefense.ru/wp-content/uploads/2020/10/race-to-the-bottom1.pdf

Acquisition: Saved PDF. Recorded preservation: 2026-10-28T08:20:41.369Z.

Reviewed: Passages identified in claim cards CLM-044.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-008-extract.html. Editorial text extract: not the complete original or a page image

SHA-256 of supplied file public-sources/DOC-008-extract.html: 150d455ff2c2823a67d635aafa933a7c7153501ca0ddeb2fcba5fe106bfb0890

CLM-044

DOC-009. Dachverband Kritische Aktionärinnen und Aktionäre. Klage gegen die Niederlande, Kohle-Lieferketten und Datteln 4: Unsere Fragen an den Vorstand von Uniper

Date: 2021-05-17. Used: Questions about coal imports from Russia.

https://www.kritischeaktionaere.de/uniper/klage-gegen-die-niederlande-kohle-lieferketten-und-datteln-4-unsere-fragen-an-den-vorstand-von-uniper/

Acquisition: Saved web page. Recorded preservation: 2026-10-28T08:23:56.410Z.

Reviewed: Linked material; passages used are identified in the entry.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: File not included. No file is included in the public package; the source is available via the stated link when the website is accessible

DOC-010. Bettercoal. KRU — improvement-plan progress

Date: July 2022. Used: CIP progress, July 2022; 58 items: 20 verified, 23 awaiting verification, 15 open.

https://www.bettercoal.org/kuzbassrazrezugol-coal-ojsc

Acquisition: Saved web page. Recorded preservation: 2026-10-28T08:28:05.435Z.

Reviewed: Passages identified in claim cards CLM-028.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-010-extract.html. Editorial text extract: not the complete original or a page image

SHA-256 of supplied file public-sources/DOC-010-extract.html: ab134c6b30023b80060479591e99e5c9c9671bd47838e9bc508648f63d15abe9

CLM-028

DOC-011. Bettercoal. Siberian Business Union Coal — CIP progress

Date: Data for July 2022. Used: CIP progress, July 2022; 49 items: 16 verified, 11 awaiting verification, 22 open.

https://www.bettercoal.org/siberian-business-union-coal

Acquisition: Saved web page. Recorded preservation: 2026-10-28T08:28:05.437Z.

Reviewed: Passages identified in claim cards CLM-028.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-011-extract.html. Editorial text extract: not the complete original or a page image

SHA-256 of supplied file public-sources/DOC-011-extract.html: 329459f794ec9d7240e34c394678a329b89c7422e15c838ee2b0453737b049a3

CLM-028

DOC-012. Bettercoal. Bettercoal Producers

Date: Checked on 28 October 2026; suspended since April 2022. Used: Suspension of engagement.

https://www.bettercoal.org/bettercoal-producers

Acquisition: Saved web page. Recorded preservation: 2026-10-28T08:28:05.294Z.

Reviewed: Linked material; passages used are identified in the entry.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: File not included. No file is included in the public package; the source is available via the stated link when the website is accessible

DOC-013. RECOSI. Changes to its Board of Directors

Date: 2025-12-03. Used: RECOSI announcement of 03.12.2025, New Board Directors list; leadership and organisational governance.

https://www.recosi.com/news/recosi-announces-changes-to-its-board-of-directors

Acquisition: Saved web page. Recorded preservation: 2026-10-28T08:27:08.362Z.

Reviewed: Passages identified in claim cards CLM-057.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-013-extract.html. Editorial text extract: not the complete original or a page image

SHA-256 of supplied file public-sources/DOC-013-extract.html: 5d498264c48ad090057ec4e2fde2b413ffff467fbc20fc76186e544995593cfd

CLM-057

DOC-014. RECOSI. Governance

Date: Composition as checked on 28 October 2026. Used: Board of Directors, technical committee and division of responsibilities.

https://www.recosi.com/governance

Acquisition: Saved web page. Recorded preservation: 2026-10-28T08:23:54.414Z.

Reviewed: Linked material; passages used are identified in the entry.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: File not included. No file is included in the public package; the source is available via the stated link when the website is accessible

DOC-015. Uniper. Social responsibility

Date: Checked on 28 October 2026. Used: Social responsibility page, name-and-role block; checked 28.10.2026; leadership and organisational governance.

https://www.uniper.energy/sustainability/people-and-society/social-responsibility

Acquisition: Web reading / link from the baseline article. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-056.

Preservation of the original: The complete source file is not preserved in the working archive.

Supplied file: public-sources/DOC-015-extract.html. Editorial text extract: not the complete original or a page image

SHA-256 of supplied file public-sources/DOC-015-extract.html: c675f043dedf3face8443d5e37b6cbec5d05fc7adc34a319b6f936cecca51080

CLM-056

DOC-016. Bettercoal. Governance

Date: Checked on 28 October 2026. Used: Leadership and organisational governance.

https://www.bettercoal.org/governance

Acquisition: Saved web page. Recorded preservation: 2026-10-28T09:58:57.133Z.

Reviewed: Linked material; passages used are identified in the entry.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: File not included. No file is included in the public package; the source is available via the stated link when the website is accessible

DOC-017. Bettercoal publishes its Annual Report 2018

Date: 2019-05-15. Used: Leadership and organisational governance.

https://www.bettercoal.org/news/bettercoal-publishes-its-annual-report-2018

Acquisition: Saved web page. Recorded preservation: 2026-10-28T09:58:57.348Z.

Reviewed: Linked material; passages used are identified in the entry.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: File not included. No file is included in the public package; the source is available via the stated link when the website is accessible

DOC-018. Bettercoal. Appointment of new Executive Director

Date: 2021-02-17. Used: Leadership and organisational governance.

https://www.bettercoal.org/news/bettercoal-announces-appointment-of-new-executive-director-2

Acquisition: Saved web page. Recorded preservation: 2026-10-28T09:58:57.339Z.

Reviewed: Linked material; passages used are identified in the entry.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: File not included. No file is included in the public package; the source is available via the stated link when the website is accessible

DOC-019. Uniper SE. Gegenanträge und Wahlvorschläge zur Hauptversammlung am 19. Mai 2021

Date: Counterproposal dated 4 May 2021. Used: PDF 3: the association of critical shareholders’ proposal on agenda item 4.

https://www.uniper.energy/sites/default/files/2022-03/Gegenantraege_HV_2021.pdf

Acquisition: Web reading / link from the baseline article. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Linked material; passages used are identified in the entry.

Preservation of the original: The complete source file is not preserved in the working archive.

Supplied file: File not included. No file is included in the public package; the source is available via the stated link when the website is accessible

DOC-020. Bettercoal Assessment Public Report: Siberian Business Union Coal

Date: 2019-01-09. Used: PDF 4, Site-Assessment Scope; PDF 5, Step 3; PDF 6, Overall performance; PDF 10, Annex 2; PDF 6, Immediate Resolutions; PDF 5, Step 4; PDF 6, Overall performance; PDF 10, key; PDF 1: date; 4–5: sites and stages; 6: ratings and the Immediate Resolutions category; 10: ratings key.

https://static1.squarespace.com/static/616d4f4a45c4cd5a0ed1a30d/t/62e194340e16f031d1ea08f5/1658950708972/Bettercoal-Public-Report-Siberian-Business-Union-Coal.pdf

Acquisition: Saved PDF. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-018, CLM-019, CLM-020, CLM-021, CLM-054.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-020.pdf. Original public PDF, bytes preserved unchanged

SHA-256 of supplied file public-sources/DOC-020.pdf: 26e6ff8db1abd182ca173f55738fe4eb4bebdca4921818237f3cf9fd4918a6c3

CLM-018 · CLM-019 · CLM-020 · CLM-021 · CLM-054

DOC-021. Prosecutor General’s Office: judgment against SDS-Ugol executives

Date: 2025-03-25. Used: Prosecution announcement of 25.03.2025, paragraph beginning ‘The court established’; official announcement of the judgment.

https://epp.genproc.gov.ru/ru/gprf/mass-media/news/main/e5606112/

Acquisition: Saved web page. Recorded preservation: 2026-10-28T12:11:10.387Z.

Reviewed: Passages identified in claim cards CLM-029.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-021-extract.html. Editorial text extract: not the complete original or a page image

SHA-256 of supplied file public-sources/DOC-021-extract.html: 6e37b4925d939470a0acfafee23d52568c962ab490e34b1a204a84ccca07066e

CLM-029

DOC-022. Interfax: judgment became final, no appeals lodged

Date: 2025-04-21. Used: Report citing the courts’ press centre.

https://www.interfax-russia.ru/siberia/news/osuzhdennye-po-delu-o-tragedii-na-shahte-listvyazhnaya-ne-stali-obzhalovat-prigovor

Acquisition: Saved web page. Recorded preservation: 2026-10-28T12:11:08.952Z.

Reviewed: Linked material; passages used are identified in the entry.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: File not included. No file is included in the public package; the source is available via the stated link when the website is accessible

DOC-023. Kommersant: Failure to act results in sentences

Date: 2025-03-25. Used: Report on the trial; the defence’s position.

https://www.kommersant.ru/doc/7604419

Acquisition: Saved web page. Recorded preservation: 2026-10-28T12:11:09.379Z.

Reviewed: Linked material; passages used are identified in the entry.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: File not included. No file is included in the public package; the source is available via the stated link when the website is accessible

DOC-024. Bettercoal: Accident at SDS-Ugol mine

Date: 2021-11-26. Used: Publication of 26.11.2021; public response.

https://www.bettercoal.org/news/accident-at-sds-ugol-mine

Acquisition: Saved web page. Recorded preservation: 2026-10-28T08:28:05.740Z.

Reviewed: Passages identified in claim cards CLM-031.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-024-extract.html. Editorial text extract: not the complete original or a page image

SHA-256 of supplied file public-sources/DOC-024-extract.html: 0769f4195fccf059d5ec0a17bdac8e04f0462611cd7cc8ed97a860d96e19df06

CLM-031

DOC-025. Sibir.Realii: mayor reports editor to prosecutors over interviews

Date: 2019-08-26. Used: Letter and interview.

https://www.sibreal.org/a/30129098.html

Acquisition: Saved web page. Recorded preservation: 2026-10-28T12:11:09.370Z.

Reviewed: Linked material; passages used are identified in the entry.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: File not included. No file is included in the public package; the source is available via the stated link when the website is accessible

DOC-026. CPJ: Russian journalist Natalia Zubkova in hiding following attack, death threats

Date: 2021-03-03. Used: CPJ, 03.03.2021, paragraph about the evening of 25 February; telephone interview; information gathered by the article’s author; requests for comment.

https://cpj.org/2021/03/russian-journalist-natalia-zubkova-in-hiding-following-attack-death-threats/

Acquisition: Saved web page. Recorded preservation: 2026-10-28T08:27:08.689Z.

Reviewed: Passages identified in claim cards CLM-041.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-026-extract.html. Editorial text extract: not the complete original or a page image

SHA-256 of supplied file public-sources/DOC-026-extract.html: 5b8ce1eb53e422b414d1f737f78ccdba1fc6f1540ab91a85e0c526d4af6908d9

CLM-041

DOC-027. RSF: Journalist forced to flee Siberian hometown after years of harassment

Date: 2021-03-10. Used: Report on events and a statement in defence of the journalist.

https://rsf.org/en/journalist-forced-flee-siberian-hometown-after-years-harassment

Acquisition: Saved web page. Recorded preservation: 2026-10-28T12:11:09.378Z.

Reviewed: Linked material; passages used are identified in the entry.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: File not included. No file is included in the public package; the source is available via the stated link when the website is accessible

DOC-028. Sibir.Realii: journalist from Kiselyovsk leaves Russia

Date: 2021-04-26. Used: Sibir.Realii, 26.04.2021, article opening; direct interview.

https://www.sibreal.org/a/31223397.html

Acquisition: Saved web page. Recorded preservation: 2026-10-28T12:11:09.370Z.

Reviewed: Passages identified in claim cards CLM-043.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-028-extract.html. Editorial text extract: not the complete original or a page image

SHA-256 of supplied file public-sources/DOC-028-extract.html: bc43565572a4a1dec9ce86490ba66b5ec8dd8685f60a8e9bf18f37f76ea51391

CLM-043

DOC-029. Radio Liberty: independent media outlet closed for editor’s safety

Date: 2021-05-23. Used: Report on the closure.

https://www.svoboda.org/a/31269102.html

Acquisition: Saved web page. Recorded preservation: 2026-10-28T12:11:08.931Z.

Reviewed: Linked material; passages used are identified in the entry.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: File not included. No file is included in the public package; the source is available via the stated link when the website is accessible

DOC-030. Black Snow: press kit; Alina Simone

Date: 2024. Used: PDF 4: the director’s account; the film has not been viewed.

https://cineeco.pt/wp-content/uploads/2025/08/BLACK-SNOW-PRESS-KIT-2024.pdf

Acquisition: Saved PDF. Recorded preservation: 2026-10-28T12:11:09.357Z.

Reviewed: Linked material; passages used are identified in the entry.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: File not included. No file is included in the public package; the source is available via the stated link when the website is accessible

DOC-031. Uniper: Update on Uniper’s Russian activities and way forward

Date: 2022-03-07. Used: Coal supply contracts and diversification of suppliers.

https://www.uniper.energy/news/update-on-unipers-russian-activities-and-way-forward

Acquisition: Web reading / link from the baseline article. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Linked material; passages used are identified in the entry.

Preservation of the original: The complete source file is not preserved in the working archive.

Supplied file: File not included. No file is included in the public package; the source is available via the stated link when the website is accessible

DOC-032. Bez Tsenzury. An ‘attempt on Zubkova’s life’ is being prepared

Date: 21 August 2020. Used: Heading, date and account byline; image within the publication; original WordPress publication; account BEZCENXURY. The author’s identity has not been established.

https://bezcenxury.wordpress.com/2020/08/21/%d0%bd%d0%b0-%d0%b7%d1%83%d0%b1%d0%ba%d0%be%d0%b2%d1%83-%d0%b3%d0%be%d1%82%d0%be%d0%b2%d0%b8%d1%82%d1%81%d1%8f-%d0%bf%d0%be%d0%ba%d1%83%d1%88%d0%b5%d0%bd%d0%b8%d0%b5/

Acquisition: Saved web page. Recorded preservation: 2026-10-28T19:34:05.038Z.

Reviewed: Passages identified in claim cards CLM-042.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-032-extract.html. Editorial text extract: not the complete original or a page image

SHA-256 of supplied file public-sources/DOC-032-extract.html: 0e1763fef2c7c0f94e7deaf0cb2e2df3b20d6c9be3af5e3144ae4213fbd03bc1

CLM-042

DOC-033. Natalya Zubkova. Two Realities

Date: Archive of material from 2019–2021. Used: Episode 08; archive A-15 — publication featuring the photomontage, A-67 — messages dated 17 August 2020.

https://nataliazubkova.com/ru/work/propaganda-dezinformatsiya-rossiya-dve-realnosti/#threat-title

Acquisition: Saved web page. Recorded preservation: 2026-10-28T19:34:06.335Z.

Reviewed: Linked material; passages used are identified in the entry.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: File not included. No file is included in the public package; the source is available via the stated link when the website is accessible

DOC-034. Rostekhnadzor: results of the KRU inspection, republished by Vesti Promyshlennoy Bezopasnosti

Date: 14 May 2019. Used: Statement of 14.05.2019, paragraphs on findings and suspensions; same statement, following paragraph; 70 hazardous industrial facilities; work restrictions at Bachatsky and Krasnobrodsky open-pit mines.

https://vestipb.ru/indnews8492.html

Acquisition: Saved web page. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-012.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-034-extract.html. Editorial text extract: not the complete original or a page image

SHA-256 of supplied file public-sources/DOC-034-extract.html: 1540149e6621d4241452fdef5768146fc794a8911a14b806b4a7b857e7ea6d7f

CLM-012

DOC-035. Arbitrazh Court of the West Siberian District. Case А27-110/2019

Date: 20 November 2019. Used: Ruling of 20.11.2019, account of the order; reasoning section; ruling Ф04-5045/2019; full text in the Kontur legal database.

https://www.kontur-extern.ru/info/normativ/document/7/349076-postanovlenie-arbitrazhnogo-suda-zso-ot-20-11-2019-n-f04-5045-2019-po-delu-n-a27-110-2019

Acquisition: Saved web page. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-013.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-035-extract.html. Editorial text extract: not the complete original or a page image

SHA-256 of supplied file public-sources/DOC-035-extract.html: aaf53924248ea58d91435199597ef3b63021519a490c0b51fa35934e85b54a24

CLM-013

DOC-036. Belovo District Court. Case 12-71/2019

Date: 27 June 2019 — date in the text. Used: Operative part of the decision of 27.06.2019; decision of 13 May 2019 overturned; copy of the court decision on Sudact.

https://sudact.ru/regular/doc/RHG0J3PWI1LQ/?page=8

Acquisition: Saved web page. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-014.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-036-extract.html. Editorial text extract: not the complete original or a page image

SHA-256 of supplied file public-sources/DOC-036-extract.html: 54785f59058d505559c008006cf9e0df4cb0d26779ea2d7fb43d7b40bfdd5c5b

CLM-014

DOC-037. Rostekhnadzor: violations at the A. D. Ruban mine

Date: 25 February 2020. Used: Publication of 25.02.2020, paragraph on the official record; Rostekhnadzor statement published by the Union of Industrial and Environmental Safety Specialists (SSPEB).

https://www.uhsep.com/article/Technology/1625/

Acquisition: Saved web page. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-016.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-037-extract.html. Editorial text extract: not the complete original or a page image

SHA-256 of supplied file public-sources/DOC-037-extract.html: 13d83ac728d5c46df1bf75a264111d1489761e308c24f347a4bb3ddc52258be6

CLM-016

DOC-038. Kemerovo Regional Court. Decision in case No. 12-328/2019

Date: 17 June 2019 — date within the decision. Used: Decision of 17.06.2019, assessment of measurement results; operative part; appeal against the Leninsk-Kuznetsky City Court decision of 15 April 2019. Copy on Sudact; the date in the aggregator’s heading differs from the text.

https://sudact.ru/regular/doc/v8NLvIFzOab/

Acquisition: Saved web page. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-017.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-038-extract.html. Editorial text extract: not the complete original or a page image

SHA-256 of supplied file public-sources/DOC-038-extract.html: f3ec4704fcf66cc92e6f227022b20dc532b6c0d6863942195e637c3de2908ed6

CLM-017

DOC-039. Kemerovo District Court. Ruling in case No. 5-50/2018

Date: 12 February 2018 — date within the ruling. Used: Ruling of 12.02.2018, operative part; JSC Chernigovets’ Yuzhnaya mine: suspension of transport-working development. Copy on Sudact; the aggregator heading’s date is incorrect.

https://sudact.ru/regular/doc/LBJEAop5D7YP/

Acquisition: Saved web page. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-022.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-039-extract.html. Editorial text extract: not the complete original or a page image

SHA-256 of supplied file public-sources/DOC-039-extract.html: 2d81dbdbfc9c36254ee9add11ac4b0452e6cf1ac8586a1e2ba2822e438591b06

CLM-022

DOC-040. Prokopyevsk District Court. Case 5-142/2020

Date: 2 November 2020 — date within the ruling. Used: Ruling of 02.11.2020, operative part; Taldinskaya-Yuzhnaya mine; the database heading gives 1 November.

https://sudact.ru/regular/doc/b1riSoDaW0LJ/

Acquisition: Saved web page. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-024.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-040-extract.html. Editorial text extract: not the complete original or a page image

SHA-256 of supplied file public-sources/DOC-040-extract.html: cbbbf85a26f30c4f5163744436c1fe46f0b8571a698c451ac7dca14123be6c0f

CLM-024

DOC-041. Rostekhnadzor: Karakansky-Yuzhny open-pit mine

Date: 24 February 2021. Used: Statement of 24.02.2021, inspection findings; same statement, outcome of the court referral; Rostekhnadzor statement published by the Union of Industrial and Environmental Safety Specialists (SSPEB).

https://www.uhsep.com/article/Technology/4911/

Acquisition: Saved web page. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-026.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-041-extract.html. Editorial text extract: not the complete original or a page image

SHA-256 of supplied file public-sources/DOC-041-extract.html: 769f5f31fd06fb08f86e78206e05438fc77dfb9ca135bdd5c15fd699164bf9e2

CLM-026

DOC-042. Rostekhnadzor: work suspended at LLC Razrez TalTEK

Date: 12 January 2022. Used: Rostekhnadzor press-service statement on PravoTEK, 12.01.2022; final paragraph; regulator’s press-service statement published by PravoTEK.

https://www.lawtek.ru/news/119276/sud_po_trebovaniyu_rostekhnadzora_priostanovil_vedeniye_gornykh_rabot_v_opasnoy_zone_ooo_razrez_taltek

Acquisition: Web reading / link from the baseline article. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-027.

Preservation of the original: The complete source file is not preserved in the working archive.

Supplied file: public-sources/DOC-042-extract.html. Editorial text extract: not the complete original or a page image

SHA-256 of supplied file public-sources/DOC-042-extract.html: 7c6d4dd324f47b3f768f690b586dc0db164fed742e910999664833952834c8e4

CLM-027

DOC-043. Bettercoal. Public Report: Kuzbassrazrezugol Coal Company OJSC

Date: Historical public report. Used: PDF 5, footnote to Step 1; PDF 5, Site-Assessment Scope; PDF 5: sites and dates; PDF 9–10: good practices and findings.

https://www.bettercoal.org/s/Bettercoal-Public-Report-Kuzbassrazrezugol-Coal-Company-OJSC.pdf

Acquisition: Saved PDF. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-010, CLM-011.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-043.pdf. Original public PDF, bytes preserved unchanged

SHA-256 of supplied file public-sources/DOC-043.pdf: 7618faccff0e270e62c02b2a0548e04bbd389e331b7f9f50ce767d908dd00d65

CLM-010 · CLM-011

DOC-044. Bettercoal. Public Report: SUEK

Date: 31 January 2020. Used: PDF 5, Site-Assessment Scope; PDF 6, Step 3; PDF 5–6: scope and dates; PDF 9: areas for improvement.

https://www.bettercoal.org/s/Bettercoal-Public-Report-SUE_EN-z5np.pdf

Acquisition: Saved PDF. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-015.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-044.pdf. Original public PDF, bytes preserved unchanged

SHA-256 of supplied file public-sources/DOC-044.pdf: 3d276b71eb9a66c46b26ba279a7c5d4b834674b8c93b1b9d3d6f36b75fe4644f

CLM-015

DOC-045. Bettercoal. Public Report: Taldinskaya Mining Company

Date: Historical public report. Used: PDF 5, footnote to Step 1; PDF 5, Site-Assessment Scope and Steps 3–4 entries; PDF 5–9: two mines, assessors, dates and findings.

https://www.bettercoal.org/s/Bettercoal-Public-Report_Taldinskaya-Mining-Company_English-xacf.pdf

Acquisition: Saved PDF. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-010, CLM-023.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-045.pdf. Original public PDF, bytes preserved unchanged

SHA-256 of supplied file public-sources/DOC-045.pdf: a0c6bdd81f124c6220347ba76723289483af53eb47de11f6beb49d3310ae9b23

CLM-010 · CLM-023

DOC-046. Bettercoal. Kuzbasskaya Toplivnaya Company (KTK)

Date: Historical profile. Used: Timeline: Jan 2020; early-stage participation from January 2020.

https://www.bettercoal.org/ktk

Acquisition: Saved web page. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-025.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-046-extract.html. Editorial text extract: not the complete original or a page image

SHA-256 of supplied file public-sources/DOC-046-extract.html: ee485fa9b6a57add5881841e5fbbe2bc22bff36d82a62bc237d134291964ff17

CLM-025

DOC-047. Bettercoal. Taltek Group

Date: Historical profile. Used: Timeline: Feb 2021; early-stage participation from February 2021.

https://www.bettercoal.org/taltek-open-pit-mine-ltd

Acquisition: Saved web page. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-025.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-047-extract.html. Editorial text extract: not the complete original or a page image

SHA-256 of supplied file public-sources/DOC-047-extract.html: 6be45d5595afa4e585f9a4202057ecf6e019f249bba416906d621cdc60c47134

CLM-025

DOC-048. SDS-Ugol Holding Company becomes a partner of the international association Bettercoal

Date: 20 March 2018. Used: Publication of 20.03.2018, first paragraph; Rudmet, based on SDS-Ugol Holding Company material: the company’s assessment of results and a list of required improvements.

https://rudmet.net/news/8528/

Acquisition: Saved web page. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-054.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-048-extract.html. Editorial text extract: not the complete original or a page image

SHA-256 of supplied file public-sources/DOC-048-extract.html: 94cc8e07ca5fa4a74f77e467f4fb77370431712d8911e685ecf919f9cdb4426e

CLM-054

DOC-050. Bettercoal. SUEK — improvement-plan progress

Date: July 2022. Used: CIP progress, July 2022; 40 items: 17 verified, 8 awaiting verification, 15 open.

https://www.bettercoal.org/suek-jsc

Acquisition: Saved web page. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-028.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-050-extract.html. Editorial text extract: not the complete original or a page image

SHA-256 of supplied file public-sources/DOC-050-extract.html: d6f0c7e03143c346867969c597e8e6640821f6168ac65066916ced0c12f5cc6a

CLM-028

DOC-051. Bettercoal. Taldinskaya Mining Company — improvement-plan progress

Date: July 2022. Used: CIP progress, July 2022; 63 items: 12 verified, 12 awaiting verification, 39 open.

https://www.bettercoal.org/taldinskaya-mining-company-llc

Acquisition: Saved web page. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-028.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-051-extract.html. Editorial text extract: not the complete original or a page image

SHA-256 of supplied file public-sources/DOC-051-extract.html: 447157ffc8aa162f3eaac746e147976f0e554d47d491070b682b8090f4d545f2

CLM-028

DOC-052. Fortum. Answers to shareholders’ advance questions

Date: 2022. Used: PDF 16, question 39 and first answer point; PDF 16, question 39, second answer point; PDF 16, question 39: answer on purchases following the question about Listvyazhnaya.

https://www.fortum.com/sites/default/files/investor-documents/vastauksia_osakkeenomistajien_ennakkokysymyksiin_fortumin_yhtiokokous_2022.pdf

Acquisition: Saved PDF. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-040.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-052.pdf. Original public PDF, bytes preserved unchanged

SHA-256 of supplied file public-sources/DOC-052.pdf: 5869daa36125bb225986b1690679c02b990f89eabe26fd4bebbc80d31fe991a2

CLM-040

DOC-053. Bettercoal Code, version 1.1

Date: Approved 28 June 2017; July 2018 edition. Used: PDF 7 / printed 6, section IV. Status and Effective date; PDF 7: version history; PDF 12–32: requirements. Printed pagination is one lower than PDF pagination.

https://www.bettercoal.org/s/resource-bettercoal-code-1.1-english

Acquisition: Saved PDF. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-009.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-053.pdf. Original public PDF, bytes preserved unchanged

SHA-256 of supplied file public-sources/DOC-053.pdf: 80d7d26f2044492c905a8a871f619fa42dfc7e3ae7c2279f25d76c47bc3250e3

CLM-009

DOC-054. Bettercoal. Claims and Logo Use Guide

Date: 2023. Used: Rules on participation claims and logo use.

https://www.bettercoal.org/s/Bettercoal-Claims-and-Logo-Use-Guide_2023.pdf

Acquisition: Saved PDF. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Linked material; passages used are identified in the entry.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-054.pdf. Original public PDF, bytes preserved unchanged

SHA-256 of supplied file public-sources/DOC-054.pdf: d1d160540d10810ad5c6cf208c8de1203ea0e8b3e6bb7cab800dd0cb3c8e3be1

DOC-055. Companies House. Responsible Commodities Sourcing Initiative Ltd

Date: Register checked on 28 October 2026. Used: Company overview; Previous company names; No. 07968009; incorporation and former name Bettercoal.

https://find-and-update.company-information.service.gov.uk/company/07968009

Acquisition: Saved web page. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-001.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-055-extract.html. Editorial text extract: not the complete original or a page image

SHA-256 of supplied file public-sources/DOC-055-extract.html: 1a769c5a37b8060801a91d0cbe425c2bc107bf485afb372415f7ca6282f8bee1

CLM-001

DOC-056. Bettercoal Annual Report 2021

Date: Published 28 July 2022. Used: PDF 20 / printed 38, Helping Bettercoal Members Monitor and Mitigate Risk; PDF 22 / printed 42–43, financial table; PDF 3–4: remote work; PDF 12–13: governance; PDF 20: Russia; PDF 22: finances. Two-page spreads, with two printed pages per PDF page.

https://www.bettercoal.org/s/Bettercoal-Annual-Report-2021.pdf

Acquisition: Saved PDF. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-032, CLM-046.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-056.pdf. Original public PDF, bytes preserved unchanged

SHA-256 of supplied file public-sources/DOC-056.pdf: 34890ee55d340862c5c89a37893661b4d4ed625bf748e4f5fd48f49f4b2d3f4c

CLM-032 · CLM-046

DOC-058. EGYPES 2024. Post Show Report

Date: 2024. Used: PDF 15 / printed 26–27, attribution beneath the statement; PDF 15 / printed pp. 26–27: Nadja Wendler, Wintershall Dea and her statement.

https://www.egypes.com/media/v1oboqgi/psr_egypes-2024_24-apr-2024.pdf

Acquisition: Saved PDF. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-006.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-058.pdf. Original public PDF, bytes preserved unchanged

SHA-256 of supplied file public-sources/DOC-058.pdf: 54e40b3b2e0e54ac6c3a71ec98c8f0e063305e323ed3dc063e5cef992b4b3c77

CLM-006

DOC-059. Bettercoal. JSC Shubarkol Komir is no longer a Bettercoal Supplier

Date: 24 June 2019. Used: Publication of 24.06.2019, first paragraph; application of the Policy of Association because of an inability to implement the improvement plan.

https://www.bettercoal.org/news/jsc-shubarkol-komir-is-no-longer-a-bettercoal-supplier

Acquisition: Saved web page. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-050.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-059-extract.html. Editorial text extract: not the complete original or a page image

SHA-256 of supplied file public-sources/DOC-059-extract.html: 3f1d325c5d23b08e7c10faaed2432221f2d08b7d45666b43b7b1825f0499de76

CLM-050

DOC-060. RECOSI Annual Report 2024

Date: Report for 2024. Used: PDF 11: funding; PDF 14–16: programme results.

https://static1.squarespace.com/static/65a1303a13bfdc12f7331a58/t/68de9211aecd0116c683a395/1759416849822/RECOSI%2BAnnual%2BReport%2B2024.pdf

Acquisition: Saved PDF. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Linked material; passages used are identified in the entry.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-060.pdf. Original public PDF, bytes preserved unchanged

SHA-256 of supplied file public-sources/DOC-060.pdf: b33a228957495ed6f079b496d828317d57c739794e31c3b2046df4c12ecf01f8

DOC-061. Bettercoal Assessment Manual, version 2.0

Date: 1 January 2024. Used: PDF 11: payment; PDF 19–21: interviews; PDF 26–33: assessment, monitoring and confidentiality.

https://www.bettercoal.org/s/Bettercoal-Assessment-Manual_v2-wwdh.pdf

Acquisition: Saved PDF. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Linked material; passages used are identified in the entry.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-061.pdf. Original public PDF, bytes preserved unchanged

SHA-256 of supplied file public-sources/DOC-061.pdf: 6e2f55c6b63fbe1cf7f73aea51d37f4ed6356d1ec1f12da8822322e4c0c09e24

DOC-062. Bettercoal Policy of Association, version 2, revision 1

Date: 23 April 2025. Used: PDF 3–6: participation conditions, deadline extensions and disengagement.

https://www.bettercoal.org/s/Bettercoal-Policy-of-Association-v2.pdf

Acquisition: Saved PDF. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Linked material; passages used are identified in the entry.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-062.pdf. Original public PDF, bytes preserved unchanged

SHA-256 of supplied file public-sources/DOC-062.pdf: 4104397b8c6546effc0d482171b88718c7034603d59994d88bea7cd06951e2ca

DOC-063. Bettercoal Grievance Mechanism, version 6

Date: 19 June 2025. Used: PDF 3, Inadmissible Grievances; PDF 3–6: admissibility, identity protection, deadlines and appeals.

https://www.bettercoal.org/s/Bettercoal-Grievance-Mechanism-2025-msa8.pdf

Acquisition: Saved PDF. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-049.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-063.pdf. Original public PDF, bytes preserved unchanged

SHA-256 of supplied file public-sources/DOC-063.pdf: 0a5dcb56f341c3152b88f39d1c14cae4fb7175e6b668cc044b2ad0974d65da13

CLM-049

DOC-064. Bettercoal Lead Assessor Allocation Procedures, version 2

Date: October 2025. Used: PDF 7–9: assessor selection, conflicts of interest and payments.

https://www.bettercoal.org/s/Bettercoal-Lead-Assessor-Allocation-Procedures_v2_2025.pdf

Acquisition: Saved PDF. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Linked material; passages used are identified in the entry.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-064.pdf. Original public PDF, bytes preserved unchanged

SHA-256 of supplied file public-sources/DOC-064.pdf: c1a83d069441f26f4e1d146914840bb446b0151e8a819f24a4b436c1aa2a0ec7

DOC-065. Bettercoal Code 2.0

Date: March 2021. Used: Later Code edition; not applied retrospectively in the article to the 2017–2018 site visits.

https://www.bettercoal.org/s/BettercoalCode20-English.pdf

Acquisition: Saved PDF. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Linked material; passages used are identified in the entry.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-065.pdf. Original public PDF, bytes preserved unchanged

SHA-256 of supplied file public-sources/DOC-065.pdf: 7bfd9a05506f67a5a600f7d3dd6bf76f09b90ed0cdb501ef3395d44b1ce62169

DOC-066. Bettercoal. Founding press release

Date: 18 April 2012. Used: PDF 1, paragraph after the opening statement; PDF 1–2: seven founders, the first company to join, the Chair and BSR’s support.

https://public.euracoal.eu/download/Public-Archive/Library/Press-Releases/Bettercoal_press_release_final_18042012.pdf

Acquisition: Saved PDF. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-002.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-066.pdf. Original public PDF, bytes preserved unchanged

SHA-256 of supplied file public-sources/DOC-066.pdf: 45f4aa2639376d9173c349621d8d102cebf0d7784e69036d7a95d4fb0ca33fbc

CLM-002

DOC-067. Companies House. Appointment of Nadja Wendler as a RECOSI director

Date: Appointment 27 November 2025; filed 19 December 2025. Used: PDF 1, form AP01; AP01, PDF 1.

https://find-and-update.company-information.service.gov.uk/company/07968009/filing-history/MzQ5NTQwMDkxMmFkaXF6a2N4/document?format=pdf&download=0

Acquisition: Saved PDF. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-005.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-067-extract.html. Editorial text extract: not the complete original or a page image

SHA-256 of supplied file public-sources/DOC-067-extract.html: f3ee249a3aa1c4be9f106f1c3727b148a1aa828dc1135ab713bcd6f16575f92d

CLM-005

DOC-068. Companies House. Termination of Frank Plümacher’s directorship

Date: 27 November 2025; filed 15 December 2025. Used: PDF 1, form TM01; TM01, PDF 1.

https://find-and-update.company-information.service.gov.uk/company/07968009/filing-history/MzQ5Mzk5OTA1M2FkaXF6a2N4/document?format=pdf&download=0

Acquisition: Saved PDF. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-004.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-068.pdf. Original public PDF, bytes preserved unchanged

SHA-256 of supplied file public-sources/DOC-068.pdf: 7f58956a2002efd549c27a42fc3d5e4727181b2dbd669cab98c65d5eeb345d88

CLM-004

DOC-069. RECOSI. Articles of Association

Date: Filed 13 December 2023. Used: PDF 10, provision 16.1; visual reading of the scan; constitutional document at Companies House.

https://find-and-update.company-information.service.gov.uk/company/07968009/filing-history/MzQwMzM2MTEyNmFkaXF6a2N4/document?format=pdf&download=0

Acquisition: Saved PDF. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-053.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-069.pdf. Original public PDF, bytes preserved unchanged

SHA-256 of supplied file public-sources/DOC-069.pdf: e0d9201ebb3ab5bbd4c0d62e1b2f0cd1b189ad94a58d01f2caa41d9eb3d9664b

CLM-053

DOC-070. Bettercoal. Financial Statements 2017

Date: 31 December 2017. Used: PDF 4, Balance sheet; PDF 4: balance sheet; PDF 6: members and guarantee.

https://find-and-update.company-information.service.gov.uk/company/07968009/filing-history/MzIxMjAyNzQ0MmFkaXF6a2N4/document?format=pdf&download=0

Acquisition: Saved PDF. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-045.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-070.pdf. Original public PDF, bytes preserved unchanged

SHA-256 of supplied file public-sources/DOC-070.pdf: 9cc9d850180942215c8f9447e4bb128cbabf9be8cd82d1a79bcf4c0e733a9603

CLM-045

DOC-071. Bettercoal. Financial Statements 2018

Date: 31 December 2018. Used: PDF 4, Balance sheet; PDF 4: abridged balance sheet, no Income Statement in the filed set.

https://find-and-update.company-information.service.gov.uk/company/07968009/filing-history/MzIzODM0ODk1MWFkaXF6a2N4/document?format=pdf&download=0

Acquisition: Saved PDF. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-045.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-071.pdf. Original public PDF, bytes preserved unchanged

SHA-256 of supplied file public-sources/DOC-071.pdf: dfe4f5498bbc85c4b908f3af89eed06251f81a1de85919a3c99d8677d8ad91b7

CLM-045

DOC-072. Bettercoal. Financial Statements 2019

Date: 31 December 2019. Used: PDF 4, Balance sheet; PDF 4: balance sheet, approval 30 June 2020, signature on behalf of the Board — F. Pluemacher.

https://find-and-update.company-information.service.gov.uk/company/07968009/filing-history/MzI3MzY3MDIzMWFkaXF6a2N4/document?format=pdf&download=0

Acquisition: Saved PDF. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-045.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-072.pdf. Original public PDF, bytes preserved unchanged

SHA-256 of supplied file public-sources/DOC-072.pdf: 1affd70538c1e47d314df3355a635e72fe1d60674b281958570ec41e4a99e80f

CLM-045

DOC-073. Bettercoal. Financial Statements 2020

Date: 31 December 2020. Used: PDF 4, Balance sheet; PDF 4: balance sheet, approval 20 May 2021.

https://find-and-update.company-information.service.gov.uk/company/07968009/filing-history/MzMwNDg5NDkzNWFkaXF6a2N4/document?format=pdf&download=0

Acquisition: Saved PDF. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-045.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-073.pdf. Original public PDF, bytes preserved unchanged

SHA-256 of supplied file public-sources/DOC-073.pdf: 260b0dfd6242998824d3f347d1f24d660ce166264e6642a5439bf9a0caf58d5e

CLM-045

DOC-074. Bettercoal. Financial Statements 2021

Date: 31 December 2021. Used: PDF 4, Balance sheet; PDF 4: balance sheet; PDF 6: eight companies on the Board and the Executive Director.

https://find-and-update.company-information.service.gov.uk/company/07968009/filing-history/MzM0ODIyOTcwMWFkaXF6a2N4/document?format=pdf&download=0

Acquisition: Saved PDF. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-045.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-074.pdf. Original public PDF, bytes preserved unchanged

SHA-256 of supplied file public-sources/DOC-074.pdf: ac2c591ea3b9241c075c42c19d8546c00d664486f063f366ae928857b2099b64

CLM-045

DOC-075. Bettercoal. Financial Statements 2022

Date: 31 December 2022. Used: PDF 4, Balance sheet; PDF 4: balance sheet; PDF 7: Board membership and members.

https://find-and-update.company-information.service.gov.uk/company/07968009/filing-history/MzM4ODgxODczMmFkaXF6a2N4/document?format=pdf&download=0

Acquisition: Saved PDF. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-045.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-075.pdf. Original public PDF, bytes preserved unchanged

SHA-256 of supplied file public-sources/DOC-075.pdf: 8fa1192d67d0c3384980759ecd468748dea214a5320afee5100df2233c19e002

CLM-045

DOC-076. Companies House. Appointment of Frank Plümacher as a Bettercoal director

Date: 18 June 2019; filed 27 June 2019. Used: PDF 1, form AP01; visual reading of the scan; AP01, PDF 1: appointment as director on 18 June 2019. Uniper’s report dates election as Chair to April 2019; these are different roles and events.

https://find-and-update.company-information.service.gov.uk/company/07968009/filing-history/MzIzNzk3ODcyOWFkaXF6a2N4/document?format=pdf&download=0

Acquisition: Saved PDF. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-004.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-076-extract.html. Editorial text extract: not the complete original or a page image

SHA-256 of supplied file public-sources/DOC-076-extract.html: 49b7b16bf60df7bfcba1eaca9b89841f48e11f079a3916ce3301fc54a13db8a9

CLM-004

DOC-077. Volza. Suppliers of Uniper Global Commodities SE

Date: Page updated 26 September 2026. Used: Trade-data aggregator; the public table does not disclose individual shipment dates.

https://www.volza.com/company-profile/uniper-global-commodities-se-451916/import/suppliers/

Acquisition: Web reading / link from the baseline article. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Linked material; passages used are identified in the entry.

Preservation of the original: The complete source file is not preserved in the working archive.

Supplied file: File not included. No file is included in the public package; the source is available via the stated link when the website is accessible

DOC-078. Uniper. Sustainability Report 2017, Short version

Date: May 2018; reporting year 2017. Used: PDF 17, imprint.

https://www.uniper.energy/system/files/2024-04/uniper_group_sustainability_report_2017.pdf

Acquisition: Web reading / link from the baseline article. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Linked material; passages used are identified in the entry.

Preservation of the original: The complete source file is not preserved in the working archive.

Supplied file: File not included. No file is included in the public package; the source is available via the stated link when the website is accessible

DOC-079. Bettercoal suspends activities in Russia with immediate effect

Date: Statement dated 28 April 2022; page heading dated 3 May 2022. Used: Statement dated 28.04.2022; page published 03.05.2022; suspension of plan verification and of Russian producers’ use of their status.

https://www.bettercoal.org/news/bettercoal-suspends-activities-in-russia-with-immediate-effect

Acquisition: Saved web page. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-033.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-079-extract.html. Editorial text extract: not the complete original or a page image

SHA-256 of supplied file public-sources/DOC-079-extract.html: aaaa693a62bb1458942ae94dd614edeb58323705740bd43c4f2cf17ceba459cb

CLM-033

DOC-080. Cadastral engineer’s report dated 3 July 2019. Page 1 with personal data redacted

Date: 3 July 2019; inspection 26 April 2019. Used: Complete anonymised report page, 03.07.2019; full page 1: personal data, the inspected house’s address, coordinates and signature redacted. The distance concerns the house inspected, not Natalia’s flat.

#plate-23

Acquisition: Public copy with personal data redacted. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-035.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-080-public.png. Complete page with personal data redacted

SHA-256 of supplied file public-sources/DOC-080-public.png: 486cc2f3b9891bdaca843522c983d24579ce046d4e9287eafff3c3127b94857d

CLM-035

DOC-081. Uniper SE. Annual General Meeting on May 19, 2021 — Results of the Vote

Date: 19 May 2021; archived snapshot dated 21 May 2023, 16:25:34 UTC. Used: PDF 1, TOP 4; headings and results row; PDF 1, item 4. Valid votes: 322,950,342; in favour: 305,116,131; against: 17,834,211. Original address: https://www.uniper.energy/sites/default/files/2022-03/2021_AGM_Uniper_SE_Results_of_the_Vote_EN.pdf.

https://web.archive.org/web/20230521162534id_/https://www.uniper.energy/sites/default/files/2022-03/2021_AGM_Uniper_SE_Results_of_the_Vote_EN.pdf

Acquisition: Saved PDF. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Passages identified in claim cards CLM-039.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-081.pdf. Original public PDF, bytes preserved unchanged

SHA-256 of supplied file public-sources/DOC-081.pdf: 049e117496891b9d89a52e4eccc68cda59d695bfabbd6ca75013961e3700c7ce

CLM-039

DOC-082. Uniper. Sustainability resources — link to the article The dilemma of investing in social and environmental remediation activities

Date: Checked on 28 October 2026. Used: The former cr.uniper.energy address does not open; the later address /sustainability/dilemma-investing-social-and-environmental-remediation-activities redirects to Uniper’s home page. Text and verification details are preserved in the working archive.

https://www.uniper.energy/sustainability/sustainability-resources

Acquisition: Web reading / link from the baseline article. Recorded preservation: The precise acquisition time was not recorded; verified passages are identified above.

Reviewed: Linked material; passages used are identified in the entry.

Preservation of the original: The complete source file is not preserved in the working archive.

Supplied file: File not included. No file is included in the public package; the source is available via the stated link when the website is accessible

DOC-083. RECOSI. Annual Report 2025

Date: Reporting year 2025; published 17.08.2026. Used: PDF 12, Finance; PDF 18, Continuous Improvement Plan progress, key and footnote *; PDF 17, Welcoming producers; PDF 10–12, 16–18.

https://static1.squarespace.com/static/65a1303a13bfdc12f7331a58/t/6a82c9d4c6911b7d0ae857d4/1786956244393/RECOSI%2BAnnual%2BReport%2B2025.pdf

Acquisition: Saved PDF. Recorded preservation: 2026-10-28T19:34:16.982Z.

Reviewed: Passages identified in claim cards CLM-047, CLM-048, CLM-050.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-083.pdf. Original public PDF, bytes preserved unchanged

SHA-256 of supplied file public-sources/DOC-083.pdf: 9252782d7bf490f75c469678981e3f0757c3eb979d146c2f4c38904b02a99c38

CLM-047 · CLM-048 · CLM-050

DOC-084. Kemerovo Regional Court. Appellate decision No. 33-2762/2026

Date: 02.04.2026 (date within the document). Used: Decision of 02.04.2026, paragraphs on the final judgment of 28.05.2024; reasoning section.

https://sudact.ru/regular/doc/myR3PtM1MTg1/

Acquisition: Saved web page. Recorded preservation: 2026-10-28T19:34:19.448Z.

Reviewed: Passages identified in claim cards CLM-052.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-084-extract.html. Editorial text extract: not the complete original or a page image

SHA-256 of supplied file public-sources/DOC-084-extract.html: e23d26ac8712b9b5ea70f7bf65ee172b310c2e6bd77a60462281391da4299d0e

CLM-052

DOC-085. Kemerovo Regional Court. Appellate decision No. 33-2951/2026

Date: 26.03.2026 (date within the document). Used: Decision of 26.03.2026, paragraph beginning ‘During consideration of the criminal case’; reasoning section.

https://sudact.ru/regular/doc/KmSgPfasKygW/

Acquisition: Saved web page. Recorded preservation: 2026-10-28T19:34:19.449Z.

Reviewed: Passages identified in claim cards CLM-052.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-085-extract.html. Editorial text extract: not the complete original or a page image

SHA-256 of supplied file public-sources/DOC-085-extract.html: 69b6a9cac0c58fc7abaf3ae9dc729d448a6709bddd9f4f81e70155a97c6926a6

CLM-052

DOC-086. Prosecutor General’s Office. Announcement of the judgment against SDS executives; alternative address for DOC-021

Date: 25.03.2025. Used: HTML.

https://epp.genproc.gov.ru/ru/gprf/mass-media/news/main/e5606112/

Acquisition: Saved web page. Recorded preservation: 2026-10-28T19:34:19.450Z.

Reviewed: Prosecution announcement of the judgment; alternative address for DOC-021.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-086-original.html. Saved source HTML of the public page; bytes unchanged; external resources not included

SHA-256 of supplied file public-sources/DOC-086-original.html: 108113d297fc3bc20b6efb584e0f9bfc0e7720af891ef2c78bcbaf390530b534

DOC-087. RECOSI. Publication of the 2025 annual report

Date: 17.08.2026. Used: HTML.

https://www.recosi.com/news/recosi-launches-2025-annual-reportnbsp

Acquisition: Saved web page. Recorded preservation: 2026-10-28T19:34:21.294Z.

Reviewed: RECOSI announcement of the report’s release, heading and publication date.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-087-original.html. Saved source HTML of the public page; bytes unchanged; external resources not included

SHA-256 of supplied file public-sources/DOC-087-original.html: 4e1c5be32e4c92a634c350d8840798476a4abfb13dd88a03aabcd8dad1bbdb4a

DOC-088. Dutch Coal Covenant. Progress report 2017/18

Date: Reporting period: September 2017–October 2018. Used: PDF 24 / printed 24, right column, first paragraph; PDF 24 / printed 24, External Reporting; PDF 24.

https://www.rwe.com/-/media/RWE/documents/09-verantwortung-nachhaltigkeit/nl/Progress-report-on-the-voluntary-agreement-2018.pdf

Acquisition: Saved PDF. Recorded preservation: 2026-10-28T19:57:56.121Z.

Reviewed: Passages identified in claim cards CLM-051, CLM-055.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-088.pdf. Original public PDF, bytes preserved unchanged

SHA-256 of supplied file public-sources/DOC-088.pdf: 9f9d1fae72ef87183f35b0eecf41a91058a3b5b805da2649ba106c370b449a38

CLM-051 · CLM-055

DOC-089. Russian Emergencies Ministry. State report ‘On the Protection of the Population and Territories of the Russian Federation from Natural and Technological Emergencies in 2021’

Date: 2022; reporting period 2021. Used: Emergencies Ministry state report for 2021, PDF 34 / printed 34; PDF 34: accident of 25.11.2021 and death toll.

https://53.mchs.gov.ru/uploads/resource/2022-09-13/2021-god_166308006554935819.pdf

Acquisition: PDF from the Russian Emergencies Ministry’s official website. Recorded preservation: 2026-10-28T20:54:20.530Z.

Reviewed: Passages identified in claim cards CLM-030.

Preservation of the original: The source file is preserved in the working archive; its checksum has been checked.

Supplied file: public-sources/DOC-089-PDF34.pdf. PDF page 34 extracted from the state report; original page unmodified

SHA-256 of supplied file public-sources/DOC-089-PDF34.pdf: f2b3bdb6b004fe2171f28cd1188eed8a19fb1fe6a6e887c1ef4118f88700524b

CLM-030

Appendix A. Documentary pages

Below are reproductions of key pages and excerpts. Document covers were not recreated. Highlighting on marked copies was added by the editors; the original is available through the register link. The cadastral report uses a complete page with personal data redacted.

A1. SDS sites visited and covered

SDS sites visited and covered
Documentary figure A1. SDS sites visited and covered. DOC-020, PDF p. 4. 2019-01-09. Raster rendering of the complete PDF page, with content unchanged. Full source.

A2. Dates, team and interviewees of the SDS assessment

Dates, team and interviewees of the SDS assessment
Documentary figure A2. Dates, team and interviewees of the SDS assessment. DOC-020, PDF p. 5. 2019-01-09. Raster rendering of the complete PDF page, with content unchanged. Full source.

A3. Ratings 2.2 and 6.9 alongside Immediate Resolutions

Ratings 2.2 and 6.9 alongside Immediate Resolutions
Documentary figure A3. Ratings 2.2 and 6.9 alongside Immediate Resolutions. DOC-020, PDF p. 6. 2019-01-09. Complete page; red boxes added by the editors on a separate copy. Original DOC-020-p6.png preserved. Full source.

A3a. How to read the SDS group’s ratings

A3a. How to read the SDS group’s ratings
Original excerpt, highlighting added by the editors. DOC-020, PDF 6. Complete page in the preceding appendix; source PDF in the supplied archive.

Table headings: Meets; Substantially Meets; Partially Meets; Misses. The key on PDF 10 is reproduced in A4.

2.2 Whistleblowing / Grievance: Misses. 6.9 Health & Safety: Partially Meets. These are SDS-Ugol group ratings.

On the same PDF page 6: ‘There were no immediate resolutions found during the Assessment of Siberian Business Union Coal’. This is a separate urgency category; compliance ratings are shown in the table.

Comparison: the company’s statement of 20.03.2018 characterises the result as a positive conclusion of compliance. Bettercoal’s public report also contains the ratings shown. What problems lay behind them, when were they resolved, and who verified this?

Cards: CLM-019 · CLM-020 · CLM-054

A4. Key to compliance levels

Key to compliance levels
Documentary figure A4. Key to compliance levels. DOC-020, PDF p. 10. 2019-01-09. Raster rendering of the complete PDF page, with content unchanged. Full source.

A5. KRU assessment itinerary

KRU assessment itinerary
Documentary figure A5. KRU assessment itinerary. DOC-043, PDF p. 5. Historical public report. Raster rendering of the complete PDF page, with content unchanged. Full source.

A6. SUEK assessment sites

SUEK assessment sites
Documentary figure A6. SUEK assessment sites. DOC-044, PDF p. 5. 31 January 2020. Raster rendering of the complete PDF page, with content unchanged. Full source.

A7. Dates and mines of Taldinskaya Mining Company

Dates and mines of Taldinskaya Mining Company
Documentary figure A7. Dates and mines of Taldinskaya Mining Company. DOC-045, PDF p. 5. Historical public report. Raster rendering of the complete PDF page, with content unchanged. Full source.

A8. Uniper: assessments, chairmanship and 2019 purchases

Uniper: assessments, chairmanship and 2019 purchases
Documentary figure A8. Uniper: assessments, chairmanship and 2019 purchases. DOC-003, PDF p. 54. Report for 2019; published in 2020. Raster rendering of the complete PDF page; content unchanged. Full source.

A9. Uniper: Russian programme and reporting frequency

Uniper: Russian programme and reporting frequency
Documentary figure A9. Uniper: Russian programme and reporting frequency. DOC-003, PDF p. 63. Report for 2019; published in 2020. Raster rendering of the complete PDF page; content unchanged. Full source.

A10. 2020 purchases and the inclusion of Latvia

2020 purchases and the inclusion of Latvia
Documentary figure A10. 2020 purchases and the inclusion of Latvia. DOC-004, PDF p. 74. Report for 2020. Raster rendering of the complete PDF page; content unchanged. Full source.

A11. 2021 purchases

2021 purchases
Documentary figure A11. 2021 purchases. DOC-005, PDF p. 46. Report for 2021; published in 2022. Raster rendering of the complete PDF page; content unchanged. Full source.

A12. Vote: agenda item and 94.48%

Vote: agenda item and 94.48%
Documentary figure A12. Vote: agenda item and 94.48%. DOC-081, PDF p. 1. 19 May 2021; archived snapshot dated 21 May 2023, 16:25:34 UTC. Highlighting added by the editors; separate copy. Full source.

A13. Fortum’s answer to question 39

Fortum’s answer to question 39
Documentary figure A13. Fortum’s answer to question 39. DOC-052, PDF p. 16. 2022. Complete page; red-box highlighting added by the editors; source PDF preserved separately. Full source.

A13a. Exactly what Fortum was asked and what the company answered

A13a. Exactly what Fortum was asked and what the company answered
Original excerpt, highlighting added by the editors. DOC-052, PDF 16. Complete page in the preceding appendix; source PDF in the supplied archive.

Question 39: ‘In November 2021 more than 50 miners were killed in a mine accident at the Listvyazhnaya mine in the Kemerovo region. Poor safety measures are the probable cause of the accident. Has Fortum or Uniper investigated the circumstances of the accident? Did Fortum or Uniper get coal deliveries from this mine?’ This is the shareholder’s wording.

Answer: ‘Neither Fortum or Uniper has been purchasing coal from this supplier in the past years. Both Fortum and Uniper are members of Bettercoal initiative. Since the supplier in question is also a Bettercoal supplier, the Bettercoal secretariat is engaging with the company to understand the exact causes of the accident and the actions necessary to prevent such an accident in the future.’

The question names the mine; the answer uses ‘this supplier’ and does not specify precise years. A purchasing history for the SDS group requires sellers, dates, volumes and mines of origin.

Cards: CLM-040

A14. Chair’s foreword and the absence of site visits in 2021

Chair’s foreword and the absence of site visits in 2021
Documentary figure A14. Chair’s foreword and the absence of site visits in 2021. DOC-056, PDF p. 3. Published 28 July 2022. Raster rendering of the complete PDF page; content unchanged. Full source.

A15. December 2021 webinar on Russian plans

December 2021 webinar on Russian plans
Documentary figure A15. December 2021 webinar on Russian plans. DOC-056, PDF p. 20. Published 28 July 2022. Raster rendering of the complete PDF page; content unchanged. Full source.

A16. Uniper employee in the secretariat and information provided to the Board

Uniper employee in the secretariat and information provided to the Board
Documentary figure A16. Uniper employee in the secretariat and information provided to the Board. DOC-088, PDF p. 24. Reporting period: September 2017–October 2018. Complete page; red-box highlighting added by the editors; source PDF preserved separately. Full source.

A16a. Uniper employee and information for the Supervisory Board

A16a. Uniper employee and information for the Supervisory Board
Original excerpt, highlighting added by the editors. DOC-088, PDF 24. Complete page in the preceding appendix; source PDF in the supplied archive.

Upper box. To support Bettercoal’s secretariat in its assessment programme and procedures, a Uniper employee was seconded there for two years to help monitor suppliers’ implementation of improvement plans.

Lower box, External Reporting section. The company’s Supervisory Board regularly receives updates on Uniper’s responsible coal sourcing.

The intervening paragraphs describe observing an assessment in the USA and contacts with NGOs. The two highlighted relationships are recorded separately: secretariat support and information provided to the Supervisory Board. The seconded employee’s name, employment dates and the plans’ geographical scope are not stated in this excerpt.

Cards: CLM-051 · CLM-055

A17. RECOSI expenditure for 2025

RECOSI expenditure for 2025
Documentary figure A17. RECOSI expenditure for 2025. DOC-083, PDF p. 12. Reporting year 2025; published 17.08.2026. Raster rendering of the complete PDF page, with content unchanged. Full source.

A18. 2025 results: read using the key

2025 results: read using the key
Documentary figure A18. 2025 results: read using the key. DOC-083, PDF p. 18. Reporting year 2025; published 17.08.2026. Raster rendering of the complete PDF page, with content unchanged. Full source.

A19. Code 1.1: participation and reporting violations

Code 1.1: participation and reporting violations
Documentary figure A19. Code 1.1: participation and reporting violations. DOC-053, PDF p. 14. Approved 28 June 2017; July 2018 edition. Raster rendering of the complete PDF page, with content unchanged. Full source.

A20. Code 1.1: health and safety

Code 1.1: health and safety
Documentary figure A20. Code 1.1: health and safety. DOC-053, PDF p. 22. Approved 28 June 2017; July 2018 edition. Raster rendering of the complete PDF page, with content unchanged. Full source.

A21. Code 1.1: air, dust and biodiversity

Code 1.1: air, dust and biodiversity
Documentary figure A21. Code 1.1: air, dust and biodiversity. DOC-053, PDF p. 29. Approved 28 June 2017; July 2018 edition. Raster rendering of the complete PDF page, with content unchanged. Full source.

A22. Uniper’s account of visiting Kiselyovsk

Uniper’s account of visiting Kiselyovsk
Documentary figure A22. Uniper’s account of visiting Kiselyovsk. DOC-001. May 2020. Image of the preserved HTML; external styling not restored; highlighting added by the editors. Full source.

Highlighted passage and the preceding sentence: ‘For example, while in Kuzbass in September 2019, as part of a Bettercoal mission, we managed to see the town of Kiselovsk, mentioned by the NGO Ecodefense as one of the most impacted by mining. Even if we stayed there for a very short time, it was sufficient to recognize how close to houses the mining operations are.’

The company then describes visiting Chuvashka. In the next paragraph, Uniper reports contacts with local stakeholders on resettlement and consideration of opportunities to rehabilitate abandoned mining areas. These paragraphs are preserved in the image.

What the document shows: Uniper itself identifies the place, month, mission and its observation of mining beside homes. Individual delegation members are not named here. See CLM-034.

Source: Uniper, The dilemma of investing in social and environmental remediation activities. The page gives May 2020; the precise publication day is not stated. Archived snapshot: 18 June 2020, 23:01:43 UTC. Open archived copy. Original address.

Address check on 28 October 2026: the original cr.uniper.energy address was unavailable; the host name did not resolve. The archived copy returned HTTP 200. The later www.uniper.energy address redirected to the home page when opened through web viewing; a separate automated request received HTTP 403. These results do not establish why availability changed.

The image is a browser capture of the preserved source HTML. The text was not retyped; the website’s external styling was not restored. Red underlining was added by the editors on a separate copy. The HTML and unhighlighted image are included in the sources package.

A23. The house inspected and the waste-rock dump: 461.98 metres

The house inspected and the waste-rock dump: 461.98 metres
Documentary figure A23. The house inspected and the waste-rock dump: 461.98 metres. DOC-080, PDF p. 1. 3 July 2019; inspection 26 April 2019. Personal data redacted; complete page. Full source.

A24. Documentary publication featuring fire

Documentary publication featuring fire
Documentary figure A24. Documentary publication featuring fire. DOC-032. 21 August 2020. Image from the blog publication; not reconstructed. Full source.

A25. Balance sheet for 2017

Balance sheet for 2017
Documentary figure A25. Balance sheet for 2017. DOC-070, PDF p. 4. 31 December 2017. Complete balance-sheet page from the saved PDF. Full source.

A26. Balance sheet for 2018

Balance sheet for 2018
Documentary figure A26. Balance sheet for 2018. DOC-071, PDF p. 4. 31 December 2018. Complete balance-sheet page from the saved PDF. Full source.

A27. Balance sheet for 2019

Balance sheet for 2019
Documentary figure A27. Balance sheet for 2019. DOC-072, PDF p. 4. 31 December 2019. Complete balance-sheet page from the saved PDF. Full source.

A28. Balance sheet for 2020

Balance sheet for 2020
Documentary figure A28. Balance sheet for 2020. DOC-073, PDF p. 4. 31 December 2020. Complete balance-sheet page from the saved PDF. Full source.

A29. Balance sheet for 2021

Balance sheet for 2021
Documentary figure A29. Balance sheet for 2021. DOC-074, PDF p. 4. 31 December 2021. Complete balance-sheet page from the saved PDF. Full source.

A30. Balance sheet for 2022

Balance sheet for 2022
Documentary figure A30. Balance sheet for 2022. DOC-075, PDF p. 4. 31 December 2022. Complete balance-sheet page from the saved PDF. Full source.

A31. Judgment concerning the Mikon III system in the decision of 2 April 2026

A31. Judgment concerning the Mikon III system in the decision of 2 April 2026
Image of an excerpt from the saved web page; highlighting added by the editors. DOC-084. Decision date: 02.04.2026; reasoning section. Full court decision. Unboxed image supplied in public-sources/DOC-084-court-original.png.

Kemerovo Regional Court cites the final judgment of Belovo City Court dated 28.05.2024: the chief engineer was found guilty under part 5 of article 274.1 of the Russian Criminal Code. The next paragraph describes breaches of operating rules for the Mikon III system and consequences established in the criminal case. The image contains these two paragraphs, without family or financial details of the civil dispute.

Card CLM-052: complete selected excerpt and analysis.

A32. The same criminal case in the decision of 26 March 2026

A32. The same criminal case in the decision of 26 March 2026
Image of an excerpt from the saved web page; highlighting added by the editors. DOC-085. Decision date: 26.03.2026; reasoning section. Full court decision. Unboxed image supplied in public-sources/DOC-085-court-original.png.

In another civil case, the regional court also recounts the criminal episode involving breaches of the Mikon III operating rules. This is a judicial account of the same episode, rather than a second independent technical investigation into the accident’s causes. Anonymous identifiers are retained as in the court publication; they require no translation.

Card CLM-052: complete selected excerpt and analysis.

Appendix B. Natalia’s questions for the picket

Tomorrow, 29 October 2026, I am going to hold a one-person picket outside Uniper in Düsseldorf. I want a meeting and a substantive conversation. Below are the questions I intend to ask. Today, I do not yet know whether company representatives will come out to speak to me, whether a meeting will take place or whether I will receive answers.

The visit to Kiselyovsk and conversations with residents

  1. Did Uniper representatives visit Kiselyovsk in September 2019 as part of the Bettercoal delegation? Who exactly took part in the visit?
  2. Who organised the visit to the town, drew up the itinerary and accompanied your delegation?
  3. Did you meet residents of Kiselyovsk? If so, whom did you meet, who selected the interviewees, and what problems did they raise? If not, why not?
  4. Could residents speak to you without representatives of coal companies or the local administration present?
  5. Before the visit, were you aware of the appeal by Kiselyovsk residents to the Prime Minister of Canada dated 8 June 2019? Had you seen material published by Novosti Kiselyovska?
  6. What material did you receive from Ecodefense before the visit? Did it include any of my articles or videos, or information about my work?
  7. Was the possibility of meeting me, Natalia Zubkova, discussed? If so, what decision was made, and why did the meeting not take place?
  8. In your article, you described how close mining operations were to residential homes. What conclusions did you draw about the consequences for residents, including children?

Assessments of operations, violations and verification

  1. Listvyazhnaya was among the sites included in Bettercoal’s 2017 site assessment. What deficiencies were identified at this particular mine, and what measures were included in the improvement plan?
  2. How did Bettercoal check that these measures were implemented before the disaster of 25 November 2021? When was the last check, what did it find, and to whom were the results reported?
  3. Did Bettercoal receive information about industrial safety violations at Listvyazhnaya in 2021? If so, how did it respond? If not, how was the assessment of such risks organised?
  4. After the disaster, Bettercoal announced its intention to establish the causes and the preventive measures required. What were the results of this work? Where can the findings and decisions be consulted?
  5. What specific requirements did you impose on suppliers after the visit? What did they have to change, by when, and who checked implementation?

Coal purchases

  1. Why did Uniper continue buying Russian coal after visiting Kiselyovsk? How did what you saw affect purchasing decisions?
  2. From which Russian producers and operations did you buy coal in 2019–2022? Can you provide information on the volumes and origins of supplies?

Persecution of journalists and activists

  1. The TDI report for Bettercoal’s working group discusses intimidation of environmental activists by coal companies. How did you respond to this information?
  2. What measures did you put in place to enable residents and journalists to report violations to you without fear of persecution?
  3. When did you learn of the threats and attacks against me? Did you consider the 2021 reports by CPJ and Reporters Without Borders? What action did you take?

Results, executives’ decisions and a meeting

  1. What specific changes for Kiselyovsk residents resulted from your visit and subsequent work? Can you identify projects and time frames and show documents confirming their implementation?
  2. Frank Plümacher, how does your experience as Bettercoal Chair inform your current work as Uniper’s Human Rights Officer? How do you assess the results of this work for residents of Russia’s coal-mining regions?
  3. Nadja Wendler, what action are you prepared to take as Uniper’s sustainability executive and a member of RECOSI’s Board of Directors to ensure substantive answers to these questions?
  4. Are you prepared to meet me, listen to my story and provide written answers supported by documents?

But the most important question for me concerns my own life.

What did I do that was wrong back in Kiselyovsk, when I reported on black snow and on how people live beside coal operations? And what am I doing wrong here in Germany that means I have to live in these conditions?

I want you to listen to my story. What would you do in my place? How would you build your life from here and secure your child’s future?

Appendix C. How to verify and reproduce the results

Shared primary-source archive: Bettercoal_Uniper_Research_RU_V03_sources.zip. This unchanged evidence corpus serves both language editions. Original filenames, Russian research metadata, public-sources, source-transfer.json and SHA256SUMS.txt are retained. It is not the editable source of EN_V04.

English-edition source archive: Bettercoal_Uniper_Research_EN_V04_sources.zip. It contains Bettercoal_Uniper_Research_EN_V04.html, editable English SVGs in visuals, CSV tables in datasets, claims-en.json, evidence-register-en.json, quote-language-review.json, production scripts and SHA256SUMS.txt. The HTML embeds all fonts and documentary images.

The delivery manifest SHA256SUMS_EN_V04.txt lists the PDF, English HTML, both archives and the change list with their checksums. No new public download URL is stated.

Reproducing EN_V04. Extract the English archive separately. Verify it with Verify-SHA256.ps1 or the Node verifier before editing. The HTML is the master: changes to SVG/CSV exports must also be made in their inline HTML counterparts. Follow README_EN.txt for scripts and dependencies. After rebuilding, update contents page numbers and verify DOC/CLM links.

Checking primary sources. Extract the shared archive separately. Verify public-sources against SHA256SUMS.txt and source-transfer.json. It contains supplied primary documents, redacted pages and labelled extracts; complete private documents are excluded. Its data.mjs, claims.json, evidence-register.json and content metadata describe Russian V03, not the editable English edition.

Checking numbers: each producer’s three statuses must sum to its item total; the four plans total 210. Financial values are checked against page 4 of each balance sheet. Purchasing shares are checked against the category and footnote, not just the figure. Bar scales start at zero. A missing value is not replaced with zero.

Checking a claim: find its CLM in the correspondence table, open the card, then the DOC and specified page. For a court decision’s date, use its internal heading. To match an operation, check the legal entity and type of work suspended. Establishing knowledge requires an incoming document with a receipt date.

SHA-256 verifies file integrity. source-transfer.json identifies the evidence files; the English manifest lists EN_V04 sources. Editing or re-exporting changes hashes: preserve earlier versions and regenerate the manifest. Rebuilding the English PDF leaves primary documents unchanged. External-address results are those recorded in the underlying research; they were not rechecked for EN_V04.