Companies and evidence of their links to Khakassian coal
Information on buyers, consumers and possible purchases has different levels of confirmation. A historical report does not establish current supplies. No letters on this subject have yet been sent.
1. Mezhregiontop LLC
- Role and status
- Confirmed buyer from Mayrykhsky; final site of use not established
- Coal origin
- Grade D coal under a contract with Mayrykhsky Open-Pit Mine Coal Company LLC
- Period
- Deliveries on 17.12.2022, 22.01.2023 and 30.06.2023
- Evidence
- Judgment of the Commercial Court of the Republic of Khakassia of 01.09.2025 in case А74-12368/2024, contract No. 115-2022 of 02.12.2022, and three signed delivery notes. The text used provides no data on uranium or radiological testing of the consignments
2. The National Coal Supply Corporation Ltd
- Role and status
- Possible buyer from Mayrykhsky; IEC coal supply company
- Evidence
- Named as a buyer by Trademo; the original declaration was not obtained. The IEC 2023 report, PDF p. 316, independently confirms supply to Orot Rabin and Rutenberg, but not the origin of a particular consignment
3. Ecocarbon Ltd
- Role and status
- Trade aggregator information; not an established end user
- Coal origin
- Mayrykhsky, according to the Trademo aggregator
- Evidence
- The original declaration and precise legal identification were not obtained
4. Novosibirsk CHP-2
- Role and status
- End user
- Coal origin
- Stepnoy, Khakassia
- Period
- Report from early 2022; current supplies not established
- Evidence
- Argus industry report
5. Novosibirsk CHP-4
- Role and status
- End user
- Coal origin
- Stepnoy, Khakassia
- Period
- Report from early 2022; current supplies not established
- Evidence
- Argus industry report
6. Apatity CHP plant
- Role and status
- End user
- Coal origin
- Stepnoy, Khakassia
- Period
- Report from early 2022
- Evidence
- Argus industry report. TGC-1’s annual report for 2019 also reports purchases of Khakassian coal; the link between that table and this plant has not been established.
7. Artyom CHP plant
- Role and status
- End user
- Coal origin
- Stepnoy, Khakassia
- Period
- Report from early 2022
- Evidence
- Argus industry report
8. Barnaul CHP-2
- Role and status
- End user
- Coal origin
- Khakassian grade D coal; the passage found does not name a particular mine
- Period
- Document ТР 38752107-2017
- Evidence
- Technical operating regulations ТР 38752107-2017 on SGC’s official website, PDF p. 8, section 3: combustion of Khakassian grade D coal together with Kuznetsk grade SS coal.
9. Magadan CHP plant
- Role and status
- End user
- Coal origin
- Chernogorsk deposit, Khakassia; supplier: Kamchatka Shipping Company LLC
- Period
- 28 January 2020
- Evidence
- Kolyma.ru report attributed to Magadanenergo on fuel use and testing. A separate original company publication has not been identified.
- Note
- Suitability of fuel for boilers must not be equated with confirmed radiological analysis
10. Cherepovets GRES power station
- Role and status
- Historical end user
- Coal origin
- Stepnoy, Chernogorsk Coal Company, Khakasrazrezugol and Vostochno-Beysky are listed in the report
- Period
- OGK-2 annual report for 2013
- Evidence
- OGK-2 annual report for 2013, PDF p. 10 (printed pp. 15–16). Historical information, not confirmation of current use.
11. Inta CHP plant
- Role and status
- Possible consumer: announced purchase and planned fuel switch
- Coal origin
- Khakassia; mine not specified
- Period
- 21 April 2020: a switch from September and the purchase of 25 thousand tonnes were announced
- Evidence
- Armtorg report quoting a T Plus representative on the purchase and planned switch; actual use has not been established.
12. Sorsk CHP plant
- Role and status
- End user according to the regional planning scheme
- Coal origin
- Chernogorsk hard coal, Russian Coal JSC
- Period
- Regional planning scheme issued in 2021 for 2022–2026
- Evidence
- Regional planning scheme issued in 2021 for 2022–2026. The exact table and the distinction between current and planned fuel in the passage used have not been established.
13. Severodvinsk CHP-1
- Role and status
- Possible consumer
- Coal origin
- Khakassian coal; mine not established
- Evidence
- Secondary description in Wikipedia; an original TGC-2 source has not been identified.
14. CSTI Limited
- Role and status
- Buyer/intermediary; not established as an end user
- Coal origin
- Mayrykhsky
- Evidence
- Mayrykhsky’s own statement about its main buyer; the date and period require clarification
15. TAQA SOLUTIONS DMCC
- Role and status
- Trade aggregator information; not a confirmed end user
- Coal origin
- ULK Arshanovsky Mine, according to the aggregator’s profile
- Evidence
- Public Volza excerpt, destination South Korea; the complete original transport document was not obtained
16. BX Energy Limited
- Role and status
- Contractual counterparty in the court records obtained; end user not established
- Coal origin
- Dispute with Stepnoy Open-Pit Mine Coal Company JSC; third party: Okto Ugol LLC
- Period
- Contract dated 28.10.2021; withdrawal from the contract on 24.07.2024; court proceedings in 2025–2026
- Evidence
- Case А40-272558/2024: operative judgment of 18.06.2025 and Supreme Court ruling of 29.05.2026, No. 305-ЭС26-3861. Contract dated 28.10.2021; these decisions do not establish actual volumes or final recipients.
Questions for future correspondence
- Did you buy coal from the particular mine named, directly or through intermediaries, in which years and for which sites?
- Which indicators of radionuclide and elemental composition were tested, and which methods and criteria were used?
- Please provide test reports, sampling dates and consignment identifiers, with commercially sensitive information redacted where appropriate.
- Who collected the samples and performed the tests, and how was representativeness ensured?
- Were ash, slag and water tested at the site of use, and can the results be made available?